Site Address:Â
|
355 N CLEVELAND ST OCEANSIDE
|
Site APN:Â
|
1471611100
|
Subdivision:Â
|
|
Site Block:Â
|
|
Site Lot:Â
|
|
Valuation:Â
|
$10,500,000.00
|
Site Tract:Â
|
|
Permit Status:Â
|
FINALED
|
|
Description of Work:
|
NORTH BEACH PROMENADE (52) UNIT (4) STORY RES APTS.
|
|
|
Contractor:
|
LEVEL 3 CONSTRUCTION INC
|
Address:
|
1230 KEYSTONE WAY VISTA CA 92081
|
Phone:
|
(760) 448-5456
|
|
Technical Information:
|
PLAN ID # | |
PERMIT # | |
BIN # | C-8 |
SPRINKLER | 1 |
REDEV AREA | |
HOT WATER CONSERVATION | |
FLOOD ZONE | X |
COASTAL ZONE | |
OCC GROUP | R, B |
TYPE CONST | VB |
USE CODE | C04 & 018 |
EXISTING BLDG SF | |
OCC LOAD | |
UNITS | 0 |
STATE CODE EDITION | 2013 |
BLDG SF | 80720 |
NO STORIES | 4 |
ELECTRIC RELEASED BY | |
NOTIFIED SDGE BY | |
DATE ELECTRIC RELEASED | 12:00:00 AM |
ELECTRIC RELEASE TYPE | |
TYPE OF BUILDING | |
GAS RELEASED BY | |
NOTIFIED SDGE BY | |
DATE GAS RELEASED | 12:00:00 AM |
GAS RELEASE TYPE | |
WDID # | |
|
|
|
Owner:
|
PELICAN L23 OCEANSIDE LLC
|
Address:
|
1300 QUAIL STREET, STE 100 NEWPORT BEACH CA 92626
|
Phone:
|
|
|
|
|
WORKERS COMPENSATION DECLARATION
|
WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES.
I hereby affirm under penalty of perjury one of the following declarations:
____ I have and will maintain a certificate of consent to self-insure for workers' compensation, issued by the Director of Industrial Relations as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued.
Policy No.
____ I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are:
Carrier: Policy Number: Expiration Date:
____ I certify that, in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that, if I should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those provisions.
|
LICENSED CONTRACTOR'S DECLARATION
|
I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and my license is in full force and effect.
License No:
Expiration Date:
Contractor:
Class:
|
|
|
Inspections:
|
410 PLB UNDERGROUND | PASS | 3/27/2018 | TOM LOPEZ |
50 PRECON | | | |
120 FOOTINGS | NOT READY | 4/6/2018 | TOM LOPEZ |
410 PLB UNDERGROUND | PASS | 3/7/2018 | TOM LOPEZ |
505 ELEC UNDERGROUND | PARTIAL | 5/25/2018 | TOM LOPEZ |
315 FRAME | NO INSPECTION | 4/19/2018 | TOM LOPEZ |
330 SHEAR & DIAPRAGM | | | |
425 PLUMB ROUGH | PASS | 9/25/2018 | MARK WILLIAMS |
455 MECH ROUGH | | | |
525 ELECT ROUGH | PASS | 10/2/2018 | MARK WILLIAMS |
620 INSULATION | | | |
321 DIAPRAGM FLOOR | PARTIAL | 8/29/2018 | TOM LOPEZ |
740 LATH | CORRECTIONS | 2/26/2019 | TOM LOPEZ |
715 WALL BOARD | PARTIAL | 10/29/2018 | MARK WILLIAMS |
490 GAS TEST | | | |
555 METER RELEASE | | | |
900 FIRE FINAL | PASS | 8/26/2019 | RON OWENS |
991 LANDSCAPING | PASS | 11/5/2019 | HARRY GROVE |
992 STREET LIGHTING | | | |
993 ENGINEERING | PASS | 11/5/2019 | KEITH PIRILLO |
995 FIRE | NOT READY | 6/17/2019 | DAVID PARSONS |
996 WATER UTILITIES | PASS | 11/1/2019 | JEFF PRICE |
997 PLANNING | PASS | 11/5/2019 | TOM LOPEZ |
**915 FINAL COMMER | PARTIAL | 6/17/2019 | TOM LOPEZ |
550 METER RELEASE | PASS | 9/27/2019 | MARK WILLIAMS |
322 DIAPRAGM SHEAR | PARTIAL | 10/16/2018 | TOM LOPEZ |
305 FRAME (W/M,P&E) | PASS | 10/29/2018 | MARK WILLIAMS |
715 WALL BOARD | PASS | 4/15/2019 | TOM LOPEZ |
305 FRAME (W/M,P&E) | PARTIAL | 4/15/2019 | TOM LOPEZ |
730 LATH | NOT READY | 4/15/2019 | TOM LOPEZ |
550 METER RELEASE | NOT READY | 5/23/2019 | TOM LOPEZ |
730 LATH | PARTIAL | 4/29/2019 | TOM LOPEZ |
615 INSULATION | PASS | 4/29/2019 | TOM LOPEZ |
315 FRAME | PASS | 4/29/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | PARTIAL | 3/29/2019 | TOM LOPEZ |
740 LATH | NOT READY | 4/1/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | | | |
323 DIAPRAGM ROOF | | | |
340 SHEAR & DIAPRAGM | PASS | 2/22/2019 | BING COSBY |
530 ELECT ROUGH | | | |
620 INSULATION | | | |
715 WALL BOARD | PASS | 2/28/2019 | MARK WILLIAMS |
715 WALL BOARD | PASS | 4/17/2019 | TOM LOPEZ |
715 WALL BOARD | NO INSPECTION | 10/30/2018 | MARK WILLIAMS |
740 LATH | PARTIAL | 2/28/2019 | MARK WILLIAMS |
120 FOOTINGS | PASS | 4/10/2018 | TOM LOPEZ |
220 CONCRETE PANELS | PASS | 4/26/2018 | TOM LOPEZ |
260 CONCRETE DECKS | PASS | 6/19/2018 | MARK WILLIAMS |
265 CONCRETE COLUMNS | PASS | 4/30/2018 | TOM LOPEZ |
220 CONCRETE PANELS | PASS | 5/10/2018 | TOM LOPEZ |
220 CONCRETE PANELS | PASS | 5/14/2018 | TOM LOPEZ |
265 CONCRETE COLUMNS | PASS | 5/14/2018 | TOM LOPEZ |
260 CONCRETE DECKS | PASS | 7/3/2018 | TOM LOPEZ |
710 WALL BOARD | PARTIAL | 8/8/2018 | TOM LOPEZ |
315 FRAME | PARTIAL | 8/8/2018 | TOM LOPEZ |
321 DIAPRAGM FLOOR | PARTIAL | 8/10/2018 | TOM LOPEZ |
710 WALL BOARD | PARTIAL | 8/13/2018 | TOM LOPEZ |
321 DIAPRAGM FLOOR | PARTIAL | 8/14/2018 | TOM LOPEZ |
321 DIAPRAGM FLOOR | PARTIAL | 8/16/2018 | TOM LOPEZ |
321 DIAPRAGM FLOOR | PARTIAL | 8/20/2018 | TOM LOPEZ |
321 DIAPRAGM FLOOR | PARTIAL | 8/21/2018 | TOM LOPEZ |
322 DIAPRAGM SHEAR | PARTIAL | 8/21/2018 | TOM LOPEZ |
322 DIAPRAGM SHEAR | PARTIAL | 8/24/2018 | TOM LOPEZ |
321 DIAPRAGM FLOOR | PARTIAL | 8/28/2018 | TOM LOPEZ |
322 DIAPRAGM SHEAR | PARTIAL | 8/27/2018 | TOM LOPEZ |
530 ELECT ROUGH | PARTIAL | 9/26/2018 | MARK WILLIAMS |
321 DIAPRAGM FLOOR | PARTIAL | 9/25/2018 | MARK WILLIAMS |
322 DIAPRAGM SHEAR | PARTIAL | 9/5/2018 | TOM LOPEZ |
321 DIAPRAGM FLOOR | PASS | 9/6/2018 | MARK WILLIAMS |
322 DIAPRAGM SHEAR | CORRECTIONS | 9/10/2018 | MARK WILLIAMS |
425 PLUMB ROUGH | NOT READY | 9/24/2018 | MARK WILLIAMS |
322 DIAPRAGM SHEAR | PASS | 9/19/2018 | MARK WILLIAMS |
322 DIAPRAGM SHEAR | PARTIAL | 9/11/2018 | MARK WILLIAMS |
322 DIAPRAGM SHEAR | PARTIAL | 9/4/2018 | TOM LOPEZ |
321 DIAPRAGM FLOOR | PARTIAL | 9/12/2018 | TOM LOPEZ |
322 DIAPRAGM SHEAR | PARTIAL | 9/12/2018 | TOM LOPEZ |
322 DIAPRAGM SHEAR | PARTIAL | 9/14/2018 | TOM LOPEZ |
321 DIAPRAGM FLOOR | | | |
322 DIAPRAGM SHEAR | PARTIAL | 9/17/2018 | TOM LOPEZ |
710 WALL BOARD | PARTIAL | 9/17/2018 | TOM LOPEZ |
322 DIAPRAGM SHEAR | PARTIAL | 9/18/2018 | TOM LOPEZ |
322 DIAPRAGM SHEAR | | | |
322 DIAPRAGM SHEAR | PARTIAL | 10/4/2018 | TOM LOPEZ |
322 DIAPRAGM SHEAR | PARTIAL | 10/8/2018 | TOM LOPEZ |
321 DIAPRAGM FLOOR | PARTIAL | 10/9/2018 | TOM LOPEZ |
322 DIAPRAGM SHEAR | PARTIAL | 10/12/2018 | TOM LOPEZ |
322 DIAPRAGM SHEAR | | | |
322 DIAPRAGM SHEAR | PARTIAL | 10/18/2018 | TOM LOPEZ |
322 DIAPRAGM SHEAR | | | |
322 DIAPRAGM SHEAR | PARTIAL | 10/22/2018 | TOM LOPEZ |
322 DIAPRAGM SHEAR | PARTIAL | 10/23/2018 | TOM LOPEZ |
322 DIAPRAGM SHEAR | PASS W/CONDITIONS | 10/24/2018 | TOM LOPEZ |
322 DIAPRAGM SHEAR | PARTIAL | 11/6/2018 | TOM LOPEZ |
322 DIAPRAGM SHEAR | PASS W/CONDITIONS | 11/8/2018 | TOM LOPEZ |
322 DIAPRAGM SHEAR | PASS | 11/7/2018 | TOM LOPEZ |
322 DIAPRAGM SHEAR | PARTIAL | 11/9/2018 | TOM LOPEZ |
322 DIAPRAGM SHEAR | PARTIAL | 11/13/2018 | TOM LOPEZ |
322 DIAPRAGM SHEAR | PARTIAL | 11/14/2018 | TOM LOPEZ |
620 INSULATION | PARTIAL | 11/14/2018 | TOM LOPEZ |
710 WALL BOARD | PARTIAL | 11/16/2018 | TOM LOPEZ |
322 DIAPRAGM SHEAR | PARTIAL | 11/19/2018 | TOM LOPEZ |
322 DIAPRAGM SHEAR | PARTIAL | 11/20/2018 | TOM LOPEZ |
323 DIAPRAGM ROOF | PARTIAL | 11/26/2018 | TOM LOPEZ |
322 DIAPRAGM SHEAR | PARTIAL | 11/27/2018 | TOM LOPEZ |
323 DIAPRAGM ROOF | PARTIAL | 11/28/2018 | TOM LOPEZ |
323 DIAPRAGM ROOF | PARTIAL | 12/3/2018 | MICHAEL TROSTRUD |
715 WALL BOARD | PASS | 4/11/2019 | MARK WILLIAMS |
322 DIAPRAGM SHEAR | PARTIAL | 12/12/2018 | TOM LOPEZ |
322 DIAPRAGM SHEAR | PARTIAL | 12/13/2018 | TOM LOPEZ |
315 FRAME | PARTIAL | 12/14/2018 | TOM LOPEZ |
322 DIAPRAGM SHEAR | PASS | 12/17/2018 | TOM LOPEZ |
322 DIAPRAGM SHEAR | PARTIAL | 12/18/2018 | TOM LOPEZ |
322 DIAPRAGM SHEAR | PASS | 12/21/2018 | TOM LOPEZ |
710 WALL BOARD | PARTIAL | 12/24/2018 | TOM LOPEZ |
322 DIAPRAGM SHEAR | PASS | 12/26/2018 | TOM LOPEZ |
322 DIAPRAGM SHEAR | PASS | 12/27/2018 | TOM LOPEZ |
322 DIAPRAGM SHEAR | | | |
323 DIAPRAGM ROOF | PARTIAL | 1/2/2019 | TOM LOPEZ |
323 DIAPRAGM ROOF | | | |
323 DIAPRAGM ROOF | PASS | 1/4/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | PARTIAL | 1/7/2019 | TOM LOPEZ |
425 PLUMB ROUGH | PASS | 1/7/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | PASS | 4/17/2019 | TOM LOPEZ |
322 DIAPRAGM SHEAR | PARTIAL | 1/8/2019 | TOM LOPEZ |
425 PLUMB ROUGH | PASS | 1/7/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | PASS | 1/8/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | PASS | 1/9/2019 | TOM LOPEZ |
322 DIAPRAGM SHEAR | PASS | 1/10/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | NOT READY | 1/10/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | CORRECTIONS | 1/15/2019 | TOM LOPEZ |
322 DIAPRAGM SHEAR | PASS | 1/14/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | NOT READY | 1/17/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | NOT READY | 1/16/2019 | TOM LOPEZ |
620 INSULATION | NOT READY | 1/17/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | CORRECTIONS | 1/18/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | PARTIAL | 1/22/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | PARTIAL | 1/23/2019 | TOM LOPEZ |
620 INSULATION | PARTIAL | 1/23/2019 | TOM LOPEZ |
425 PLUMB ROUGH | PASS | 1/22/2019 | TOM LOPEZ |
430 PLUMB MISC | PASS | 1/23/2019 | TOM LOPEZ |
430 PLUMB MISC | PASS | 1/24/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | | | |
620 INSULATION | | | |
310 FRAME (W/M.P.E) | PARTIAL | 1/28/2019 | TOM LOPEZ |
620 INSULATION | PARTIAL | 1/28/2019 | TOM LOPEZ |
710 WALL BOARD | PARTIAL | 1/28/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | | | |
620 INSULATION | PASS | 1/29/2019 | TOM LOPEZ |
730 LATH | NOT READY | 3/6/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | PASS | 1/31/2019 | TOM LOPEZ |
620 INSULATION | PARTIAL | 1/31/2019 | TOM LOPEZ |
710 WALL BOARD | PASS | 1/31/2019 | TOM LOPEZ |
425 PLUMB ROUGH | PASS | 1/29/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | | | |
322 DIAPRAGM SHEAR | PASS | 1/30/2019 | TOM LOPEZ |
425 PLUMB ROUGH | PASS | 1/30/2019 | TOM LOPEZ |
710 WALL BOARD | | | |
310 FRAME (W/M.P.E) | PARTIAL | 4/23/2019 | TOM LOPEZ |
620 INSULATION | | | |
710 WALL BOARD | PARTIAL | 2/1/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | PASS | 2/4/2019 | TOM LOPEZ |
620 INSULATION | NOT READY | 2/4/2019 | TOM LOPEZ |
710 WALL BOARD | NO INSPECTION | 2/4/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | PASS | 2/5/2019 | TOM LOPEZ |
620 INSULATION | | | |
425 PLUMB ROUGH | PASS | 2/5/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | PARTIAL | 2/6/2019 | TOM LOPEZ |
620 INSULATION | PARTIAL | 2/6/2019 | TOM LOPEZ |
710 WALL BOARD | PARTIAL | 2/6/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | CORRECTIONS | 2/8/2019 | TOM LOPEZ |
620 INSULATION | PARTIAL | 2/8/2019 | TOM LOPEZ |
710 WALL BOARD | PARTIAL | 2/8/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | PASS | 2/12/2019 | TOM LOPEZ |
620 INSULATION | | | |
710 WALL BOARD | PASS | 2/11/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | PASS W/CONDITIONS | 2/13/2019 | TOM LOPEZ |
620 INSULATION | | | |
710 WALL BOARD | | | |
310 FRAME (W/M.P.E) | PARTIAL | 2/14/2019 | TOM LOPEZ |
620 INSULATION | | | |
710 WALL BOARD | | | |
310 FRAME (W/M.P.E) | PARTIAL | 2/18/2019 | TOM LOPEZ |
620 INSULATION | | | |
310 FRAME (W/M.P.E) | PARTIAL | 2/19/2019 | TOM LOPEZ |
425 PLUMB ROUGH | PASS | 2/26/2019 | TOM LOPEZ |
620 INSULATION | PARTIAL | 2/25/2019 | TOM LOPEZ |
710 WALL BOARD | PARTIAL | 2/25/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | | | |
620 INSULATION | PARTIAL | 2/27/2019 | TOM LOPEZ |
710 WALL BOARD | PARTIAL | 2/27/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | CORRECTIONS | 3/5/2019 | TOM LOPEZ |
425 PLUMB ROUGH | PASS | 3/5/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | PASS | 3/4/2019 | TOM LOPEZ |
730 LATH | CORRECTIONS | 3/4/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | CORRECTIONS | 3/6/2019 | TOM LOPEZ |
620 INSULATION | | | |
710 WALL BOARD | PASS | 4/19/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | PASS | 3/8/2019 | TOM LOPEZ |
730 LATH | NOT READY | 3/8/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | PARTIAL | 3/11/2019 | TOM LOPEZ |
620 INSULATION | PARTIAL | 3/11/2019 | TOM LOPEZ |
710 WALL BOARD | PARTIAL | 3/11/2019 | TOM LOPEZ |
730 LATH | PARTIAL | 3/11/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | PARTIAL | 3/12/2019 | TOM LOPEZ |
710 WALL BOARD | PARTIAL | 3/12/2019 | TOM LOPEZ |
730 LATH | PARTIAL | 3/12/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | | | |
620 INSULATION | | | |
710 WALL BOARD | | | |
730 LATH | PASS | 4/24/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | | | |
710 WALL BOARD | | | |
730 LATH | PARTIAL | 4/16/2019 | TOM LOPEZ |
315 FRAME | CORRECTIONS | 3/14/2019 | TOM LOPEZ |
425 PLUMB ROUGH | CORRECTIONS | 3/14/2019 | TOM LOPEZ |
525 ELECT ROUGH | CORRECTIONS | 3/14/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | PARTIAL | 3/20/2019 | TOM LOPEZ |
710 WALL BOARD | PASS | 3/20/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | PASS | 3/18/2019 | TOM LOPEZ |
315 FRAME | PASS | 3/18/2019 | TOM LOPEZ |
735 LATH | PASS | 3/20/2019 | TOM LOPEZ |
525 ELECT ROUGH | PASS | 3/18/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | NOT READY | 3/22/2019 | TOM LOPEZ |
315 FRAME | PASS | 3/21/2019 | TOM LOPEZ |
425 PLUMB ROUGH | | | |
525 ELECT ROUGH | | | |
310 FRAME (W/M.P.E) | | | |
310 FRAME (W/M.P.E) | PASS | 3/25/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | PASS | 3/26/2019 | TOM LOPEZ |
315 FRAME | PARTIAL | 3/26/2019 | TOM LOPEZ |
525 ELECT ROUGH | | | |
310 FRAME (W/M.P.E) | PARTIAL | 3/28/2019 | TOM LOPEZ |
315 FRAME | | | |
620 INSULATION | PASS | 4/1/2019 | TOM LOPEZ |
710 WALL BOARD | PASS | 4/1/2019 | TOM LOPEZ |
315 FRAME | CORRECTIONS | 4/3/2019 | TOM LOPEZ |
730 LATH | PASS | 4/4/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | | | |
620 INSULATION | PASS | 4/4/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | PASS | 4/5/2019 | TOM LOPEZ |
620 INSULATION | PASS | 4/8/2019 | TOM LOPEZ |
315 FRAME | | | |
315 FRAME | PARTIAL | 4/18/2019 | TOM LOPEZ |
710 WALL BOARD | PARTIAL | 4/18/2019 | TOM LOPEZ |
730 LATH | PARTIAL | 4/18/2019 | TOM LOPEZ |
315 FRAME | PASS | 4/22/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | PASS | 4/25/2019 | TOM LOPEZ |
710 WALL BOARD | PASS | 4/25/2019 | TOM LOPEZ |
730 LATH | PASS | 4/25/2019 | TOM LOPEZ |
525 ELECT ROUGH | PASS | 4/29/2019 | TOM LOPEZ |
710 WALL BOARD | PASS | 4/30/2019 | TOM LOPEZ |
730 LATH | PARTIAL | 4/30/2019 | TOM LOPEZ |
710 WALL BOARD | | | |
730 LATH | | | |
315 FRAME | PASS | 5/7/2019 | TOM LOPEZ |
310 FRAME (W/M.P.E) | PARTIAL | 5/7/2019 | TOM LOPEZ |
730 LATH | | | |
730 LATH | PARTIAL | 5/8/2019 | TOM LOPEZ |
315 FRAME | PARTIAL | 5/8/2019 | TOM LOPEZ |
525 ELECT ROUGH | PARTIAL | 5/8/2019 | TOM LOPEZ |
315 FRAME | PASS | 5/14/2019 | TOM LOPEZ |
710 WALL BOARD | PASS W/CONDITIONS | 5/13/2019 | TOM LOPEZ |
730 LATH | | | |
425 PLUMB ROUGH | PASS | 5/14/2019 | TOM LOPEZ |
455 MECHANICAL ROUGH | PASS | 5/14/2019 | TOM LOPEZ |
530 ELECT ROUGH | PASS | 5/14/2019 | TOM LOPEZ |
710 WALL BOARD | PASS | 5/17/2019 | TOM LOPEZ |
730 LATH | PARTIAL | 5/20/2019 | TOM LOPEZ |
730 LATH | | | |
310 FRAME (W/M.P.E) | PASS | 5/28/2019 | TOM LOPEZ |
550 METER RELEASE | PASS | 6/5/2019 | TOM LOPEZ |
315 FRAME | PARTIAL | 6/6/2019 | TOM LOPEZ |
550 METER RELEASE | PARTIAL | 6/6/2019 | TOM LOPEZ |
550 METER RELEASE | PASS | 6/10/2019 | TOM LOPEZ |
550 METER RELEASE | PASS | 8/15/2019 | TOM LOPEZ |
715 WALL BOARD | PASS | 6/21/2019 | TOM LOPEZ |
115 FOOTINGS | PASS | 6/24/2019 | TOM LOPEZ |
710 WALL BOARD | PASS | 7/1/2019 | TOM LOPEZ |
**915 FINAL COMMER | PARTIAL | 7/9/2019 | TOM LOPEZ |
485 GAS TEST | PASS | 7/11/2019 | TOM LOPEZ |
110 FOOTINGS | NOT READY | 7/15/2019 | TOM LOPEZ |
**915 FINAL COMMER | PARTIAL | 8/19/2019 | TOM LOPEZ |
**915 FINAL COMMER | NO INSPECTION | 8/5/2019 | TOM LOPEZ |
**915 FINAL COMMER | PARTIAL | 8/27/2019 | TOM LOPEZ |
**915 FINAL COMMER | PASS W/CONDITIONS | 9/10/2019 | TOM LOPEZ |
**915 FINAL COMMER | | | |
**915 FINAL COMMER | | | |
**915 FINAL COMMER | | | |
**915 FINAL COMMER | PASS W/CONDITIONS | 11/22/2019 | TOM LOPEZ |
410 PLB UNDERGROUND | PASS | 3/9/2018 | TOM LOPEZ |
410 PLB UNDERGROUND | PASS | 3/15/2018 | TOM LOPEZ |
410 PLB UNDERGROUND | PASS | 4/3/2018 | MARK WILLIAMS |
120 FOOTINGS | PASS | 4/9/2018 | TOM LOPEZ |
220 CONCRETE PANELS | PASS | 4/25/2018 | TOM LOPEZ |
220 CONCRETE PANELS | NO INSPECTION | 5/7/2018 | TOM LOPEZ |
265 CONCRETE COLUMNS | PASS | 5/10/2018 | TOM LOPEZ |
410 PLB UNDERGROUND | PASS | 5/23/2018 | TOM LOPEZ |
410 PLB UNDERGROUND | PARTIAL | 5/24/2018 | TOM LOPEZ |
250 CONCRETE SLAB | PASS | 6/4/2018 | DAVID GANS |
260 CONCRETE DECKS | PARTIAL | 6/18/2018 | MARK WILLIAMS |
260 CONCRETE DECKS | PARTIAL | 7/2/2018 | TOM LOPEZ |
120 FOOTINGS | PASS | 7/11/2018 | TOM LOPEZ |
315 FRAME | PASS | 8/7/2018 | TOM LOPEZ |
315 FRAME | PARTIAL | 9/20/2018 | MARK WILLIAMS |
605 INSULATION | PASS | 9/27/2018 | MARK WILLIAMS |
425 PLUMB ROUGH | PARTIAL | 9/27/2018 | MARK WILLIAMS |
425 PLUMB ROUGH | PARTIAL | 9/28/2018 | MARK WILLIAMS |
315 FRAME | PARTIAL | 10/25/2018 | MARK WILLIAMS |
620 INSULATION | PASS | 10/26/2018 | MARK WILLIAMS |
315 FRAME | NO INSPECTION | 10/31/2018 | MARK WILLIAMS |
620 INSULATION | PASS | 11/5/2018 | MARK WILLIAMS |
525 ELECT ROUGH | | | |
705 WALL BOARD | PARTIAL | 4/22/2019 | TOM LOPEZ |
730 LATH | CORRECTIONS | 4/22/2019 | TOM LOPEZ |
730 LATH | CORRECTIONS | 4/23/2019 | TOM LOPEZ |
730 LATH | PARTIAL | 5/1/2019 | TOM LOPEZ |
735 LATH | | | |
705 WALL BOARD | PASS | 5/20/2019 | TOM LOPEZ |
430 PLUMB MISC | | | |
550 METER RELEASE | NOT READY | 7/15/2019 | TOM LOPEZ |
550 METER RELEASE | PASS | 7/18/2019 | MARK WILLIAMS |
**915 FINAL COMMER | PARTIAL | 7/23/2019 | TOM LOPEZ |
550 METER RELEASE | PASS | 8/12/2019 | TOM LOPEZ |
**915 FINAL COMMER | PARTIAL | 9/5/2019 | TOM LOPEZ |
OCCUPANCY 0 | NO INSPECTION | 9/6/2019 | TOM LOPEZ |
455 MECHANICAL ROUGH | CORRECTIONS | 10/2/2019 | TOM LOPEZ |
**915 FINAL COMMER | PARTIAL | 10/24/2019 | TOM LOPEZ |
525 ELECT ROUGH | | | |
|
|
Fees:
|
ENG- FEMA ELEVATION CERTIFCATE | $255.00 | 714660 | 02/09/2018 |
PLANS IMAGING SURCHARGE | $768.00 | 718060 | 02/14/2018 |
HOURLY PLAN REVIEW FEE | $641.37 | 923055 | 10/03/2018 |
TEMP CERT OF OCCUPANCY | $399.85 | 1195049 | 08/23/2019 |
TEMP CERT OF OCCUPANCY | $31.84 | 1195049 | 08/23/2019 |
HOURLY PLAN REVIEW FEE | $427.58 | 1265347 | 11/20/2019 |
PLAN IMAGING SURCHARGE | $90.00 | 1265347 | 11/20/2019 |
TEMP CERT OF OCC INSP-EA ADD 30 DAYS | $223.63 | 1230245 | 10/07/2019 |
TEMP CERT OF OCC-EA ADD 30 DAYS PLAN CHK | $31.84 | 1230245 | 10/07/2019 |
TEMP CERT OF OCC INSP-EA ADD 30 DAYS | $223.63 | 1249178 | 10/31/2019 |
TEMP CERT OF OCC-EA ADD 30 DAYS PLAN CHK | $31.84 | 1249178 | 10/31/2019 |
FIRE- PLAN CHECK RESUBMITTAL | $222.00 | 851277 | 07/13/2018 |
FIRE- PLAN CHECK RESUBMITTAL | $222.00 | 851277 | 07/13/2018 |
PLN-REVIEW OF BUILDING PERMIT | $158.00 | 491788 | 12/16/2016 |
MID RISE PLAN CHECK | $12,925.70 | 491788 | 12/16/2016 |
FIRE MID RISE PLAN CHECK | $2,585.14 | 491788 | 12/16/2016 |
FIRE MID RISE INSPECT | $21,977.12 | 491788 | 12/16/2016 |
HOURLY PLAN REVIEW FEE | $213.79 | 576789 | 09/05/2017 |
HOURLY PLAN REVIEW FEE | $213.79 | 851277 | 07/13/2018 |
PUBLIC FACILITY NON-RESIDENTIAL | $7,530.80 | 714660 | 02/09/2018 |
PUBLIC FACILITY RESIDENTIAL | $136,292.00 | 714660 | 02/09/2018 |
PARK - RESIDENTIAL ONLY | $230,412.00 | 714660 | 02/09/2018 |
MID RISE PERMIT | $109,885.58 | 714660 | 02/09/2018 |
PERMIT IMAGING SURCHARGE | $5.00 | 714660 | 02/09/2018 |
GENERAL PLAN SURCHARGE | $10,988.56 | 714660 | 02/09/2018 |
PLAN CHECK TECHNOLOGY SURCHARGE | $258.51 | 714660 | 02/09/2018 |
PERMIT TECHNOLOGY SURCHARGE | $2,197.71 | 714660 | 02/09/2018 |
COMMERCIAL SMIP | $2,968.00 | 714660 | 02/09/2018 |
SB 1473 GREEN TAX | $420.00 | 714660 | 02/09/2018 |
BLD-CERTIFICATE OF OCCUPANCY | $40.00 | 1267199 | 11/22/2019 |
|
|
|
TOTAL FEES:
|
$542,640.28
|
TOTAL FEES PAID:
|
$542,640.28
|
TOTAL FEES DUE:
|
$0.00
|
|
|
|