Site Address:
|
3306 SENIOR CENTER DRIVE OCEANSIDE, CA 92056
|
Site APN:
|
1620825100
|
Subdivision:
|
|
Site Block:
|
|
Site Lot:
|
|
Valuation:
|
$18,600,000.00
|
Site Tract:
|
|
Permit Status:
|
FINALED
|
|
Description of Work:
|
EL CORAZON AQUATICS CENTER - CONSTRUCTION OF 15,000 SF BLDG
|
|
|
Contractor:
|
|
Address:
|
|
Phone:
|
|
|
Technical Information:
|
PLAN ID # | |
PERMIT # | |
BIN # | Q-8 |
FIRE SPRINKLER | 1 |
FLOOD ZONE | X AE |
REDEV AREA | |
COASTAL ZONE | |
OCC GROUP | |
SAND OIL INTRCPTR | |
TYPE CONST | VB |
OCC LOAD | |
UNITS | 0 |
EXISTING BLDG SF | |
STATE CODE EDITION | 2016 |
GREASE INTRCPTR | |
BLDG SF | 15000 |
NO STORIES | 0 |
ELECTRIC RELEASED BY | |
NOTIFIED SDGE BY | |
DATE ELECTRIC RELEASED | 12:00:00 AM |
ELECTRIC RELEASE TYPE | |
TYPE OF BUILDING | |
GAS RELEASED BY | |
NOTIFIED SDGE BY | |
DATE GAS RELEASED | 12:00:00 AM |
GAS RELEASE TYPE | |
WDID # | |
|
|
|
Owner:
|
CITY OF OCEANSIDE
|
Address:
|
300 N COAST HWY OCEANSIDE CA 92054
|
Phone:
|
|
|
|
|
WORKERS COMPENSATION DECLARATION
|
WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES.
I hereby affirm under penalty of perjury one of the following declarations:
____ I have and will maintain a certificate of consent to self-insure for workers' compensation, issued by the Director of Industrial Relations as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued.
Policy No.
____ I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are:
Carrier: Policy Number: Expiration Date:
____ I certify that, in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that, if I should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those provisions.
|
LICENSED CONTRACTOR'S DECLARATION
|
I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and my license is in full force and effect.
License No:
Expiration Date:
Contractor:
Class:
|
|
|
Inspections:
|
525 ELECT ROUGH | PASS | 1/6/2021 | MARC PROSI |
210 CMU REBAR | NOT READY | 8/18/2020 | MARC PROSI |
620 INSULATION | PASS | 9/11/2020 | MARC PROSI |
210 CMU REBAR | NOT READY | | MARC PROSI |
505 ELEC UNDERGROUND | NOT READY | 5/7/2020 | MARC PROSI |
210 CMU REBAR | FAILED | 5/26/2020 | MARC PROSI |
415 PLB UNDERGROUND | FAILED | 5/26/2020 | MARC PROSI |
505 ELEC UNDERGROUND | NOT READY | 5/26/2020 | MARC PROSI |
210 CMU REBAR | NOT READY | 5/28/2020 | MARC PROSI |
250 CONCRETE SLAB | NOT READY | 5/28/2020 | MARC PROSI |
310 FRAME (W/M.P.E) | NOT READY | 5/28/2020 | MARC PROSI |
250 CONCRETE SLAB | PASS | 5/29/2020 | MARC PROSI |
820 POOL PLUMBING | PASS | 7/8/2020 | MARC PROSI |
305 FRAME (W/M,P | PARTIAL | 7/23/2020 | MARC PROSI |
525 ELECT ROUGH | PARTIAL | 9/9/2020 | MARC PROSI |
735 LATH | PASS | 9/24/2020 | MARC PROSI |
250 CONCRETE SLAB | PASS | 9/25/2020 | MARC PROSI |
826 STEEL BONDING | PASS | 9/30/2020 | MARC PROSI |
210 CMU REBAR | PASS | 10/7/2020 | MARC PROSI |
210 CMU REBAR | PASS | 11/17/2020 | MARC PROSI |
415 PLB UNDERGROUND | PASS | 12/2/2020 | MARC PROSI |
826 STEEL BONDING | PARTIAL | 12/10/2020 | MARC PROSI |
505 ELEC UNDERGROUND | NO INSPECTION | 12/29/2020 | MARC PROSI |
828 PREPLASTER | PARTIAL | 1/19/2021 | MARC PROSI |
260 CONCRETE DECKS | FAILED | 1/19/2021 | MARC PROSI |
828 PREPLASTER | PASS | 1/20/2021 | MARC PROSI |
**915 FINAL COMMER | PARTIAL | 3/2/2021 | MARC PROSI |
**915 FINAL COMMER | PASS | 6/8/2021 | MARC PROSI |
820 POOL PLUMBING | PASS | 4/27/2020 | MARC PROSI |
120 FOOTINGS | FAILED | 4/27/2020 | MARC PROSI |
824 POOL STEEL | PASS | 5/11/2020 | MARC PROSI |
210 CMU REBAR | PASS | 5/11/2020 | MARC PROSI |
120 FOOTINGS | NOT READY | 6/18/2020 | MARC PROSI |
210 CMU REBAR | NOT READY | 6/18/2020 | MARC PROSI |
305 FRAME (W/M,P | NOT READY | 6/18/2020 | MARC PROSI |
322 DIAPRAGM SHEAR | PASS | 7/1/2020 | MARC PROSI |
425 PLUMB ROUGH | PASS | 7/1/2020 | MARC PROSI |
210 CMU REBAR | PASS | 7/1/2020 | MARC PROSI |
210 CMU REBAR | PASS | 7/20/2020 | MARC PROSI |
340 SHEAR | PARTIAL | 7/29/2020 | MARC PROSI |
730 LATH | PASS | 8/12/2020 | MARC PROSI |
305 FRAME (W/M,P | NOT READY | 8/17/2020 | MARC PROSI |
826 STEEL BONDING | PASS | 8/17/2020 | MARC PROSI |
315 FRAME | PASS | 8/28/2020 | MARC PROSI |
525 ELECT ROUGH | PASS | 9/10/2020 | MARC PROSI |
525 ELECT ROUGH | PARTIAL | 10/12/2020 | MARC PROSI |
505 ELEC UNDERGROUND | PASS | 10/12/2020 | MARC PROSI |
750 T BAR CEILING | NOT READY | 11/6/2020 | MARC PROSI |
525 ELECT ROUGH | PARTIAL | 11/13/2020 | MARC PROSI |
826 STEEL BONDING | PARTIAL | 11/13/2020 | MARC PROSI |
120 FOOTINGS | NOT READY | 12/30/2020 | MARC PROSI |
525 ELECT ROUGH | NOT READY | 12/30/2020 | MARC PROSI |
525 ELECT ROUGH | | 1/4/2021 | |
210 CMU REBAR | PASS | 8/31/2020 | MARC PROSI |
525 ELECT ROUGH | NOT READY | 8/31/2020 | MARC PROSI |
315 FRAME | NOT READY | 8/31/2020 | MARC PROSI |
505 ELEC UNDERGROUND | PARTIAL | 3/4/2020 | MARC PROSI |
120 FOOTINGS | NOT READY | 3/4/2020 | MARC PROSI |
996 WATER UTILITIES | PASS | 3/3/2021 | JEFF PRICE |
993 ENGINEERING | PASS | 4/27/2020 | WILLIAM DEILE |
750 T BAR CEILING | PASS | 11/9/2020 | MARC PROSI |
**915 FINAL COMMER | PARTIAL | 2/2/2021 | MARC PROSI |
530 ELECT ROUGH | PARTIAL | 2/3/2021 | MARC PROSI |
**915 FINAL COMMER | PARTIAL | 2/4/2021 | MARC PROSI |
525 ELECT ROUGH | PASS | 7/15/2020 | MARK WILLIAMS |
620 INSULATION | PASS | 7/15/2020 | MARK WILLIAMS |
265 CONCRETE COLUMNS | PASS | 7/15/2020 | MARK WILLIAMS |
50 PRECON | PASS | 3/24/2020 | MARC PROSI |
120 FOOTINGS | NOT READY | 4/23/2020 | MARC PROSI |
410 PLB UNDERGROUND | PASS | 3/6/2020 | MARC PROSI |
505 ELEC UNDERGROUND | PARTIAL | 3/31/2020 | MARC PROSI |
315 FRAME | PASS | 6/22/2020 | MARC PROSI |
330 SHEAR & DIAPRAGM | PASS | 6/8/2021 | MARC PROSI |
425 PLUMB ROUGH | NOT READY | 3/17/2020 | MARC PROSI |
455 MECH ROUGH | PARTIAL | 7/28/2020 | MARC PROSI |
525 ELECT ROUGH | NO INSPECTION | 4/6/2020 | TOM LOPEZ |
620 INSULATION | NO INSPECTION | 3/20/2020 | MARC PROSI |
120 FOOTINGS | PASS | 10/8/2020 | MARC PROSI |
730 LATH | NOT READY | 7/31/2020 | MARC PROSI |
530 ELECT ROUGH | PASS | 6/12/2020 | MARC PROSI |
490 GAS TEST | PASS | 6/16/2020 | MARC PROSI |
555 METER RELEASE | PASS | 10/22/2020 | MARC PROSI |
900 FIRE FINAL | PASS | 1/5/2021 | RON OWENS |
991 LANDSCAPING | | | |
992 STREET LIGHTING | | | |
993 ENGINEERING | | | |
995 FIRE | CONDITIONAL | 1/22/2020 | DAVID PARSONS |
996 WATER UTILITIES | | | |
997 PLANNING | | | |
**915 FINAL COMMER | CORRECTIONS | 2/1/2021 | MARC PROSI |
415 PLB UNDERGROUND | NO INSPECTION | 3/11/2020 | MARC PROSI |
485 GAS TEST | NO INSPECTION | 3/11/2020 | MARC PROSI |
415 PLB UNDERGROUND | PARTIAL | 4/1/2020 | MARC PROSI |
525 ELECT ROUGH | PARTIAL | 4/14/2020 | MARC PROSI |
525 ELECT ROUGH | PARTIAL | 4/16/2020 | MARC PROSI |
210 CMU REBAR | PARTIAL | 4/24/2020 | MARC PROSI |
425 PLUMB ROUGH | PASS | 4/29/2020 | MARC PROSI |
210 CMU REBAR | PASS | 4/30/2020 | MARC PROSI |
110 FOOTINGS | NOT READY | 5/1/2020 | MARC PROSI |
210 CMU REBAR | NO INSPECTION | 5/1/2020 | MARC PROSI |
120 FOOTINGS | PASS | 5/4/2020 | TOM LOPEZ |
210 CMU REBAR | PASS | 5/4/2020 | TOM LOPEZ |
120 FOOTINGS | PASS | 5/12/2020 | MARC PROSI |
210 CMU REBAR | NO INSPECTION | 5/12/2020 | MARC PROSI |
120 FOOTINGS | PASS | 5/14/2020 | MARC PROSI |
826 STEEL BONDING | PASS | 5/18/2020 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | PASS | 5/18/2020 | CHRIS BABCOCK |
210 CMU REBAR | PASS | 5/15/2020 | MARC PROSI |
505 ELEC UNDERGROUND | PARTIAL | 5/20/2020 | MARC PROSI |
210 CMU REBAR | PASS | 5/22/2020 | MARC PROSI |
425 PLUMB ROUGH | PASS | 5/22/2020 | MARC PROSI |
525 ELECT ROUGH | PASS | 5/22/2020 | MARC PROSI |
250 CONCRETE SLAB | NOT READY | 5/27/2020 | MARC PROSI |
525 ELECT ROUGH | PASS | 6/1/2020 | BING COSBY |
210 CMU REBAR | PASS | 6/1/2020 | BING COSBY |
265 CONCRETE COLUMNS | PASS | 6/4/2020 | MARC PROSI |
120 FOOTINGS | PARTIAL | 6/11/2020 | MARC PROSI |
210 CMU REBAR | PASS | 6/19/2020 | MARC PROSI |
210 CMU REBAR | PASS | 6/24/2020 | MARC PROSI |
210 CMU REBAR | PASS | 6/25/2020 | MARC PROSI |
210 CMU REBAR | PASS | 7/7/2020 | MARC PROSI |
260 CONCRETE DECKS | NOT READY | 7/7/2020 | MARC PROSI |
340 SHEAR | PARTIAL | 7/7/2020 | MARC PROSI |
505 ELEC UNDERGROUND | PASS | 7/13/2020 | MARK WILLIAMS |
730 LATH | PASS | 7/13/2020 | MARK WILLIAMS |
505 ELEC UNDERGROUND | PASS | 7/15/2020 | MARK WILLIAMS |
210 CMU REBAR | PASS | 7/27/2020 | MARK WILLIAMS |
250 CONCRETE SLAB | PASS | 7/27/2020 | MARK WILLIAMS |
350 FRAMING | PASS | 7/27/2020 | MARK WILLIAMS |
824 POOL STEEL | PARTIAL | 7/30/2020 | MARC PROSI |
455 MECHANICAL ROUGH | PARTIAL | 7/31/2020 | MARC PROSI |
430 PLUMB MISC | PASS | 8/5/2020 | MARC PROSI |
340 SHEAR | PASS | 8/5/2020 | MARC PROSI |
455 MECHANICAL ROUGH | PASS | 8/5/2020 | MARC PROSI |
210 CMU REBAR | PASS | 8/5/2020 | MARC PROSI |
525 ELECT ROUGH | PASS | 8/5/2020 | MARC PROSI |
620 INSULATION | PASS | 8/6/2020 | MARC PROSI |
505 ELEC UNDERGROUND | PASS | 8/10/2020 | MARK WILLIAMS |
605 INSULATION | PASS | 8/10/2020 | MARK WILLIAMS |
525 ELECT ROUGH | PASS | 8/10/2020 | MARK WILLIAMS |
620 INSULATION | NOT READY | 8/11/2020 | MARC PROSI |
485 GAS TEST | PASS | 8/13/2020 | MARC PROSI |
705 WALL BOARD | PASS | 8/13/2020 | MARC PROSI |
620 INSULATION | PASS | 8/14/2020 | MARC PROSI |
210 CMU REBAR | PASS | 8/19/2020 | MARC PROSI |
730 LATH | PARTIAL | 8/21/2020 | MARC PROSI |
425 PLUMB ROUGH | PASS | 8/25/2020 | MARC PROSI |
315 FRAME | NOT READY | 8/27/2020 | MARC PROSI |
455 MECHANICAL ROUGH | PASS | 8/27/2020 | MARC PROSI |
620 INSULATION | PASS | 8/27/2020 | MARC PROSI |
305 FRAME (W/M,P | PASS | 9/1/2020 | MARC PROSI |
620 INSULATION | PASS | 9/1/2020 | MARC PROSI |
555 METER RELEASE | PASS | 9/2/2020 | MARC PROSI |
826 STEEL BONDING | PARTIAL | 9/3/2020 | MARC PROSI |
322 DIAPRAGM SHEAR | PASS | 9/4/2020 | MARC PROSI |
525 ELECT ROUGH | PASS | 9/8/2020 | MARK WILLIAMS |
315 FRAME | PASS | 9/15/2020 | MARC PROSI |
730 LATH | PARTIAL | 9/16/2020 | MARC PROSI |
210 CMU REBAR | PASS | 9/17/2020 | MARC PROSI |
315 FRAME | PASS | 9/18/2020 | MARC PROSI |
210 CMU REBAR | PASS | 9/23/2020 | MARC PROSI |
525 ELECT ROUGH | PASS | 9/24/2020 | MARC PROSI |
210 CMU REBAR | PARTIAL | 10/13/2020 | MARC PROSI |
210 CMU REBAR | PASS | 10/14/2020 | MARC PROSI |
826 STEEL BONDING | PARTIAL | 10/14/2020 | MARC PROSI |
210 CMU REBAR | PASS | 10/19/2020 | TOM LOPEZ |
210 CMU REBAR | PASS | 10/20/2020 | MARC PROSI |
550 METER RELEASE | PASS | 10/21/2020 | MARC PROSI |
415 PLB UNDERGROUND | NOT READY | 10/21/2020 | MARC PROSI |
485 GAS TEST | NOT READY | 10/21/2020 | MARC PROSI |
820 POOL PLUMBING | PASS | 10/22/2020 | MARC PROSI |
826 STEEL BONDING | PARTIAL | 10/23/2020 | MARC PROSI |
826 STEEL BONDING | PASS | 10/30/2020 | MARC PROSI |
485 GAS TEST | NOT READY | 11/2/2020 | TOM LOPEZ |
455 MECHANICAL ROUGH | PARTIAL | 11/3/2020 | MARC PROSI |
750 T BAR CEILING | NOT READY | 11/3/2020 | MARC PROSI |
750 T BAR CEILING | PARTIAL | 11/4/2020 | MARC PROSI |
120 FOOTINGS | PASS | 11/24/2020 | MARC PROSI |
210 CMU REBAR | PASS | 11/24/2020 | MARC PROSI |
485 GAS TEST | PARTIAL | 12/1/2020 | MARC PROSI |
210 CMU REBAR | NOT READY | 12/4/2020 | MARC PROSI |
210 CMU REBAR | PASS | 12/8/2020 | MARC PROSI |
210 CMU REBAR | PASS | 12/11/2020 | MARC PROSI |
826 STEEL BONDING | PASS | 12/11/2020 | MARC PROSI |
250 CONCRETE SLAB | PASS | 12/18/2020 | MARC PROSI |
525 ELECT ROUGH | PASS | 12/18/2020 | MARC PROSI |
120 FOOTINGS | PASS | 1/5/2021 | MARC PROSI |
525 ELECT ROUGH | PASS | 1/12/2021 | MARC PROSI |
525 ELECT ROUGH | PASS | 1/22/2021 | MARC PROSI |
505 ELEC UNDERGROUND | PARTIAL | 4/2/2020 | MARC PROSI |
505 ELEC UNDERGROUND | PASS | 4/3/2020 | MARC PROSI |
730 LATH | PASS | 8/3/2020 | MARC PROSI |
210 CMU REBAR | NO INSPECTION | 10/26/2020 | BING COSBY |
750 T BAR CEILING | PASS | 10/27/2020 | BING COSBY |
REBAR | | | |
210 CMU REBAR | PASS | 10/29/2020 | MARC PROSI |
530 ELECT ROUGH | PASS | 11/23/2020 | MARC PROSI |
**915 FINAL COMMER | NO INSPECTION | 6/7/2021 | MARC PROSI |
|
|
Fees:
|
TEMP CERT OF OCCUPANCY | $399.85 | | |
TEMP CERT OF OCCUPANCY | $31.84 | | |
INSPECTION (MPR) | $0.00 | | |
INSPECTION (MPR) | $0.00 | | |
INSPECTION (MPR) | $0.00 | | |
INSPECTION (MPR) | $0.00 | | |
INSPECTION (MPR) | $0.00 | | |
INSPECTION (MPR) | $0.00 | | |
INSPECTION (MPR) | $0.00 | | |
INSPECTION (MPR) | $0.00 | | |
INSPECTION (MPR) | $0.00 | | |
INSPECTION (MPR) | $0.00 | | |
RESUBMITTAL | $222.00 | PR1701 | 04/11/2020 |
TEMP CERT OF OCC INSP-EA ADD 30 DAYS | $223.63 | | |
TEMP CERT OF OCC-EA ADD 30 DAYS PLAN CHK | $31.84 | | |
TEMP CERT OF OCC INSP-EA ADD 30 DAYS | $223.63 | | |
TEMP CERT OF OCC-EA ADD 30 DAYS PLAN CHK | $31.84 | | |
TEMP CERT OF OCC INSP-EA ADD 30 DAYS | $223.63 | | |
TEMP CERT OF OCC-EA ADD 30 DAYS PLAN CHK | $31.84 | | |
HOURLY PLAN REVIEW FEE | $427.58 | PR1701 | 04/11/2020 |
OVERTIME INSPECTION | $8,296.60 | PR1688 | 03/06/2020 |
FIRE- PLAN CHECK RESUBMITTAL | $222.00 | PR1571 | 06/26/2019 |
RESUBMITTAL | $222.00 | PR1768 | 01/05/2021 |
NEW COMMERCIAL BLDG PLAN CHECK | $6,423.36 | PR1182 | 01/09/2017 |
FIRE PLAN CHECK -COMM W/INT | $1,284.67 | PR1182 | 01/09/2017 |
FIRE INSPECT- COMM W/INT | $1,510.48 | PR1182 | 01/09/2017 |
PLN-REVIEW OF BUILDING PERMIT | $158.00 | PR1182 | 01/09/2017 |
COMMERCIAL SMIP | $5,236.00 | PR1571 | 06/26/2019 |
GENERAL PLAN SURCHARGE | $755.24 | PR1571 | 06/26/2019 |
NEW COMMERCIAL BLDG PERMIT | $7,552.38 | PR1571 | 06/26/2019 |
PERMIT IMAGING SURCHARGE | $5.00 | PR1571 | 06/26/2019 |
PERMIT TECHNOLOGY SURCHARGE | $151.05 | PR1571 | 06/26/2019 |
PLAN CHECK TECHNOLOGY SURCHARGE | $128.47 | PR1571 | 06/26/2019 |
PLANS IMAGING SURCHARGE | $150.00 | PR1571 | 06/26/2019 |
SB 1473 GREEN TAX | $744.00 | PR1571 | 06/26/2019 |
WTR- PLAN CHECK COMM W/INT | $963.50 | PR1571 | 06/26/2019 |
PUBLIC FACILITY NON-RESIDENTIAL | $13,530.00 | PR1571 | 06/26/2019 |
ENG- FEMA ELEVATION CERTIFCATE | $255.00 | PR1571 | 06/26/2019 |
|
|
|
TOTAL FEES:
|
$49,435.43
|
TOTAL FEES PAID:
|
$48,237.33
|
TOTAL FEES DUE:
|
$1,198.10
|
|
|
|