Site Address:Â
|
1001 N COAST HWY OCEANSIDE, CA 92054-2135
|
Site APN:Â
|
1430402600
|
Subdivision:Â
|
|
Site Block:Â
|
|
Site Lot:Â
|
|
Valuation:Â
|
$78,628,058.00
|
Site Tract:Â
|
|
Permit Status:Â
|
ISSUED
|
|
Description of Work:
|
5-STORY MIXED USE DEVELOPMENT WITH 309 UNITS
|
|
|
Contractor:
|
W P WEST BUILDERS CALIFORNIA LP
|
Address:
|
36 DISCOVERY SUITE 140 IRVINE CA 92618
|
Phone:
|
(949) 260-9960
|
|
Technical Information:
|
PLAN ID # | |
PERMIT # | |
BIN # | ELECTRONIC |
SPRINKLER | 1 |
REDEV AREA | |
HOT WATER CONSERVATION | |
FLOOD ZONE | X |
COASTAL ZONE | |
OCC GROUP | R2, B, A2, A3, S2 |
TYPE CONST | IIIA, IB |
USE CODE | |
EXISTING BLDG SF | |
OCC LOAD | |
UNITS | 309 |
STATE CODE EDITION | 2019 |
BLDG SF | 305811 |
NO STORIES | 0 |
ELECTRIC RELEASED BY | BING COSBY |
NOTIFIED SDGE BY | EMAIL |
DATE ELECTRIC RELEASED | 4/22/2024 |
ELECTRIC RELEASE TYPE | NEW (NEW SERVICE) |
TYPE OF BUILDING | CND (CONDOMINIUM) |
GAS RELEASED BY | BING COSBY |
NOTIFIED SDGE BY | EMAIL |
DATE GAS RELEASED | 5/8/2024 |
GAS RELEASE TYPE | NEW (NEW SERVICE) |
WDID # | |
|
|
|
Owner:
|
P R II/WOOD OCEANSIDE LLC
|
Address:
|
11849 W OLYMPIC BLVD #204 LOS ANGELES CA 92064
|
Phone:
|
|
|
|
|
WORKERS COMPENSATION DECLARATION
|
WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES.
I hereby affirm under penalty of perjury one of the following declarations:
____ I have and will maintain a certificate of consent to self-insure for workers' compensation, issued by the Director of Industrial Relations as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued.
Policy No.
____ I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are:
Carrier: Policy Number: Expiration Date:
____ I certify that, in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that, if I should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those provisions.
|
LICENSED CONTRACTOR'S DECLARATION
|
I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and my license is in full force and effect.
License No:
Expiration Date:
Contractor:
Class:
|
|
|
Inspections:
|
120 FOOTINGS | PASS | 1/28/2022 | BING COSBY |
220 CONCRETE PANELS | PASS | 4/18/2022 | MARK WILLIAMS |
220 CONCRETE PANELS | NOT READY | 4/15/2022 | BING COSBY |
115 FOOTINGS | PASS | 6/2/2022 | BING COSBY |
265 CONCRETE COLUMNS | PASS | 6/1/2022 | BING COSBY |
250 CONCRETE SLAB | PASS | 6/22/2022 | BING COSBY |
410 PLB UNDERGROUND | PASS | 7/18/2022 | BING COSBY |
415 PLB UNDERGROUND | PASS | 8/11/2022 | BING COSBY |
321 DIAPHRAGM FLOOR | PASS | 8/30/2022 | BING COSBY |
350 FRAMING | PASS | 12/8/2022 | BING COSBY |
425 PLUMB ROUGH | PASS | 2/3/2023 | BING COSBY |
315 FRAME | PASS | 2/7/2023 | BING COSBY |
605 INSULATION | PASS | 5/1/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 6/26/2023 | BING COSBY |
705 WALL BOARD | PASS | 6/29/2023 | BING COSBY |
525 ELECT ROUGH | PASS | 7/5/2023 | BING COSBY |
430 PLUMB MISC | PASS | 12/6/2023 | BING COSBY |
705 WALL BOARD | PASS | 12/28/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 1/23/2024 | BING COSBY |
FIRE LUMBER DROP | PASS | 5/2/2022 | TIMOTHY HUERTA |
322 DIAPHRAGM SHEAR | PASS | 4/10/2023 | MARK WILLIAMS |
315 FRAME | PASS | 10/19/2022 | BING COSBY |
415 PLB UNDERGROUND | PASS | 10/20/2022 | BING COSBY |
415 PLB UNDERGROUND | PASS | 10/21/2022 | MARK WILLIAMS |
315 FRAME | SAME DAY CANCEL | 11/8/2022 | BING COSBY |
315 FRAME | PASS | 11/9/2022 | BING COSBY |
315 FRAME | PASS | 11/21/2022 | BING COSBY |
321 DIAPHRAGM FLOOR | PASS | 11/21/2022 | BING COSBY |
315 FRAME | PASS | 1/12/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | NOT READY | 1/18/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PARTIAL | 6/21/2023 | DUSTIN STOTLER |
605 INSULATION | PARTIAL | 6/21/2023 | DUSTIN STOTLER |
250 CONCRETE SLAB | PASS | 4/11/2022 | BING COSBY |
REBAR | PASS | 4/18/2022 | MARK WILLIAMS |
120 FOOTINGS | PASS | 5/12/2022 | BING COSBY |
210 CMU REBAR | PASS | 5/25/2022 | BING COSBY |
210 CMU REBAR | PASS | 6/8/2022 | BING COSBY |
415 PLB UNDERGROUND | PASS | 6/9/2022 | BING COSBY |
415 PLB UNDERGROUND | PASS | 7/5/2022 | BING COSBY |
120 FOOTINGS | PASS | 10/12/2022 | MARK WILLIAMS |
120 FOOTINGS | PASS | 11/10/2022 | BING COSBY |
315 FRAME | PASS | 12/20/2022 | BING COSBY |
315 FRAME | PASS | 12/22/2022 | BING COSBY |
315 FRAME | PASS | 1/30/2023 | BING COSBY |
210 CMU REBAR | PASS | 4/29/2022 | BING COSBY |
410 PLB UNDERGROUND | PASS | 5/11/2022 | BING COSBY |
410 PLB UNDERGROUND | PASS | 5/27/2022 | BING COSBY |
210 CMU REBAR | PASS | 6/6/2022 | BING COSBY |
265 CONCRETE COLUMNS | PASS | 6/14/2022 | BING COSBY |
210 CMU REBAR | PASS | 6/20/2022 | BING COSBY |
250 CONCRETE SLAB | PASS | 6/28/2022 | BING COSBY |
415 PLB UNDERGROUND | NOT READY | 7/12/2022 | BING COSBY |
415 PLB UNDERGROUND | PASS | 7/19/2022 | BING COSBY |
120 FOOTINGS | PASS | 8/4/2022 | BING COSBY |
705 WALL BOARD | PASS | 8/15/2022 | BING COSBY |
710 WALL BOARD | PASS | 8/29/2022 | BING COSBY |
495 PLB UNDERGROUND | PASS | 9/2/2022 | BING COSBY |
715 WALL BOARD | PASS | 9/6/2022 | BING COSBY |
410 PLB UNDERGROUND | NOT READY | 9/8/2022 | BING COSBY |
415 PLB UNDERGROUND | PASS | 9/9/2022 | MARK WILLIAMS |
505 ELEC UNDERGROUND | PASS | 9/14/2022 | BING COSBY |
210 CMU REBAR | PASS | 9/16/2022 | BING COSBY |
495 PLB UNDERGROUND | PASS | 9/21/2022 | BING COSBY |
410 PLB UNDERGROUND | SAME DAY CANCEL | 9/27/2022 | MARK WILLIAMS |
115 FOOTINGS | PASS | 9/29/2022 | BING COSBY |
210 CMU REBAR | PASS | 9/29/2022 | BING COSBY |
115 FOOTINGS | PASS | 11/1/2022 | MARK WILLIAMS |
321 DIAPHRAGM FLOOR | PASS | 11/1/2022 | MARK WILLIAMS |
315 FRAME | PASS | 2/21/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | PASS | 2/21/2023 | BING COSBY |
120 FOOTINGS | NO INSPECTION | 2/1/2022 | BING COSBY |
120 FOOTINGS | PASS | 2/4/2022 | BING COSBY |
210 CMU REBAR | PASS | 2/14/2022 | BING COSBY |
210 CMU REBAR | PASS | 2/18/2022 | BING COSBY |
410 PLB UNDERGROUND | PASS | 2/22/2022 | BING COSBY |
410 PLB UNDERGROUND | PASS | 2/23/2022 | BING COSBY |
210 CMU REBAR | PASS | 2/24/2022 | BING COSBY |
210 CMU REBAR | PASS | 3/1/2022 | BING COSBY |
120 FOOTINGS | PASS | 3/1/2022 | BING COSBY |
120 FOOTINGS | PASS | 3/10/2022 | BING COSBY |
250 CONCRETE SLAB | PASS | 7/26/2022 | BING COSBY |
210 CMU REBAR | PASS | 7/26/2022 | BING COSBY |
322 DIAPHRAGM SHEAR | PASS | 2/9/2023 | BING COSBY |
323 DIAPHRAGM ROOF | PASS | 3/3/2023 | BING COSBY |
315 FRAME | PASS | 3/9/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | PASS | 3/9/2023 | BING COSBY |
705 WALL BOARD | PASS | 3/9/2023 | BING COSBY |
315 FRAME | PASS | 3/28/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | PASS | 3/28/2023 | BING COSBY |
715 WALL BOARD | PASS | 3/28/2023 | BING COSBY |
425 PLUMB ROUGH | PASS | 4/4/2023 | BING COSBY |
620 INSULATION | PASS | 4/4/2023 | BING COSBY |
710 WALL BOARD | PASS | 4/4/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | NO INSPECTION | 4/6/2023 | BING COSBY |
321 DIAPHRAGM FLOOR | PASS | 4/25/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | PASS | 4/27/2023 | BING COSBY |
620 INSULATION | PASS | 4/28/2023 | BING COSBY |
321 DIAPHRAGM FLOOR | SAME DAY CANCEL | 5/4/2023 | MARK WILLIAMS |
321 DIAPHRAGM FLOOR | PASS | 5/10/2023 | BING COSBY |
321 DIAPHRAGM FLOOR | PASS | 5/12/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | PASS | 5/12/2023 | BING COSBY |
605 INSULATION | PASS | 5/12/2023 | BING COSBY |
710 WALL BOARD | PASS | 5/12/2023 | BING COSBY |
323 DIAPHRAGM ROOF | SAME DAY CANCEL | 5/23/2023 | BING COSBY |
605 INSULATION | SAME DAY CANCEL | 5/23/2023 | BING COSBY |
305 FRAME (W/M,P | PASS | 5/31/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | PASS | 5/31/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | PASS | 6/1/2023 | BING COSBY |
705 WALL BOARD | PASS | 6/1/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | PASS | 6/6/2023 | BING COSBY |
605 INSULATION | PASS | 6/6/2023 | BING COSBY |
340 SHEAR & DIAPHRAGM | PASS | 6/6/2023 | BING COSBY |
730 LATH | PASS | 6/7/2023 | BING COSBY |
605 INSULATION | PASS | 6/13/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 6/13/2023 | BING COSBY |
730 LATH | PASS | 6/13/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 6/14/2023 | BING COSBY |
323 DIAPHRAGM ROOF | PASS | 6/14/2023 | BING COSBY |
605 INSULATION | PASS | 6/15/2023 | BING COSBY |
605 INSULATION | PASS | 6/16/2023 | MARK WILLIAMS |
710 WALL BOARD | PASS | 6/20/2023 | DUSTIN STOTLER |
605 INSULATION | PASS | 6/23/2023 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 6/23/2023 | CHRIS BABCOCK |
305 FRAME (W/M,P&E) | PASS | 6/27/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | PASS | 6/27/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 6/28/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | PASS | 6/28/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 7/6/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 7/6/2023 | BING COSBY |
605 INSULATION | PASS | 7/6/2023 | BING COSBY |
605 INSULATION | PASS | 7/6/2023 | BING COSBY |
323 DIAPHRAGM ROOF | PASS | 7/11/2023 | BING COSBY |
605 INSULATION | PASS | 7/11/2023 | BING COSBY |
705 WALL BOARD | PASS | 7/11/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | PASS | 7/19/2023 | BING COSBY |
605 INSULATION | PASS | 7/19/2023 | BING COSBY |
605 INSULATION | SAME DAY CANCEL | 7/20/2023 | BING COSBY |
310 FRAME (W/M.P.E) | PASS | 8/10/2023 | BING COSBY |
710 WALL BOARD | PASS | 8/10/2023 | BING COSBY |
605 INSULATION | PARTIAL | 8/16/2023 | ERIC WYNGAARDEN |
322 DIAPHRAGM SHEAR | PASS | 8/17/2023 | BING COSBY |
425 PLUMB ROUGH | PASS | 8/17/2023 | BING COSBY |
730 LATH | PASS | 8/17/2023 | BING COSBY |
710 WALL BOARD | PASS | 8/17/2023 | BING COSBY |
710 WALL BOARD | PASS | 8/17/2023 | BING COSBY |
710 WALL BOARD | PASS | 8/17/2023 | BING COSBY |
605 INSULATION | PASS | 8/22/2023 | BING COSBY |
710 WALL BOARD | PASS | 8/22/2023 | BING COSBY |
605 INSULATION | PARTIAL | 8/31/2023 | DUSTIN STOTLER |
310 FRAME (W/M.P.E) | PASS | 9/1/2023 | BING COSBY |
615 INSULATION | PASS | 9/1/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 9/6/2023 | BING COSBY |
605 INSULATION | PASS | 9/7/2023 | DUSTIN STOTLER |
305 FRAME (W/M,P&E) | PASS | 9/12/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 9/12/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | PASS | 9/13/2023 | BING COSBY |
705 WALL BOARD | PASS | 9/13/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | PASS | 9/14/2023 | BING COSBY |
710 WALL BOARD | PASS | 9/14/2023 | BING COSBY |
350 FRAMING | PASS | 9/15/2023 | BING COSBY |
495 PLB UNDERGROUND | PASS | 9/15/2023 | BING COSBY |
710 WALL BOARD | PASS | 9/15/2023 | BING COSBY |
615 INSULATION | PASS | 9/19/2023 | BING COSBY |
730 LATH | PASS | 9/19/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 9/26/2023 | BING COSBY |
605 INSULATION | PASS | 9/26/2023 | BING COSBY |
605 INSULATION | PASS | 9/27/2023 | BING COSBY |
705 WALL BOARD | PASS | 9/27/2023 | BING COSBY |
705 WALL BOARD | PASS | 9/29/2023 | BING COSBY |
710 WALL BOARD | PASS | 9/29/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 10/2/2023 | BING COSBY |
615 INSULATION | PASS | 10/2/2023 | BING COSBY |
305 FRAME (W/M,P&E) | | 10/4/2023 | |
425 PLUMB ROUGH | | 10/4/2023 | |
730 LATH | | 10/4/2023 | |
305 FRAME (W/M,P&E) | PASS | 10/11/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | NOT READY | 10/11/2023 | BING COSBY |
605 INSULATION | PASS | 10/11/2023 | BING COSBY |
615 INSULATION | PASS | 10/11/2023 | BING COSBY |
730 LATH | PASS | 10/11/2023 | BING COSBY |
705 WALL BOARD | PASS | 10/11/2023 | BING COSBY |
305 FRAME (W/M,P&E) | SAME DAY CANCEL | 10/13/2023 | DUSTIN STOTLER |
305 FRAME (W/M,P&E) | SAME DAY CANCEL | 10/13/2023 | DUSTIN STOTLER |
305 FRAME (W/M,P&E) | PASS | 10/18/2023 | BING COSBY |
425 PLUMB ROUGH | PASS | 10/18/2023 | BING COSBY |
605 INSULATION | PASS | 10/19/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 10/31/2023 | BING COSBY |
605 INSULATION | PASS | 10/31/2023 | BING COSBY |
735 LATH | PASS | 10/31/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 11/7/2023 | BING COSBY |
340 SHEAR & DIAPHRAGM | PASS | 11/7/2023 | BING COSBY |
425 PLUMB ROUGH | PASS | 11/7/2023 | BING COSBY |
425 PLUMB ROUGH | PASS | 11/8/2023 | BING COSBY |
705 WALL BOARD | PASS | 11/8/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | NOT READY | 11/8/2023 | BING COSBY |
730 LATH | PASS | 11/8/2023 | BING COSBY |
430 PLUMB MISC | PASS | 11/13/2023 | BING COSBY |
705 WALL BOARD | PASS | 11/13/2023 | BING COSBY |
710 WALL BOARD | PASS | 11/13/2023 | BING COSBY |
715 WALL BOARD | PASS | 11/13/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 11/17/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | PASS | 11/17/2023 | BING COSBY |
605 INSULATION | PASS | 11/17/2023 | BING COSBY |
705 WALL BOARD | PASS | 11/17/2023 | BING COSBY |
730 LATH | PASS | 11/17/2023 | BING COSBY |
735 LATH | PASS | 11/17/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 11/21/2023 | BING COSBY |
605 INSULATION | PASS | 11/21/2023 | BING COSBY |
605 INSULATION | PASS | 11/21/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 11/28/2023 | BING COSBY |
730 LATH | | | |
605 INSULATION | PASS | 12/7/2023 | BING COSBY |
705 WALL BOARD | PASS | 12/7/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 12/7/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 12/8/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 12/12/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 12/12/2023 | BING COSBY |
705 WALL BOARD | PASS | 12/12/2023 | BING COSBY |
425 PLUMB ROUGH | PASS | 12/12/2023 | BING COSBY |
605 INSULATION | PASS | 12/20/2023 | BING COSBY |
705 WALL BOARD | PASS | 12/20/2023 | BING COSBY |
305 FRAME (W/M,P&E) | SAME DAY CANCEL | 12/27/2023 | CHRIS BABCOCK |
305 FRAME (W/M,P&E) | NOT READY | 1/4/2024 | BING COSBY |
605 INSULATION | PASS | 1/17/2024 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 1/18/2024 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 1/18/2024 | BING COSBY |
605 INSULATION | PASS | 1/18/2024 | BING COSBY |
605 INSULATION | PASS | 1/19/2024 | BING COSBY |
305 FRAME (W/M,P&E) | SAME DAY CANCEL | 1/24/2024 | MICHAEL TROSTRUD |
310 FRAME (W/M.P.E) | SAME DAY CANCEL | 1/24/2024 | MICHAEL TROSTRUD |
605 INSULATION | PASS | 1/30/2024 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 1/31/2024 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 2/1/2024 | BING COSBY |
705 WALL BOARD | PASS | 2/6/2024 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 2/7/2024 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 2/8/2024 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 2/8/2024 | BING COSBY |
705 WALL BOARD | PASS | 2/13/2024 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 2/21/2024 | BING COSBY |
705 WALL BOARD | PASS | 2/21/2024 | BING COSBY |
305 FRAME (W/M,P&E) | NOT READY | 2/29/2024 | BING COSBY |
210 CMU REBAR | CORRECTIONS | 3/15/2024 | MICHAEL TROSTRUD |
550 METER RELEASE | PASS | 4/2/2024 | BING COSBY |
305 FRAME (W/M,P&E) | FAILED | 4/3/2024 | MICHAEL TROSTRUD |
550 METER RELEASE | PASS | 4/3/2024 | MICHAEL TROSTRUD |
305 FRAME (W/M,P&E) | PASS | 4/4/2024 | MARK WILLIAMS |
550 METER RELEASE | PASS | 4/4/2024 | MARK WILLIAMS |
710 WALL BOARD | PASS | 4/9/2024 | BING COSBY |
550 METER RELEASE | PASS | 4/11/2024 | BING COSBY |
550 METER RELEASE | PASS | 4/16/2024 | BING COSBY |
550 METER RELEASE | PASS | 4/16/2024 | BING COSBY |
550 METER RELEASE | PASS | 4/17/2024 | BING COSBY |
550 METER RELEASE | PASS | 4/17/2024 | BING COSBY |
550 METER RELEASE | PASS | 4/17/2024 | BING COSBY |
550 METER RELEASE | PASS | 4/23/2024 | BING COSBY |
550 METER RELEASE | PASS | 4/30/2024 | BING COSBY |
**915 FINAL COMMER | NOT READY | 4/30/2024 | BING COSBY |
550 METER RELEASE | PASS | 5/2/2024 | BING COSBY |
485 GAS TEST | NOT READY | 5/14/2024 | MARK WILLIAMS |
550 METER RELEASE | PASS | 5/14/2024 | MARK WILLIAMS |
715 WALL BOARD | PASS | 3/6/2023 | BING COSBY |
321 DIAPHRAGM FLOOR | PASS | 5/8/2023 | BING COSBY |
340 SHEAR & DIAPHRAGM | PASS | 5/15/2023 | BING COSBY |
430 PLUMB MISC | PASS | 5/15/2023 | BING COSBY |
705 WALL BOARD | PASS | 5/15/2023 | BING COSBY |
705 WALL BOARD | PASS | 5/18/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | PASS | 5/22/2023 | BING COSBY |
605 INSULATION | PASS | 5/25/2023 | BING COSBY |
705 WALL BOARD | PASS | 5/25/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | NOT READY | 5/30/2023 | BING COSBY |
605 INSULATION | PASS | 5/30/2023 | BING COSBY |
705 WALL BOARD | PASS | 5/30/2023 | BING COSBY |
605 INSULATION | PASS | 6/1/2023 | BING COSBY |
430 PLUMB MISC | | 6/5/2023 | |
322 DIAPHRAGM SHEAR | PASS | 6/5/2023 | BING COSBY |
321 DIAPHRAGM FLOOR | PASS | 6/5/2023 | BING COSBY |
340 SHEAR & DIAPHRAGM | PASS | 6/7/2023 | BING COSBY |
705 WALL BOARD | PASS | 6/7/2023 | BING COSBY |
605 INSULATION | PASS | 6/7/2023 | BING COSBY |
605 INSULATION | PASS | 6/8/2023 | MICHAEL TROSTRUD |
425 PLUMB ROUGH | FAILED | 6/19/2023 | MARK WILLIAMS |
495 PLB UNDERGROUND | NO ENTRY | 6/21/2023 | DUSTIN STOTLER |
605 INSULATION | PARTIAL | 6/22/2023 | MICHAEL TROSTRUD |
620 INSULATION | PASS | 6/28/2023 | BING COSBY |
305 FRAME (W/M,P&E) | NO INSPECTION | 6/30/2023 | DUSTIN STOTLER |
305 FRAME (W/M,P&E) | PASS | 7/7/2023 | BING COSBY |
50 PRECON | PASS | 7/7/2023 | BING COSBY |
605 INSULATION | PASS | 7/7/2023 | BING COSBY |
323 DIAPHRAGM ROOF | PASS | 7/10/2023 | BING COSBY |
323 DIAPHRAGM ROOF | PASS | 7/12/2023 | BING COSBY |
350 FRAMING | PASS | 7/12/2023 | BING COSBY |
50 PRECON | PASS | 7/12/2023 | BING COSBY |
605 INSULATION | PASS | 7/12/2023 | BING COSBY |
620 INSULATION | PASS | 7/13/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 7/17/2023 | BING COSBY |
410 PLB UNDERGROUND | NOT READY | 7/17/2023 | BING COSBY |
605 INSULATION | PASS | 7/17/2023 | BING COSBY |
710 WALL BOARD | PASS | 7/17/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 7/19/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | PASS | 7/21/2023 | BING COSBY |
410 PLB UNDERGROUND | PASS | 7/21/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 7/21/2023 | BING COSBY |
705 WALL BOARD | PASS | 7/24/2023 | BING COSBY |
105 FOOTINGS | PASS | 7/24/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 7/24/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 7/26/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 7/27/2023 | BING COSBY |
350 FRAMING | PASS | 7/27/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 7/31/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | PASS | 7/31/2023 | BING COSBY |
705 WALL BOARD | PASS | 8/2/2023 | BING COSBY |
705 WALL BOARD | PASS | 8/2/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 8/3/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | PASS | 8/7/2023 | BING COSBY |
305 FRAME (W/M,P&E) | | | |
50 PRECON | PASS | 8/10/2023 | BING COSBY |
715 WALL BOARD | PASS | 8/10/2023 | BING COSBY |
430 PLUMB MISC | | | |
730 LATH | | | |
425 PLUMB ROUGH | PASS | 8/18/2023 | BING COSBY |
605 INSULATION | PASS | 8/21/2023 | BING COSBY |
605 INSULATION | PASS | 8/23/2023 | BING COSBY |
605 INSULATION | PASS | 8/23/2023 | BING COSBY |
OTHER | PASS | 8/23/2023 | BING COSBY |
410 PLB UNDERGROUND | PASS | 8/24/2023 | BING COSBY |
705 WALL BOARD | PASS | 8/28/2023 | BING COSBY |
605 INSULATION | PASS | 8/28/2023 | BING COSBY |
PRECON | PASS | 8/28/2023 | BING COSBY |
730 LATH | PASS | 8/28/2023 | BING COSBY |
PRECON | PASS | 8/30/2023 | BING COSBY |
50 PRECON | PASS | 9/5/2023 | BING COSBY |
605 INSULATION | PASS | 9/5/2023 | BING COSBY |
705 WALL BOARD | PASS | 9/5/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 9/5/2023 | BING COSBY |
705 WALL BOARD | PASS | 9/7/2023 | DUSTIN STOTLER |
605 INSULATION | PASS | 9/11/2023 | BING COSBY |
730 LATH | PASS | 9/11/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | PASS | 9/14/2023 | BING COSBY |
605 INSULATION | PASS | 9/14/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 9/15/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 9/18/2023 | BING COSBY |
605 INSULATION | PASS | 9/18/2023 | BING COSBY |
605 INSULATION | PASS | 9/18/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | PASS | 9/20/2023 | BING COSBY |
705 WALL BOARD | PASS | 9/20/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | PASS | 9/21/2023 | BING COSBY |
430 PLUMB MISC | PASS | 9/25/2023 | BING COSBY |
605 INSULATION | PASS | 9/25/2023 | BING COSBY |
705 WALL BOARD | PASS | 9/25/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | PASS | 9/28/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 9/29/2023 | BING COSBY |
705 WALL BOARD | PASS | 9/29/2023 | BING COSBY |
705 WALL BOARD | PASS | 10/2/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | PASS | 10/5/2023 | BING COSBY |
430 PLUMB MISC | PASS | 10/5/2023 | BING COSBY |
705 WALL BOARD | PASS | 10/5/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | NO ENTRY | 10/9/2023 | BING COSBY |
430 PLUMB MISC | NO ENTRY | 10/9/2023 | BING COSBY |
605 INSULATION | NO ENTRY | 10/9/2023 | BING COSBY |
705 WALL BOARD | NO ENTRY | 10/9/2023 | BING COSBY |
730 LATH | NO ENTRY | 10/9/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 10/12/2023 | BING COSBY |
705 WALL BOARD | PASS | 10/12/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 10/16/2023 | BING COSBY |
605 INSULATION | PASS | 10/16/2023 | BING COSBY |
705 WALL BOARD | PASS | 10/16/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 10/19/2023 | BING COSBY |
485 GAS TEST | PASS | 10/19/2023 | BING COSBY |
305 FRAME (W/M,P&E) | NOT READY | 10/23/2023 | MICHAEL TROSTRUD |
605 INSULATION | PARTIAL | 10/23/2023 | MICHAEL TROSTRUD |
705 WALL BOARD | PASS | 10/23/2023 | MICHAEL TROSTRUD |
PRECON | NO INSPECTION | 10/23/2023 | MICHAEL TROSTRUD |
305 FRAME (W/M,P&E) | PASS | 10/26/2023 | BING COSBY |
50 PRECON | PASS | 10/26/2023 | BING COSBY |
605 INSULATION | PASS | 10/26/2023 | BING COSBY |
50 PRECON | PASS | 10/27/2023 | BING COSBY |
430 PLUMB MISC | PASS | 10/27/2023 | BING COSBY |
605 INSULATION | PASS | 10/27/2023 | BING COSBY |
705 WALL BOARD | PASS | 10/27/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 10/30/2023 | BING COSBY |
605 INSULATION | PASS | 10/30/2023 | BING COSBY |
50 PRECON | PASS | 11/2/2023 | BING COSBY |
605 INSULATION | PASS | 11/2/2023 | BING COSBY |
705 WALL BOARD | PASS | 11/2/2023 | BING COSBY |
605 INSULATION | PASS | 11/2/2023 | BING COSBY |
730 LATH | PASS | 11/2/2023 | BING COSBY |
605 INSULATION | PASS | 11/6/2023 | BING COSBY |
305 FRAME (W/M,P&E) | NOT READY | 11/6/2023 | BING COSBY |
605 INSULATION | PASS | 11/13/2023 | BING COSBY |
605 INSULATION | PASS | 12/4/2023 | BING COSBY |
705 WALL BOARD | PASS | 12/4/2023 | BING COSBY |
730 LATH | PASS | 12/4/2023 | BING COSBY |
50 PRECON | PASS | 12/7/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 12/8/2023 | BING COSBY |
410 PLB UNDERGROUND | NOT READY | 12/13/2023 | BING COSBY |
705 WALL BOARD | PASS | 12/13/2023 | BING COSBY |
430 PLUMB MISC | PASS | 12/14/2023 | BING COSBY |
605 INSULATION | PASS | 12/14/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 12/18/2023 | BING COSBY |
605 INSULATION | PASS | 1/2/2024 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 1/3/2024 | BING COSBY |
605 INSULATION | PASS | 1/4/2024 | BING COSBY |
605 INSULATION | PASS | 1/5/2024 | BING COSBY |
705 WALL BOARD | PASS | 1/5/2024 | BING COSBY |
605 INSULATION | PASS | 1/11/2024 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 1/16/2024 | BING COSBY |
705 WALL BOARD | PASS | 1/16/2024 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 1/19/2024 | BING COSBY |
705 WALL BOARD | PASS | 1/19/2024 | BING COSBY |
305 FRAME (W/M,P&E) | NOT READY | 1/22/2024 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 1/22/2024 | CHRIS BABCOCK |
620 INSULATION | SAME DAY CANCEL | 1/26/2024 | BING COSBY |
605 INSULATION | PASS | 1/29/2024 | BING COSBY |
705 WALL BOARD | PASS | 1/29/2024 | BING COSBY |
605 INSULATION | PASS | 2/2/2024 | BING COSBY |
605 INSULATION | PASS | 2/5/2024 | BING COSBY |
705 WALL BOARD | PASS | 2/7/2024 | BING COSBY |
605 INSULATION | PASS | 2/12/2024 | BING COSBY |
735 LATH | PASS | 2/12/2024 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 2/22/2024 | BING COSBY |
550 METER RELEASE | PASS | 2/26/2024 | BING COSBY |
605 INSULATION | PASS | 2/26/2024 | BING COSBY |
550 METER RELEASE | PASS | 2/28/2024 | BING COSBY |
550 METER RELEASE | PASS | 2/29/2024 | BING COSBY |
305 FRAME (W/M,P&E) | PARTIAL | 3/1/2024 | BING COSBY |
550 METER RELEASE | PASS | 3/1/2024 | BING COSBY |
705 WALL BOARD | PASS | 3/1/2024 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 3/4/2024 | BING COSBY |
705 WALL BOARD | PASS | 3/4/2024 | BING COSBY |
705 WALL BOARD | PASS | 3/11/2024 | BING COSBY |
705 WALL BOARD | PASS | 3/14/2024 | DUSTIN STOTLER |
210 CMU REBAR | NO ENTRY | 3/20/2024 | BING COSBY |
485 GAS TEST | PASS | 3/20/2024 | BING COSBY |
550 METER RELEASE | PASS | 4/8/2024 | BING COSBY |
550 METER RELEASE | NOT READY | 4/12/2024 | BING COSBY |
730 LATH | NO INSPECTION | 4/17/2024 | BING COSBY |
550 METER RELEASE | PASS | 4/18/2024 | BING COSBY |
550 METER RELEASE | PASS | 4/22/2024 | BING COSBY |
550 METER RELEASE | PASS | 4/24/2024 | BING COSBY |
550 METER RELEASE | SAME DAY CANCEL | 5/7/2024 | BING COSBY |
485 GAS TEST | PASS | 5/8/2024 | BING COSBY |
485 GAS TEST | PASS | 5/15/2024 | BING COSBY |
415 PLB UNDERGROUND | PASS | 6/6/2022 | BING COSBY |
705 WALL BOARD | PASS | 8/30/2022 | BING COSBY |
260 CONCRETE DECKS | NOT READY | 3/29/2022 | BING COSBY |
265 CONCRETE COLUMNS | NOT READY | 3/29/2022 | BING COSBY |
410 PLB UNDERGROUND | PASS | 4/1/2022 | BING COSBY |
250 CONCRETE SLAB | PASS | 4/6/2022 | BING COSBY |
220 CONCRETE PANELS | PASS | 4/20/2022 | MARK WILLIAMS |
410 PLB UNDERGROUND | PASS | 5/3/2022 | BING COSBY |
250 CONCRETE SLAB | PASS | 5/5/2022 | BING COSBY |
250 CONCRETE SLAB | PASS | 6/6/2022 | BING COSBY |
250 CONCRETE SLAB | PASS | 6/27/2022 | BING COSBY |
415 PLB UNDERGROUND | PASS | 6/29/2022 | BING COSBY |
265 CONCRETE COLUMNS | NOT READY | 7/8/2022 | BING COSBY |
415 PLB UNDERGROUND | PASS | 7/13/2022 | BING COSBY |
250 CONCRETE SLAB | PASS | 7/14/2022 | BING COSBY |
410 PLB UNDERGROUND | PASS | 8/9/2022 | BING COSBY |
715 WALL BOARD | PASS | 8/9/2022 | BING COSBY |
210 CMU REBAR | PASS | 8/19/2022 | BING COSBY |
210 CMU REBAR | PASS | 8/25/2022 | BING COSBY |
210 CMU REBAR | PASS | 8/31/2022 | BING COSBY |
415 PLB UNDERGROUND | PASS | 9/22/2022 | BING COSBY |
410 PLB UNDERGROUND | PARTIAL | 9/28/2022 | MICHAEL TROSTRUD |
315 FRAME | PASS | 10/20/2022 | BING COSBY |
715 WALL BOARD | PASS | 12/7/2022 | BING COSBY |
315 FRAME | PASS | 12/8/2022 | BING COSBY |
50 PRECON | PASS | 12/20/2021 | BING COSBY |
50 PRECON | PASS | 12/20/2021 | MARK WILLIAMS |
210 CMU REBAR | PASS | 4/22/2022 | MARK WILLIAMS |
210 CMU REBAR | PASS | 5/18/2022 | BING COSBY |
260 CONCRETE DECKS | PASS | 5/20/2022 | BING COSBY |
265 CONCRETE COLUMNS | PASS | 6/13/2022 | BING COSBY |
120 FOOTINGS | PASS W/CONDITIONS | 7/7/2022 | MARK WILLIAMS |
50 PRECON | PASS | 12/20/2021 | MICHAEL TROSTRUD |
120 FOOTINGS | NO INSPECTION | 1/27/2022 | BING COSBY |
410 PLB UNDERGROUND | PASS | 2/17/2022 | BING COSBY |
715 WALL BOARD | PASS | 9/7/2022 | BING COSBY |
265 CONCRETE COLUMNS | PASS | 7/7/2022 | BING COSBY |
415 PLB UNDERGROUND | PASS | 10/17/2022 | BING COSBY |
505 ELEC UNDERGROUND | PASS | 9/9/2022 | MARK WILLIAMS |
620 INSULATION | PASS | 4/27/2023 | BING COSBY |
715 WALL BOARD | PASS | 8/10/2022 | BING COSBY |
430 PLUMB MISC | PASS | 4/19/2023 | BING COSBY |
750 T BAR CEILING | | | |
490 GAS TEST | | | |
555 METER RELEASE | SAME DAY CANCEL | 4/25/2024 | BING COSBY |
900 FIRE FINAL | | | |
991 LANDSCAPING | | | |
992 STREET LIGHTING | | | |
993 ENGINEERING | | | |
996 WATER UTILITIES | | | |
997 PLANNING | | | |
250 CONCRETE SLAB | PASS | 7/12/2022 | BING COSBY |
**915 FINAL COMMER | | | |
455 MECHANICAL ROUGH | | | |
250 CONCRETE SLAB | PASS | 7/27/2022 | MARK WILLIAMS |
315 FRAME | PASS | 1/20/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | PASS | 1/20/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | PASS | 1/24/2023 | BING COSBY |
315 FRAME | PASS | 1/26/2023 | BING COSBY |
210 CMU REBAR | PASS | 2/2/2023 | BING COSBY |
495 PLB UNDERGROUND | PASS | 2/3/2023 | BING COSBY |
315 FRAME | NO ENTRY | 2/20/2023 | CHRIS BABCOCK |
322 DIAPHRAGM SHEAR | NO ENTRY | 2/20/2023 | CHRIS BABCOCK |
321 DIAPHRAGM FLOOR | PASS | 3/16/2023 | BING COSBY |
315 FRAME | PASS | 4/5/2023 | BING COSBY |
321 DIAPHRAGM FLOOR | PASS | 4/14/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | PASS | 5/9/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 5/16/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | PASS | 5/16/2023 | BING COSBY |
705 WALL BOARD | PASS | 5/16/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 5/17/2023 | BING COSBY |
715 WALL BOARD | PASS | 6/12/2023 | BING COSBY |
705 WALL BOARD | NO INSPECTION | 6/30/2023 | DUSTIN STOTLER |
322 DIAPHRAGM SHEAR | PASS | 6/30/2023 | DUSTIN STOTLER |
305 FRAME (W/M,P&E) | PASS | 7/18/2023 | BING COSBY |
620 INSULATION | PASS | 7/18/2023 | BING COSBY |
620 INSULATION | PASS | 7/25/2023 | BING COSBY |
425 PLUMB ROUGH | PASS | 7/26/2023 | BING COSBY |
340 SHEAR & DIAPHRAGM | PASS | 7/26/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | PASS | 8/1/2023 | BING COSBY |
620 INSULATION | PASS | 8/1/2023 | BING COSBY |
715 WALL BOARD | PASS | 8/1/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 8/3/2023 | BING COSBY |
605 INSULATION | PASS | 8/3/2023 | BING COSBY |
705 WALL BOARD | PASS | 8/3/2023 | BING COSBY |
705 WALL BOARD | PASS | 8/3/2023 | BING COSBY |
425 PLUMB ROUGH | PASS | 8/4/2023 | BING COSBY |
620 INSULATION | PASS | 8/4/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 8/8/2023 | BING COSBY |
620 INSULATION | PASS | 8/8/2023 | BING COSBY |
710 WALL BOARD | PASS | 8/8/2023 | BING COSBY |
620 INSULATION | PASS | 8/8/2023 | BING COSBY |
710 WALL BOARD | PASS | 9/12/2023 | BING COSBY |
710 WALL BOARD | PASS | 9/13/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | PASS | 10/3/2023 | BING COSBY |
620 INSULATION | PASS | 10/3/2023 | BING COSBY |
710 WALL BOARD | PASS | 10/3/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | PASS | 10/3/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | PASS | 10/17/2023 | BING COSBY |
425 PLUMB ROUGH | PASS | 10/17/2023 | BING COSBY |
310 FRAME (W/M.P.E) | PASS | 10/24/2023 | BING COSBY |
620 INSULATION | PASS | 10/24/2023 | BING COSBY |
425 PLUMB ROUGH | PASS | 11/9/2023 | BING COSBY |
730 LATH | PASS | 11/9/2023 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 11/14/2023 | BING COSBY |
715 WALL BOARD | PASS | 11/14/2023 | BING COSBY |
310 FRAME (W/M.P.E) | PASS | 11/14/2023 | BING COSBY |
322 DIAPHRAGM SHEAR | PASS | 11/15/2023 | BING COSBY |
715 WALL BOARD | PASS | 11/15/2023 | BING COSBY |
615 INSULATION | PASS | 11/16/2023 | BING COSBY |
705 WALL BOARD | PASS | 11/22/2023 | BING COSBY |
310 FRAME (W/M.P.E) | PASS | 11/22/2023 | BING COSBY |
310 FRAME (W/M.P.E) | PASS | 11/27/2023 | BING COSBY |
710 WALL BOARD | PASS | 12/5/2023 | BING COSBY |
425 PLUMB ROUGH | NOT READY | 12/13/2023 | BING COSBY |
705 WALL BOARD | PASS | 12/13/2023 | BING COSBY |
310 FRAME (W/M.P.E) | NOT READY | 12/26/2023 | CHRIS BABCOCK |
305 FRAME (W/M,P&E) | PASS | 1/9/2024 | BING COSBY |
715 WALL BOARD | PASS | 1/10/2024 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 1/11/2024 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 1/11/2024 | BING COSBY |
305 FRAME (W/M,P&E) | PASS | 1/25/2024 | BING COSBY |
310 FRAME (W/M.P.E) | PASS | 1/25/2024 | BING COSBY |
310 FRAME (W/M.P.E) | PASS | 2/27/2024 | BING COSBY |
550 METER RELEASE | PASS | 2/27/2024 | BING COSBY |
705 WALL BOARD | PASS | 2/27/2024 | BING COSBY |
485 GAS TEST | PASS | 3/19/2024 | BING COSBY |
|
|
Fees:
|
FIRE - LUMBER DROP | $206.00 | 1883564 | 04/26/2022 |
RESUBMITTAL | $289.00 | 2173383 | 07/31/2023 |
HOURLY PLAN REVIEW FEE | $213.79 | 1815603 | 01/12/2022 |
HOURLY PLAN REVIEW FEE | $213.79 | 1881052 | 04/21/2022 |
TEMP METER RELEASE PLAN REVIEW | $31.84 | 2311886 | 03/20/2024 |
TEMPORARY METER RELEASE INSPECTION | $267.69 | 2311886 | 03/20/2024 |
TEMP METER RELEASE PLAN REVIEW | $31.84 | 2328347 | 04/17/2024 |
TEMPORARY METER RELEASE INSPECTION | $267.69 | 2328347 | 04/17/2024 |
TEMP METER RELEASE PLAN REVIEW | $31.84 | 2344071 | 05/15/2024 |
TEMPORARY METER RELEASE INSPECTION | $267.69 | 2344071 | 05/15/2024 |
HOURLY PLAN REVIEW FEE | $213.79 | 1878711 | 04/18/2022 |
HOURLY PLAN REVIEW FEE | $213.79 | 2280929 | 01/29/2024 |
RESUBMITTAL | $251.00 | 1974995 | 09/12/2022 |
RESUBMITTAL | $222.00 | 1781835 | 11/22/2021 |
FIRE MID RISE PLAN CHECK | $4,441.85 | 1605809 | 03/10/2021 |
MID RISE PLAN CHECK | $22,209.26 | 1605809 | 03/10/2021 |
WTR PLAN CHECK MID RISE | $3,331.39 | 1605809 | 03/10/2021 |
PLN-REVIEW OF BUILDING PERMIT | $158.00 | 1605809 | 03/10/2021 |
COMMERCIAL SMIP | $22,064.00 | 1723301 | 08/26/2021 |
FIRE MID RISE INSPECT | $56,453.63 | 1723301 | 08/26/2021 |
GENERAL PLAN SURCHARGE | $28,226.81 | 1723301 | 08/26/2021 |
MID RISE PERMIT | $282,268.13 | 1723301 | 08/26/2021 |
PERMIT IMAGING SURCHARGE | $5.00 | 1723301 | 08/26/2021 |
PERMIT TECHNOLOGY SURCHARGE | $5,645.36 | 1723301 | 08/26/2021 |
PLAN CHECK TECHNOLOGY SURCHARGE | $444.19 | 1723301 | 08/26/2021 |
PLAN IMAGING SURCHARGE | $1,854.00 | 1723301 | 08/26/2021 |
SB 1473 GREEN TAX | $3,146.00 | 1723301 | 08/26/2021 |
PUBLIC FACILITY RESIDENTIAL | $809,889.00 | 1723301 | 08/26/2021 |
PARK - RESIDENTIAL ONLY | $1,369,179.00 | 1723301 | 08/26/2021 |
PUBLIC FACILITY NON-RESIDENTIAL | $4,890.64 | 1723301 | 08/26/2021 |
FIRE PARKING PLAN CK | $3,241.90 | 1723301 | 08/26/2021 |
FIRE PARKING STRUCTURE INSP | $8,936.27 | 1723301 | 08/26/2021 |
PARKING STRUCTURE PERMIT | $44,681.35 | 1723301 | 08/26/2021 |
PARKING STRUCTURE PLAN CHECK | $16,209.49 | 1723301 | 08/26/2021 |
WTR PLAN CHECK PARKING STRUCTURE | $2,431.42 | 1723301 | 08/26/2021 |
|
|
|
TOTAL FEES:
|
$2,692,428.44
|
TOTAL FEES PAID:
|
$2,692,428.44
|
TOTAL FEES DUE:
|
$0.00
|
|
|
|