Site Address:Â
|
4000 MISSION AVE OCEANSIDE, CA 92058
|
Site APN:Â
|
1580651100
|
Subdivision:Â
|
MISSION LANDS OF SAN LUIS REY
|
Site Block:Â
|
|
Site Lot:Â
|
|
Valuation:Â
|
$50,000,000.00
|
Site Tract:Â
|
|
Permit Status:Â
|
FINALED
|
|
Description of Work:
|
NEW CONSTRUCTION OF 3 STORY ASSISTED LIVING/MEMORY CARE 213,
|
|
|
Contractor:
|
W E O'NEIL CONSTRUCTION CO OF SAN DIEGO
|
Address:
|
11633 SORRENTO VALLEY RD SAN DIEGO CA 92121
|
Phone:
|
(858) 926-4087
|
|
Technical Information:
|
PLAN ID # | |
PERMIT # | |
BIN # | |
FIRE SPRINKLER | 1 |
FLOOD ZONE | |
REDEV AREA | |
COASTAL ZONE | |
OCC GROUP | R2.1 |
SAND OIL INTRCPTR | |
TYPE CONST | VA |
OCC LOAD | 2311 |
UNITS | 213 |
EXISTING BLDG SF | |
STATE CODE EDITION | 2019 |
GREASE INTRCPTR | |
BLDG SF | 180280 |
NO STORIES | 0 |
ELECTRIC RELEASED BY | |
NOTIFIED SDGE BY | |
DATE ELECTRIC RELEASED | 12:00:00 AM |
ELECTRIC RELEASE TYPE | |
TYPE OF BUILDING | |
GAS RELEASED BY | |
NOTIFIED SDGE BY | |
DATE GAS RELEASED | 12:00:00 AM |
GAS RELEASE TYPE | |
WDID # | |
|
|
|
Owner:
|
OLD MISSION SAN LUIS REY
|
Address:
|
4050 MISSION AVE SAN LUIS REY CA 92057
|
Phone:
|
|
|
|
|
WORKERS COMPENSATION DECLARATION
|
WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES.
I hereby affirm under penalty of perjury one of the following declarations:
____ I have and will maintain a certificate of consent to self-insure for workers' compensation, issued by the Director of Industrial Relations as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued.
Policy No.
____ I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are:
Carrier: Policy Number: Expiration Date:
____ I certify that, in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that, if I should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those provisions.
|
LICENSED CONTRACTOR'S DECLARATION
|
I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and my license is in full force and effect.
License No:
Expiration Date:
Contractor:
Class:
|
|
|
Inspections:
|
340 SHEAR & DIAPRAGM | NO INSPECTION | 5/17/2022 | BING COSBY |
323 DIAPRAGM ROOF | PASS | 5/17/2022 | BING COSBY |
425 PLUMB ROUGH | PASS | 5/20/2022 | MICHAEL TROSTRUD |
525 ELECT ROUGH | PASS | 5/20/2022 | MICHAEL TROSTRUD |
705 WALL BOARD | PASS | 5/20/2022 | MICHAEL TROSTRUD |
322 DIAPRAGM SHEAR | PASS | 7/12/2022 | CHRIS BABCOCK |
340 SHEAR & DIAPRAGM | PASS | 7/12/2022 | CHRIS BABCOCK |
900 FIRE FINAL | PASS | 8/9/2023 | RON OWENS |
50 PRECON | PASS | 3/14/2022 | CHRIS BABCOCK |
120 FOOTINGS | | | |
415 PLB UNDERGROUND | NO INSPECTION | 10/29/2021 | BING COSBY |
505 ELEC UNDERGROUND | | | |
415 PLB UNDERGROUND | | | |
505 ELEC UNDERGROUND | PASS | 10/29/2021 | BING COSBY |
330 SHEAR & DIAPRAGM | PARTIAL | 4/6/2022 | ELGIN M. ROWLAND |
455 MECH ROUGH | NO INSPECTION | 5/26/2022 | CHRIS BABCOCK |
525 ELECT ROUGH | NO INSPECTION | 11/9/2021 | BING COSBY |
620 INSULATION | | | |
715 WALL BOARD | CORRECTIONS | 3/15/2022 | CHRIS BABCOCK |
740 LATH | | | |
750 T BAR CEILING | | | |
490 GAS TEST | | | |
555 METER RELEASE | | | |
900 FIRE FINAL | PARTIAL | 7/10/2023 | RANDY HILL |
50 PRECON | | | |
323 DIAPRAGM ROOF | PASS | 5/26/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | | | |
991 LANDSCAPING | | | |
992 STREET LIGHTING | | | |
993 ENGINEERING | | | |
996 WATER UTILITIES | | | |
997 PLANNING | | | |
**910 FINAL MULTI | | | |
410 PLB UNDERGROUND | NOT READY | 11/2/2021 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | PASS | 11/2/2021 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | NOT READY | 11/3/2021 | CHRIS BABCOCK |
410 PLB UNDERGROUND | NOT READY | 11/4/2021 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | NOT READY | 11/4/2021 | CHRIS BABCOCK |
410 PLB UNDERGROUND | PASS | 11/8/2021 | BING COSBY |
505 ELEC UNDERGROUND | NOT READY | 11/8/2021 | BING COSBY |
505 ELEC UNDERGROUND | PASS | 11/9/2021 | BING COSBY |
505 ELEC UNDERGROUND | PASS | 11/15/2021 | CHRIS BABCOCK |
410 PLB UNDERGROUND | PARTIAL | 11/16/2021 | CHRIS BABCOCK |
105 FOOTINGS | PARTIAL | 11/16/2021 | CHRIS BABCOCK |
250 CONCRETE SLAB | PASS | 11/16/2021 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | PASS | 11/17/2021 | CHRIS BABCOCK |
105 FOOTINGS | PASS | 11/17/2021 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | PASS | 11/19/2021 | CHRIS BABCOCK |
410 PLB UNDERGROUND | PASS | 11/22/2021 | BING COSBY |
410 PLB UNDERGROUND | PASS | 11/23/2021 | BING COSBY |
410 PLB UNDERGROUND | PASS | 11/29/2021 | CHRIS BABCOCK |
250 CONCRETE SLAB | PARTIAL | 11/30/2021 | CHRIS BABCOCK |
105 FOOTINGS | PARTIAL | 11/30/2021 | CHRIS BABCOCK |
410 PLB UNDERGROUND | NOT READY | 12/2/2021 | CHRIS BABCOCK |
410 PLB UNDERGROUND | PASS | 12/3/2021 | CHRIS BABCOCK |
250 CONCRETE SLAB | PARTIAL | 12/6/2021 | CHRIS BABCOCK |
105 FOOTINGS | PASS | 12/7/2021 | CHRIS BABCOCK |
250 CONCRETE SLAB | PASS | 12/8/2021 | BING COSBY |
410 PLB UNDERGROUND | PASS | 12/8/2021 | BING COSBY |
505 ELEC UNDERGROUND | PASS | 12/9/2021 | CHRIS BABCOCK |
250 CONCRETE SLAB | CORRECTIONS | 12/9/2021 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | PASS | 12/10/2021 | BING COSBY |
820 POOL PLUMBING | | 12/10/2021 | |
822 POOL ELECTRIC | | 12/10/2021 | |
250 CONCRETE SLAB | PASS | 12/13/2021 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | PASS | 12/13/2021 | CHRIS BABCOCK |
250 CONCRETE SLAB | PARTIAL | 12/17/2021 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | PASS | 12/17/2021 | CHRIS BABCOCK |
115 FOOTINGS | PASS | 12/20/2021 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | PASS | 12/21/2021 | CHRIS BABCOCK |
824 POOL STEEL | | 12/21/2021 | |
505 ELEC UNDERGROUND | NO INSPECTION | 12/22/2021 | CHRIS BABCOCK |
250 CONCRETE SLAB | PASS | 1/5/2022 | MICHAEL TROSTRUD |
505 ELEC UNDERGROUND | PASS | 1/5/2022 | MICHAEL TROSTRUD |
505 ELEC UNDERGROUND | PASS | 1/6/2022 | CHRIS BABCOCK |
105 FOOTINGS | PASS | 1/11/2022 | CHRIS BABCOCK |
250 CONCRETE SLAB | NOT READY | 1/13/2022 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | NOT READY | 1/13/2022 | CHRIS BABCOCK |
250 CONCRETE SLAB | PARTIAL | 1/14/2022 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | PASS | 1/24/2022 | MARK WILLIAMS |
250 CONCRETE SLAB | PASS | 1/24/2022 | MARK WILLIAMS |
250 CONCRETE SLAB | PARTIAL | 1/31/2022 | CHRIS BABCOCK |
250 CONCRETE SLAB | PASS | 2/1/2022 | CHRIS BABCOCK |
250 CONCRETE SLAB | PASS | 2/2/2022 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | PASS | 2/4/2022 | CHRIS BABCOCK |
250 CONCRETE SLAB | | | |
322 DIAPRAGM SHEAR | NOT READY | 2/16/2022 | CHRIS BABCOCK |
321 DIAPRAGM FLOOR | NO INSPECTION | 2/21/2022 | ELGIN M. ROWLAND |
323 DIAPRAGM ROOF | NO INSPECTION | 2/23/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 6/3/2022 | CHRIS BABCOCK |
340 SHEAR & DIAPRAGM | NOT READY | 6/3/2022 | CHRIS BABCOCK |
321 DIAPRAGM FLOOR | PASS | 6/3/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | NOT READY | 6/3/2022 | CHRIS BABCOCK |
323 DIAPRAGM ROOF | PARTIAL | 6/3/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | PARTIAL | 6/8/2022 | CHRIS BABCOCK |
323 DIAPRAGM ROOF | NOT READY | 6/9/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | PASS | 6/9/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | PASS | 6/9/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 6/15/2022 | MICHAEL TROSTRUD |
525 ELECT ROUGH | PASS | 6/16/2022 | CHRIS BABCOCK |
340 SHEAR & DIAPRAGM | PARTIAL | 6/21/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 6/23/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 6/23/2022 | CHRIS BABCOCK |
323 DIAPRAGM ROOF | NOT READY | 7/1/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | NOT READY | 7/20/2022 | CHRIS BABCOCK |
730 LATH | PASS | 8/3/2022 | CHRIS BABCOCK |
323 DIAPRAGM ROOF | PASS | 8/5/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | FAILED | 8/8/2022 | CHRIS BABCOCK |
321 DIAPRAGM FLOOR | NOT READY | 9/2/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | PASS | 9/19/2022 | CHRIS BABCOCK |
105 FOOTINGS | FAILED | 9/22/2022 | CHRIS BABCOCK |
705 WALL BOARD | FAILED | 9/29/2022 | CHRIS BABCOCK |
321 DIAPRAGM FLOOR | NOT READY | 10/3/2022 | CHRIS BABCOCK |
730 LATH | PASS | 10/4/2022 | CHRIS BABCOCK |
323 DIAPRAGM ROOF | NOT READY | 10/5/2022 | CHRIS BABCOCK |
323 DIAPRAGM ROOF | PASS | 10/7/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | PASS | 10/10/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 10/11/2022 | CHRIS BABCOCK |
**905 FINAL SFR | | 10/25/2022 | |
730 LATH | FAILED | 10/25/2022 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | NOT READY | 1/23/2023 | CHRIS BABCOCK |
**905 FINAL SFR | | 1/27/2023 | |
505 ELEC UNDERGROUND | PASS | 1/27/2023 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 3/8/2023 | CHRIS BABCOCK |
750 T BAR CEILING | PASS | 3/22/2023 | CHRIS BABCOCK |
530 ELECT ROUGH | PASS | 4/5/2023 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | PASS | 3/23/2022 | CHRIS BABCOCK |
120 FOOTINGS | PASS | 3/24/2022 | CHRIS BABCOCK |
715 WALL BOARD | FAILED | 3/24/2022 | CHRIS BABCOCK |
705 WALL BOARD | NOT READY | 3/25/2022 | CHRIS BABCOCK |
105 FOOTINGS | PASS | 3/28/2022 | CHRIS BABCOCK |
321 DIAPRAGM FLOOR | NO INSPECTION | 3/28/2022 | CHRIS BABCOCK |
330 SHEAR & DIAPRAGM | PARTIAL | 4/5/2022 | ELGIN M. ROWLAND |
210 CMU REBAR | NOT READY | 4/4/2022 | ELGIN M. ROWLAND |
321 DIAPRAGM FLOOR | PASS | 4/8/2022 | CHRIS BABCOCK |
PRECON | PASS | 4/8/2022 | CHRIS BABCOCK |
330 SHEAR & DIAPRAGM | FAILED | 4/12/2022 | CHRIS BABCOCK |
323 DIAPRAGM ROOF | PASS | 4/13/2022 | CHRIS BABCOCK |
323 DIAPRAGM ROOF | PARTIAL | 4/15/2022 | CHRIS BABCOCK |
330 SHEAR & DIAPRAGM | PARTIAL | 4/18/2022 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | PASS | 11/29/2021 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | PASS | 12/3/2021 | CHRIS BABCOCK |
250 CONCRETE SLAB | PASS | 12/21/2021 | CHRIS BABCOCK |
250 CONCRETE SLAB | PASS | 1/6/2022 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | NO INSPECTION | 1/18/2022 | CHRIS BABCOCK |
250 CONCRETE SLAB | PARTIAL | 1/19/2022 | MARK WILLIAMS |
250 CONCRETE SLAB | PASS W/CONDITIONS | 1/20/2022 | MARK WILLIAMS |
505 ELEC UNDERGROUND | FAILED | 1/20/2022 | MARK WILLIAMS |
250 CONCRETE SLAB | | | |
250 CONCRETE SLAB | | 6/1/2022 | |
250 CONCRETE SLAB | | 2/1/2022 | |
250 CONCRETE SLAB | PASS | 2/1/2022 | CHRIS BABCOCK |
250 CONCRETE SLAB | CORRECTIONS | 2/1/2022 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | PASS | 2/1/2022 | CHRIS BABCOCK |
250 CONCRETE SLAB | | 2/3/2022 | |
505 ELEC UNDERGROUND | NOT READY | 2/2/2022 | CHRIS BABCOCK |
250 CONCRETE SLAB | PARTIAL | 2/3/2022 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | PASS | 2/3/2022 | CHRIS BABCOCK |
250 CONCRETE SLAB | PARTIAL | 2/8/2022 | CHRIS BABCOCK |
250 CONCRETE SLAB | PASS | 2/10/2022 | CHRIS BABCOCK |
250 CONCRETE SLAB | CORRECTIONS | 2/9/2022 | CHRIS BABCOCK |
315 FRAME | PARTIAL | 2/15/2022 | CHRIS BABCOCK |
315 FRAME | PASS | 2/17/2022 | CHRIS BABCOCK |
321 DIAPRAGM FLOOR | PASS | 3/8/2022 | CHRIS BABCOCK |
321 DIAPRAGM FLOOR | PASS | 2/24/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | PASS | 5/27/2022 | CHRIS BABCOCK |
321 DIAPRAGM FLOOR | NOT READY | 5/27/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | PASS | 6/1/2022 | CHRIS BABCOCK |
323 DIAPRAGM ROOF | NOT READY | 6/1/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 6/1/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | PASS | 6/1/2022 | CHRIS BABCOCK |
605 INSULATION | NOT READY | 6/1/2022 | CHRIS BABCOCK |
250 CONCRETE SLAB | PASS | 6/1/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | PASS | 6/7/2022 | CHRIS BABCOCK |
323 DIAPRAGM ROOF | CORRECTIONS | 6/7/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | NOT READY | 6/7/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 6/7/2022 | CHRIS BABCOCK |
323 DIAPRAGM ROOF | PASS | 6/8/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | NOT READY | 6/8/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 6/8/2022 | CHRIS BABCOCK |
455 MECHANICAL ROUGH | PARTIAL | 6/8/2022 | CHRIS BABCOCK |
525 ELECT ROUGH | PARTIAL | 6/8/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | | 6/9/2022 | |
323 DIAPRAGM ROOF | | 6/10/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 6/10/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 6/10/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | PASS | 6/13/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | PASS | 6/13/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | PASS | 6/15/2022 | MICHAEL TROSTRUD |
730 LATH | PASS | 6/16/2022 | CHRIS BABCOCK |
710 WALL BOARD | PASS | 6/16/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | PASS | 6/16/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | FAILED | 6/17/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | PASS | 6/17/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 6/17/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 6/21/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | NOT READY | 6/21/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | NOT READY | 6/21/2022 | CHRIS BABCOCK |
525 ELECT ROUGH | NOT READY | 6/21/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | NOT READY | 6/22/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 6/22/2022 | CHRIS BABCOCK |
323 DIAPRAGM ROOF | PASS | 6/22/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | NO INSPECTION | 6/23/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 6/24/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 6/24/2022 | CHRIS BABCOCK |
323 DIAPRAGM ROOF | NO INSPECTION | 6/24/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | PASS | 6/24/2022 | CHRIS BABCOCK |
710 WALL BOARD | | 6/24/2022 | |
323 DIAPRAGM ROOF | NOT READY | 6/27/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | PASS | 6/27/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 6/27/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | PASS | 6/29/2022 | CHRIS BABCOCK |
730 LATH | PASS | 6/29/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 6/29/2022 | CHRIS BABCOCK |
323 DIAPRAGM ROOF | NOT READY | 6/29/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 6/29/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | PASS | 6/30/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | PASS | 7/1/2022 | CHRIS BABCOCK |
485 GAS TEST | NOT READY | 7/1/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 7/1/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 7/1/2022 | CHRIS BABCOCK |
340 SHEAR & DIAPRAGM | PASS | 7/5/2022 | BING COSBY |
310 FRAME (W/M.P.E) | PASS | 7/5/2022 | BING COSBY |
322 DIAPRAGM SHEAR | PASS | 7/6/2022 | BING COSBY |
425 PLUMB ROUGH | NO INSPECTION | 7/7/2022 | BING COSBY |
322 DIAPRAGM SHEAR | NO INSPECTION | 7/7/2022 | BING COSBY |
605 INSULATION | PASS | 7/7/2022 | BING COSBY |
705 WALL BOARD | PASS | 7/7/2022 | BING COSBY |
322 DIAPRAGM SHEAR | PASS | 7/8/2022 | BING COSBY |
705 WALL BOARD | PASS | 7/8/2022 | BING COSBY |
425 PLUMB ROUGH | PASS | 7/8/2022 | BING COSBY |
425 PLUMB ROUGH | NOT READY | 7/11/2022 | CHRIS BABCOCK |
705 WALL BOARD | NOT READY | 7/11/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | PASS | 7/11/2022 | CHRIS BABCOCK |
350 FRAMING | PASS | 7/11/2022 | CHRIS BABCOCK |
323 DIAPRAGM ROOF | PASS | 7/13/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | PASS | 7/13/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 7/13/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 7/13/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 7/13/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 7/14/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | PASS | 7/14/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | PASS | 7/15/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 7/15/2022 | CHRIS BABCOCK |
620 INSULATION | PASS | 7/15/2022 | CHRIS BABCOCK |
**905 FINAL SFR | | 7/18/2022 | |
605 INSULATION | PASS | 7/18/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 7/18/2022 | CHRIS BABCOCK |
340 SHEAR & DIAPRAGM | PASS | 7/18/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | PASS | 7/18/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | NOT READY | 7/19/2022 | CHRIS BABCOCK |
340 SHEAR & DIAPRAGM | PASS | 7/19/2022 | CHRIS BABCOCK |
**905 FINAL SFR | | 7/19/2022 | |
605 INSULATION | | 7/19/2022 | |
605 INSULATION | PASS | 7/19/2022 | CHRIS BABCOCK |
525 ELECT ROUGH | PASS | 7/21/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | PASS | 7/21/2022 | CHRIS BABCOCK |
340 SHEAR & DIAPRAGM | PASS | 7/21/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 7/21/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 7/21/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | PASS | 7/25/2022 | BING COSBY |
730 LATH | PASS | 7/25/2022 | BING COSBY |
425 PLUMB ROUGH | PASS | 7/25/2022 | BING COSBY |
455 MECHANICAL ROUGH | PASS | 7/25/2022 | BING COSBY |
525 ELECT ROUGH | PASS | 7/25/2022 | BING COSBY |
605 INSULATION | PASS | 7/25/2022 | BING COSBY |
705 WALL BOARD | PASS | 7/25/2022 | BING COSBY |
705 WALL BOARD | PASS | 7/25/2022 | BING COSBY |
425 PLUMB ROUGH | PASS | 7/28/2022 | MICHAEL TROSTRUD |
705 WALL BOARD | PASS | 7/28/2022 | MICHAEL TROSTRUD |
605 INSULATION | PASS | 7/28/2022 | MICHAEL TROSTRUD |
455 MECHANICAL ROUGH | PASS | 7/28/2022 | MICHAEL TROSTRUD |
730 LATH | NOT READY | 7/29/2022 | CHRIS BABCOCK |
340 SHEAR & DIAPRAGM | PASS | 8/1/2022 | BING COSBY |
730 LATH | NOT READY | 8/1/2022 | BING COSBY |
455 MECHANICAL ROUGH | NOT READY | 8/1/2022 | BING COSBY |
425 PLUMB ROUGH | NOT READY | 8/1/2022 | BING COSBY |
605 INSULATION | PASS | 8/1/2022 | BING COSBY |
705 WALL BOARD | PASS | 8/1/2022 | BING COSBY |
730 LATH | PASS | 8/2/2022 | CHRIS BABCOCK |
620 INSULATION | PASS | 8/3/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | PASS | 8/3/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 8/3/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 8/4/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 8/4/2022 | CHRIS BABCOCK |
705 WALL BOARD | | 8/4/2022 | |
705 WALL BOARD | | 8/4/2022 | |
715 WALL BOARD | PASS | 8/4/2022 | CHRIS BABCOCK |
730 LATH | NOT READY | 8/4/2022 | CHRIS BABCOCK |
525 ELECT ROUGH | PASS | 8/8/2022 | CHRIS BABCOCK |
730 LATH | PASS | 8/8/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 8/8/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 8/8/2022 | CHRIS BABCOCK |
323 DIAPRAGM ROOF | FAILED | 8/8/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | NOT READY | 8/9/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | PASS | 8/9/2022 | CHRIS BABCOCK |
323 DIAPRAGM ROOF | FAILED | 8/9/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 8/10/2022 | BING COSBY |
705 WALL BOARD | NOT READY | 8/10/2022 | BING COSBY |
322 DIAPRAGM SHEAR | PASS | 8/10/2022 | BING COSBY |
605 INSULATION | NOT READY | 8/10/2022 | BING COSBY |
310 FRAME (W/M.P.E) | NO INSPECTION | 8/11/2022 | BING COSBY |
605 INSULATION | PASS | 8/11/2022 | BING COSBY |
705 WALL BOARD | PASS | 8/11/2022 | BING COSBY |
485 GAS TEST | PASS | 8/11/2022 | BING COSBY |
705 WALL BOARD | PASS | 8/12/2022 | CHRIS BABCOCK |
323 DIAPRAGM ROOF | PASS | 8/12/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | NOT READY | 8/15/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | PASS | 8/15/2022 | CHRIS BABCOCK |
350 FRAMING | PASS | 8/16/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 8/17/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 8/17/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 8/18/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | PASS | 8/18/2022 | CHRIS BABCOCK |
525 ELECT ROUGH | NO INSPECTION | 8/18/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 8/18/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | NOT READY | 8/19/2022 | CHRIS BABCOCK |
**905 FINAL SFR | PARTIAL | 7/11/2023 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | NOT READY | 8/19/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 8/19/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 8/19/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | PARTIAL | 8/22/2022 | CHRIS BABCOCK |
323 DIAPRAGM ROOF | FAILED | 8/22/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 8/22/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | PASS | 8/22/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 8/22/2022 | CHRIS BABCOCK |
715 WALL BOARD | PASS | 8/22/2022 | CHRIS BABCOCK |
323 DIAPRAGM ROOF | NOT READY | 8/23/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 8/23/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 8/23/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 8/23/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 8/24/2022 | CHRIS BABCOCK |
323 DIAPRAGM ROOF | FAILED | 8/24/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 8/24/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 8/24/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | NOT READY | 8/24/2022 | CHRIS BABCOCK |
340 SHEAR & DIAPRAGM | NOT READY | 8/25/2022 | CHRIS BABCOCK |
315 FRAME | PASS | 8/25/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | NOT READY | 8/25/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 8/25/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 8/25/2022 | CHRIS BABCOCK |
323 DIAPRAGM ROOF | NOT READY | 8/25/2022 | CHRIS BABCOCK |
315 FRAME | PASS | 8/26/2022 | CHRIS BABCOCK |
455 MECHANICAL ROUGH | NOT READY | 8/26/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 8/26/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | NOT READY | 8/29/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | PASS | 8/29/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 8/29/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 8/29/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | FAILED | 8/30/2022 | CHRIS BABCOCK |
525 ELECT ROUGH | PASS | 8/30/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 8/30/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 8/30/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | NOT READY | 8/30/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 8/31/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | PASS | 8/31/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 8/31/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 8/31/2022 | CHRIS BABCOCK |
210 CMU REBAR | PASS | 8/31/2022 | CHRIS BABCOCK |
730 LATH | PASS | 9/1/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | NO INSPECTION | 9/1/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | NOT READY | 9/1/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 9/1/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | PASS | 9/1/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 9/2/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | PASS | 9/2/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 9/2/2022 | CHRIS BABCOCK |
455 MECHANICAL ROUGH | PASS | 9/2/2022 | CHRIS BABCOCK |
455 MECHANICAL ROUGH | PASS | 9/7/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | NOT READY | 9/7/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 9/7/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 9/7/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 9/9/2022 | CHRIS BABCOCK |
**905 FINAL SFR | | | |
705 WALL BOARD | PASS | 9/9/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 9/9/2022 | CHRIS BABCOCK |
340 SHEAR & DIAPRAGM | PASS | 9/9/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | NO INSPECTION | 9/9/2022 | CHRIS BABCOCK |
730 LATH | PASS | 9/12/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | NO INSPECTION | 9/12/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 9/12/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 9/12/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | NO INSPECTION | 9/12/2022 | CHRIS BABCOCK |
321 DIAPRAGM FLOOR | FAILED | 9/14/2022 | CHRIS BABCOCK |
730 LATH | PASS | 9/13/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 9/13/2022 | CHRIS BABCOCK |
705 WALL BOARD | NO INSPECTION | 9/13/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | PASS | 9/13/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | NOT READY | 9/14/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 9/14/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 9/14/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 9/15/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 9/15/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 9/15/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | NOT READY | 9/16/2022 | CHRIS BABCOCK |
340 SHEAR & DIAPRAGM | NOT READY | 9/16/2022 | CHRIS BABCOCK |
605 INSULATION | NOT READY | 9/16/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 9/16/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 9/19/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 9/19/2022 | CHRIS BABCOCK |
705 WALL BOARD | NOT READY | 9/19/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 9/20/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 9/20/2022 | CHRIS BABCOCK |
323 DIAPRAGM ROOF | PASS | 9/20/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 9/21/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 9/21/2022 | CHRIS BABCOCK |
705 WALL BOARD | NO INSPECTION | 9/21/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 9/22/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 9/22/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 9/22/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 9/23/2022 | CHRIS BABCOCK |
705 WALL BOARD | NOT READY | 9/23/2022 | CHRIS BABCOCK |
210 CMU REBAR | NOT READY | 9/23/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 9/23/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | PASS | 9/23/2022 | CHRIS BABCOCK |
321 DIAPRAGM FLOOR | SAME DAY CANCEL | 9/26/2022 | CHRIS BABCOCK |
210 CMU REBAR | SAME DAY CANCEL | 9/26/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | SAME DAY CANCEL | 9/26/2022 | CHRIS BABCOCK |
605 INSULATION | SAME DAY CANCEL | 9/26/2022 | CHRIS BABCOCK |
705 WALL BOARD | SAME DAY CANCEL | 9/26/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 9/27/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 9/27/2022 | CHRIS BABCOCK |
705 WALL BOARD | NOT READY | 9/27/2022 | CHRIS BABCOCK |
322 DIAPHRAGM SHEAR | PASS | 9/28/2022 | CHRIS BABCOCK |
730 LATH | PASS | 9/28/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 9/28/2022 | CHRIS BABCOCK |
620 INSULATION | PASS | 9/28/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | PASS | 9/28/2022 | CHRIS BABCOCK |
340 SHEAR & DIAPRAGM | PASS | 9/28/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | NO INSPECTION | 9/28/2022 | CHRIS BABCOCK |
321 DIAPRAGM FLOOR | NOT READY | 9/29/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | NOT READY | 9/29/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | PASS | 9/29/2022 | CHRIS BABCOCK |
455 MECHANICAL ROUGH | NOT READY | 9/30/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PARTIAL | 9/30/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | NO INSPECTION | 9/30/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 9/30/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 9/30/2022 | CHRIS BABCOCK |
730 LATH | FAILED | 10/3/2022 | CHRIS BABCOCK |
323 DIAPRAGM ROOF | NOT READY | 10/3/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PARTIAL | 10/3/2022 | CHRIS BABCOCK |
455 MECHANICAL ROUGH | NO INSPECTION | 10/6/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 10/5/2022 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | PASS | 10/5/2022 | CHRIS BABCOCK |
705 WALL BOARD | NOT READY | 10/5/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 10/5/2022 | CHRIS BABCOCK |
321 DIAPRAGM FLOOR | PASS | 10/5/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | FAILED | 10/6/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | PASS | 10/6/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 10/6/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 10/6/2022 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | NO INSPECTION | 10/6/2022 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | PASS | 10/7/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | | | |
605 INSULATION | PASS | 10/7/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 10/7/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | NO INSPECTION | 10/10/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | PASS | 10/11/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 10/11/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | PASS | 10/11/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | | | |
505 ELEC UNDERGROUND | | | |
705 WALL BOARD | | | |
605 INSULATION | | | |
310 FRAME (W/M.P.E) | PASS | 10/13/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | NO INSPECTION | 10/13/2022 | CHRIS BABCOCK |
455 MECHANICAL ROUGH | PASS | 10/13/2022 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | PASS | 10/13/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 10/13/2022 | CHRIS BABCOCK |
105 FOOTINGS | PASS | 10/18/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 10/14/2022 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | PASS | 10/18/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | NO INSPECTION | 10/14/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 10/14/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | PASS | 10/14/2022 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | NOT READY | 10/17/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | FAILED | 10/17/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 10/17/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 10/17/2022 | CHRIS BABCOCK |
315 FRAME | FAILED | 10/18/2022 | CHRIS BABCOCK |
605 INSULATION | NOT READY | 10/18/2022 | CHRIS BABCOCK |
315 FRAME | FAILED | 10/19/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 10/19/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 10/19/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | | 10/21/2022 | |
495 PLB UNDERGROUND | NOT READY | 10/21/2022 | CHRIS BABCOCK |
315 FRAME | PASS | 10/21/2022 | CHRIS BABCOCK |
455 MECHANICAL ROUGH | PASS | 10/21/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 10/21/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 10/21/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 10/24/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 10/24/2022 | CHRIS BABCOCK |
455 MECHANICAL ROUGH | NOT READY | 10/24/2022 | CHRIS BABCOCK |
455 MECHANICAL ROUGH | NO INSPECTION | 10/25/2022 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | NO INSPECTION | 10/25/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 10/25/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | NOT READY | 10/25/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 10/25/2022 | CHRIS BABCOCK |
315 FRAME | PASS | 10/26/2022 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | NO INSPECTION | 10/26/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | | 10/26/2022 | |
705 WALL BOARD | PASS | 10/26/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 10/26/2022 | CHRIS BABCOCK |
730 LATH | NOT READY | 10/26/2022 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | PASS | 10/27/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 10/27/2022 | CHRIS BABCOCK |
705 WALL BOARD | NOT READY | 10/27/2022 | CHRIS BABCOCK |
455 MECHANICAL ROUGH | PASS | 10/27/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 10/27/2022 | CHRIS BABCOCK |
735 LATH | PASS | 10/27/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | FAILED | 10/28/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 10/28/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 10/28/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | NO INSPECTION | 10/28/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | NOT READY | 10/31/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 10/31/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 10/31/2022 | CHRIS BABCOCK |
705 WALL BOARD | NOT READY | 11/1/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 11/1/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 11/1/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 11/3/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 11/3/2022 | CHRIS BABCOCK |
705 WALL BOARD | NOT READY | 11/3/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 11/7/2022 | BING COSBY |
605 INSULATION | PASS | 11/7/2022 | BING COSBY |
730 LATH | PASS | 11/7/2022 | BING COSBY |
705 WALL BOARD | PASS | 11/10/2022 | BING COSBY |
605 INSULATION | PASS | 11/10/2022 | BING COSBY |
705 WALL BOARD | PASS | 11/15/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 11/15/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | NO INSPECTION | 11/15/2022 | CHRIS BABCOCK |
323 DIAPRAGM ROOF | PASS | 11/15/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 11/16/2022 | CHRIS BABCOCK |
605 INSULATION | NOT READY | 11/16/2022 | CHRIS BABCOCK |
115 FOOTINGS | PASS | 11/16/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 11/16/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | PASS | 11/17/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 11/17/2022 | CHRIS BABCOCK |
455 MECHANICAL ROUGH | PASS | 11/17/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 11/21/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 11/21/2022 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | PASS | 11/21/2022 | CHRIS BABCOCK |
105 FOOTINGS | PASS | 11/22/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | NOT READY | 11/22/2022 | CHRIS BABCOCK |
605 INSULATION | NOT READY | 11/22/2022 | CHRIS BABCOCK |
705 WALL BOARD | NOT READY | 11/22/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | NOT READY | 11/23/2022 | CHRIS BABCOCK |
105 FOOTINGS | PASS | 11/23/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 11/28/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 11/28/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 11/28/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 11/29/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 11/29/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 11/30/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 11/30/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 11/30/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | NO INSPECTION | 12/1/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 12/1/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 12/1/2022 | CHRIS BABCOCK |
105 FOOTINGS | PASS | 12/2/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 12/2/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 12/2/2022 | CHRIS BABCOCK |
705 WALL BOARD | NOT READY | 12/5/2022 | CHRIS BABCOCK |
615 INSULATION | NOT READY | 12/5/2022 | CHRIS BABCOCK |
210 CMU REBAR | PASS | 12/5/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | NO INSPECTION | 12/6/2022 | CHRIS BABCOCK |
605 INSULATION | NO INSPECTION | 12/6/2022 | CHRIS BABCOCK |
715 WALL BOARD | NO INSPECTION | 12/6/2022 | CHRIS BABCOCK |
105 FOOTINGS | NOT READY | 12/7/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 12/7/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 12/7/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 12/7/2022 | CHRIS BABCOCK |
322 DIAPHRAGM SHEAR | FAILED | 12/8/2022 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | PASS | 12/8/2022 | CHRIS BABCOCK |
620 INSULATION | PASS | 12/9/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 12/9/2022 | CHRIS BABCOCK |
105 FOOTINGS | PASS | 12/9/2022 | CHRIS BABCOCK |
705 WALL BOARD | NOT READY | 12/12/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 12/12/2022 | CHRIS BABCOCK |
705 WALL BOARD | NOT READY | 12/13/2022 | CHRIS BABCOCK |
620 INSULATION | NOT READY | 12/13/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 12/14/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 12/14/2022 | CHRIS BABCOCK |
710 WALL BOARD | PASS | 12/14/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 12/15/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 12/15/2022 | CHRIS BABCOCK |
605 INSULATION | SAME DAY CANCEL | 12/16/2022 | CHRIS BABCOCK |
705 WALL BOARD | SAME DAY CANCEL | 12/16/2022 | CHRIS BABCOCK |
605 INSULATION | PARTIAL | 12/19/2022 | DUSTIN STOTLER |
705 WALL BOARD | PASS | 12/19/2022 | DUSTIN STOTLER |
705 WALL BOARD | PARTIAL | 12/20/2022 | MICHAEL TROSTRUD |
605 INSULATION | NOT READY | 12/20/2022 | MICHAEL TROSTRUD |
605 INSULATION | PASS | 12/21/2022 | DUSTIN STOTLER |
705 WALL BOARD | PASS | 12/21/2022 | DUSTIN STOTLER |
705 WALL BOARD | PASS | 12/22/2022 | DUSTIN STOTLER |
620 INSULATION | NO INSPECTION | 12/22/2022 | DUSTIN STOTLER |
310 FRAME (W/M.P.E) | PASS | 12/22/2022 | DUSTIN STOTLER |
105 FOOTINGS | | | |
105 FOOTINGS | PASS | 12/27/2022 | CHRIS BABCOCK |
210 CMU REBAR | | | |
210 CMU REBAR | PASS | 12/27/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 12/27/2022 | CHRIS BABCOCK |
605 INSULATION | PASS | 12/27/2022 | CHRIS BABCOCK |
605 INSULATION | | | |
310 FRAME (W/M.P.E) | PASS | 1/3/2023 | DUSTIN STOTLER |
605 INSULATION | PASS | 1/3/2023 | DUSTIN STOTLER |
705 WALL BOARD | PASS | 1/3/2023 | DUSTIN STOTLER |
310 FRAME (W/M.P.E) | PASS | 1/5/2023 | BING COSBY |
605 INSULATION | PASS | 1/5/2023 | BING COSBY |
705 WALL BOARD | PASS | 1/5/2023 | BING COSBY |
525 ELECT ROUGH | PASS | 1/9/2023 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 1/9/2023 | CHRIS BABCOCK |
705 WALL BOARD | | | |
605 INSULATION | PASS | 1/9/2023 | CHRIS BABCOCK |
605 INSULATION | NO INSPECTION | 1/10/2023 | CHRIS BABCOCK |
705 WALL BOARD | NO INSPECTION | 1/10/2023 | CHRIS BABCOCK |
605 INSULATION | PASS | 1/11/2023 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 1/11/2023 | CHRIS BABCOCK |
605 INSULATION | PASS | 1/12/2023 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 1/12/2023 | CHRIS BABCOCK |
425 PLUMB ROUGH | PASS | 1/13/2023 | CHRIS BABCOCK |
605 INSULATION | PASS | 1/13/2023 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 1/13/2023 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 1/17/2023 | CHRIS BABCOCK |
605 INSULATION | PASS | 1/17/2023 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | PASS | 1/19/2023 | CHRIS BABCOCK |
605 INSULATION | NOT READY | 1/19/2023 | CHRIS BABCOCK |
705 WALL BOARD | NOT READY | 1/19/2023 | CHRIS BABCOCK |
705 WALL BOARD | NOT READY | 1/20/2023 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 1/23/2023 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | PASS | 1/25/2023 | CHRIS BABCOCK |
750 T BAR CEILING | PARTIAL | 1/25/2023 | CHRIS BABCOCK |
455 MECHANICAL ROUGH | PARTIAL | 1/25/2023 | CHRIS BABCOCK |
750 T BAR CEILING | | | |
505 ELEC UNDERGROUND | | | |
730 LATH | PASS | 1/31/2023 | CHRIS BABCOCK |
110 FOOTINGS | PASS | 2/3/2023 | CHRIS BABCOCK |
605 INSULATION | PASS | 2/3/2023 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 2/3/2023 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | PASS | 2/3/2023 | CHRIS BABCOCK |
750 T BAR CEILING | NOT READY | 2/3/2023 | CHRIS BABCOCK |
455 MECHANICAL ROUGH | PARTIAL | 2/7/2023 | CHRIS BABCOCK |
210 CMU REBAR | NOT READY | 2/7/2023 | CHRIS BABCOCK |
750 T BAR CEILING | PASS | 2/7/2023 | CHRIS BABCOCK |
605 INSULATION | PASS | 2/7/2023 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 2/7/2023 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | PASS | 2/8/2023 | CHRIS BABCOCK |
605 INSULATION | PASS | 2/8/2023 | CHRIS BABCOCK |
550 METER RELEASE | PASS W/CONDITIONS | 2/9/2023 | CHRIS BABCOCK |
605 INSULATION | PASS | 2/9/2023 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 2/9/2023 | CHRIS BABCOCK |
455 MECHANICAL ROUGH | NO ENTRY | 2/13/2023 | DUSTIN STOTLER |
310 FRAME (W/M.P.E) | NO ENTRY | 2/13/2023 | DUSTIN STOTLER |
705 WALL BOARD | PASS | 2/13/2023 | DUSTIN STOTLER |
550 METER RELEASE | PARTIAL | 2/15/2023 | CHRIS BABCOCK |
605 INSULATION | PASS | 2/14/2023 | DUSTIN STOTLER |
310 FRAME (W/M.P.E) | PASS | 2/14/2023 | DUSTIN STOTLER |
110 FOOTINGS | PASS | 2/15/2023 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | NOT READY | 2/15/2023 | CHRIS BABCOCK |
705 WALL BOARD | NO INSPECTION | 2/15/2023 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 2/16/2023 | CHRIS BABCOCK |
550 METER RELEASE | PARTIAL | 2/16/2023 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 2/17/2023 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | PASS | 2/17/2023 | CHRIS BABCOCK |
550 METER RELEASE | PARTIAL | 2/17/2023 | CHRIS BABCOCK |
550 METER RELEASE | PASS | 2/20/2023 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 2/20/2023 | CHRIS BABCOCK |
525 ELECT ROUGH | PASS | 2/21/2023 | CHRIS BABCOCK |
550 METER RELEASE | PASS | 2/21/2023 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 2/21/2023 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | PASS | 2/21/2023 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 2/21/2023 | CHRIS BABCOCK |
550 METER RELEASE | PASS | 2/22/2023 | CHRIS BABCOCK |
105 FOOTINGS | NO INSPECTION | 2/22/2023 | CHRIS BABCOCK |
605 INSULATION | PASS | 2/22/2023 | CHRIS BABCOCK |
550 METER RELEASE | NOT READY | 2/23/2023 | CHRIS BABCOCK |
750 T BAR CEILING | PARTIAL | 2/23/2023 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 2/24/2023 | CHRIS BABCOCK |
550 METER RELEASE | NOT READY | 2/24/2023 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 2/24/2023 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 2/27/2023 | DUSTIN STOTLER |
705 WALL BOARD | | | |
550 METER RELEASE | NO ENTRY | 2/27/2023 | DUSTIN STOTLER |
455 MECHANICAL ROUGH | PASS | 2/28/2023 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 2/28/2023 | CHRIS BABCOCK |
550 METER RELEASE | NOT READY | 2/28/2023 | CHRIS BABCOCK |
105 FOOTINGS | CORRECTIONS | 3/2/2023 | DUSTIN STOTLER |
455 MECHANICAL ROUGH | PASS | 3/3/2023 | DUSTIN STOTLER |
705 WALL BOARD | | 3/3/2023 | |
750 T BAR CEILING | NO INSPECTION | 3/6/2023 | CHRIS BABCOCK |
455 MECHANICAL ROUGH | PASS | 3/6/2023 | CHRIS BABCOCK |
550 METER RELEASE | PASS | 3/6/2023 | CHRIS BABCOCK |
750 T BAR CEILING | | | |
310 FRAME (W/M.P.E) | FAILED | 3/7/2023 | CHRIS BABCOCK |
550 METER RELEASE | NOT READY | 3/7/2023 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | PASS | 3/7/2023 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 3/7/2023 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 3/8/2023 | CHRIS BABCOCK |
824 POOL STEEL | PASS | 3/13/2023 | DUSTIN STOTLER |
705 WALL BOARD | PASS | 3/13/2023 | DUSTIN STOTLER |
605 INSULATION | NO INSPECTION | 3/13/2023 | DUSTIN STOTLER |
824 POOL STEEL | PASS | 3/13/2023 | DUSTIN STOTLER |
705 WALL BOARD | NO ENTRY | 3/15/2023 | DUSTIN STOTLER |
455 MECHANICAL ROUGH | PASS | 3/15/2023 | DUSTIN STOTLER |
310 FRAME (W/M.P.E) | PASS | 3/16/2023 | DUSTIN STOTLER |
705 WALL BOARD | PASS | 3/16/2023 | DUSTIN STOTLER |
525 ELECT ROUGH | PASS | 3/16/2023 | DUSTIN STOTLER |
705 WALL BOARD | PASS | 3/17/2023 | DUSTIN STOTLER |
310 FRAME (W/M.P.E) | PASS | 3/17/2023 | DUSTIN STOTLER |
730 LATH | NO INSPECTION | 3/20/2023 | CHRIS BABCOCK |
705 WALL BOARD | NO INSPECTION | 3/20/2023 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 3/22/2023 | CHRIS BABCOCK |
730 LATH | PASS | 3/22/2023 | CHRIS BABCOCK |
105 FOOTINGS | NOT READY | 3/23/2023 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 3/23/2023 | CHRIS BABCOCK |
550 METER RELEASE | PASS | 3/24/2023 | CHRIS BABCOCK |
550 METER RELEASE | PASS | 3/27/2023 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 3/27/2023 | CHRIS BABCOCK |
705 WALL BOARD | SAME DAY CANCEL | 3/28/2023 | DUSTIN STOTLER |
550 METER RELEASE | SAME DAY CANCEL | 3/28/2023 | DUSTIN STOTLER |
730 LATH | PASS | 3/30/2023 | CHRIS BABCOCK |
550 METER RELEASE | PASS | 3/30/2023 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 4/4/2023 | CHRIS BABCOCK |
530 ELECT ROUGH | NOT READY | 4/4/2023 | CHRIS BABCOCK |
525 ELECT ROUGH | PASS | 4/6/2023 | CHRIS BABCOCK |
710 WALL BOARD | NOT READY | 4/6/2023 | CHRIS BABCOCK |
525 ELECT ROUGH | PASS | 4/7/2023 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 4/7/2023 | CHRIS BABCOCK |
525 ELECT ROUGH | PASS | 4/10/2023 | DUSTIN STOTLER |
310 FRAME (W/M.P.E) | PASS | 4/10/2023 | DUSTIN STOTLER |
705 WALL BOARD | PASS | 4/10/2023 | DUSTIN STOTLER |
750 T BAR CEILING | PASS | 4/11/2023 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | NOT READY | 4/11/2023 | CHRIS BABCOCK |
705 WALL BOARD | NOT READY | 4/11/2023 | CHRIS BABCOCK |
105 FOOTINGS | NO INSPECTION | 4/11/2023 | CHRIS BABCOCK |
750 T BAR CEILING | PASS | 4/12/2023 | CHRIS BABCOCK |
105 FOOTINGS | | | |
705 WALL BOARD | NOT READY | 4/13/2023 | CHRIS BABCOCK |
315 FRAME | PASS | 4/14/2023 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 4/14/2023 | CHRIS BABCOCK |
750 T BAR CEILING | PASS | 4/14/2023 | CHRIS BABCOCK |
705 WALL BOARD | NOT READY | 4/18/2023 | CHRIS BABCOCK |
**920E FINAL | PARTIAL | 4/18/2023 | CHRIS BABCOCK |
**920E FINAL | PARTIAL | 4/19/2023 | CHRIS BABCOCK |
**920E FINAL | PARTIAL | 4/20/2023 | CHRIS BABCOCK |
**920E FINAL | PARTIAL | 4/21/2023 | CHRIS BABCOCK |
750 T BAR CEILING | PASS | 4/21/2023 | CHRIS BABCOCK |
**920E FINAL | NOT READY | 4/24/2023 | DUSTIN STOTLER |
705 WALL BOARD | PASS | 4/24/2023 | DUSTIN STOTLER |
750 T BAR CEILING | PASS | 4/24/2023 | DUSTIN STOTLER |
**920E FINAL | FAILED | 4/26/2023 | CHRIS BABCOCK |
750 T BAR CEILING | PASS | 4/28/2023 | CHRIS BABCOCK |
**905 FINAL SFR | | 5/1/2023 | |
**920E FINAL | PARTIAL | 5/1/2023 | CHRIS BABCOCK |
750 T BAR CEILING | PASS | 5/2/2023 | CHRIS BABCOCK |
**920E FINAL | PARTIAL | 5/3/2023 | CHRIS BABCOCK |
525 ELECT ROUGH | PASS | 5/3/2023 | CHRIS BABCOCK |
750 T BAR CEILING | NOT READY | 5/3/2023 | CHRIS BABCOCK |
**920E FINAL | PARTIAL | 5/4/2023 | CHRIS BABCOCK |
705 WALL BOARD | NO INSPECTION | 5/9/2023 | BING COSBY |
**920E FINAL | NO INSPECTION | 5/9/2023 | BING COSBY |
750 T BAR CEILING | PARTIAL | 5/10/2023 | BING COSBY |
**920E FINAL | PARTIAL | 5/15/2023 | CHRIS BABCOCK |
750 T BAR CEILING | PASS | 5/15/2023 | CHRIS BABCOCK |
**920E FINAL | NOT READY | 5/16/2023 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | PASS | 5/19/2023 | CHRIS BABCOCK |
750 T BAR CEILING | PASS | 5/19/2023 | CHRIS BABCOCK |
**920E FINAL | PARTIAL | 5/19/2023 | CHRIS BABCOCK |
**920E FINAL | PARTIAL | 5/26/2023 | CHRIS BABCOCK |
750 T BAR CEILING | NOT READY | 5/26/2023 | CHRIS BABCOCK |
**920E FINAL | NOT READY | 5/31/2023 | DUSTIN STOTLER |
750 T BAR CEILING | PARTIAL | 5/31/2023 | DUSTIN STOTLER |
**920E FINAL | NOT READY | 6/1/2023 | CHRIS BABCOCK |
750 T BAR CEILING | FAILED | 6/1/2023 | CHRIS BABCOCK |
**920E FINAL | PARTIAL | 6/2/2023 | CHRIS BABCOCK |
**920E FINAL | PARTIAL | 6/6/2023 | CHRIS BABCOCK |
**920E FINAL | PARTIAL | 6/7/2023 | CHRIS BABCOCK |
750 T BAR CEILING | NOT READY | 6/15/2023 | CHRIS BABCOCK |
750 T BAR CEILING | PASS | 6/19/2023 | DUSTIN STOTLER |
**920E FINAL | NOT READY | 6/28/2023 | MICHAEL TROSTRUD |
**920E FINAL | PARTIAL | 6/30/2023 | CHRIS BABCOCK |
822 POOL ELECTRIC | PASS | 6/30/2023 | CHRIS BABCOCK |
**920E FINAL | NO ENTRY | 7/3/2023 | DUSTIN STOTLER |
**920E FINAL | PARTIAL | 7/5/2023 | CHRIS BABCOCK |
**920E FINAL | CORRECTIONS | 7/6/2023 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | FAILED | 5/6/2022 | CHRIS BABCOCK |
323 DIAPRAGM ROOF | NO INSPECTION | 5/12/2022 | CHRIS BABCOCK |
323 DIAPRAGM ROOF | PASS | 5/19/2022 | BING COSBY |
425 PLUMB ROUGH | PASS | 5/19/2022 | BING COSBY |
322 DIAPRAGM SHEAR | PASS | 5/26/2022 | CHRIS BABCOCK |
105 FOOTINGS | | 9/20/2021 | |
410 PLB UNDERGROUND | PARTIAL | 10/25/2021 | CHRIS BABCOCK |
321 DIAPRAGM FLOOR | PASS | 4/19/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | PASS | 4/19/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | PASS | 4/27/2022 | CHRIS BABCOCK |
323 DIAPRAGM ROOF | NOT READY | 4/27/2022 | CHRIS BABCOCK |
323 DIAPRAGM ROOF | PASS | 4/28/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | PASS | 5/2/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 5/2/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | PARTIAL | 5/12/2022 | CHRIS BABCOCK |
323 DIAPRAGM ROOF | PASS | 5/25/2022 | CHRIS BABCOCK |
310 FRAME (W/M.P.E) | PASS | 8/2/2022 | CHRIS BABCOCK |
305 FRAME (W/M,P | PASS | 11/4/2022 | CHRIS BABCOCK |
525 ELECT ROUGH | PASS | 1/24/2023 | CHRIS BABCOCK |
750 T BAR CEILING | PASS | 1/26/2023 | CHRIS BABCOCK |
**905 FINAL SFR | PARTIAL | 7/7/2023 | CHRIS BABCOCK |
**915 FINAL COMMER | PARTIAL | 7/12/2023 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | PASS | 10/12/2021 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | PARTIAL | 10/20/2021 | CHRIS BABCOCK |
495 PLB UNDERGROUND | PASS | 11/2/2021 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | PASS | 11/2/2021 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | | | |
321 DIAPRAGM FLOOR | PASS | 3/3/2022 | CHRIS BABCOCK |
321 DIAPRAGM FLOOR | PASS | 3/10/2022 | CHRIS BABCOCK |
410 PLB UNDERGROUND | PARTIAL | 10/18/2021 | CHRIS BABCOCK |
120 FOOTINGS | NO INSPECTION | 9/21/2021 | CHRIS BABCOCK |
410 PLB UNDERGROUND | | | |
50 PRECON | | | |
315 FRAME | | | |
60 SETBACKS | | | |
455 MECH ROUGH | | | |
525 ELECT ROUGH | | | |
620 INSULATION | | | |
715 WALL BOARD | | | |
740 LATH | | | |
750 T BAR CEILING | | | |
490 GAS TEST | | | |
555 METER RELEASE | | | |
991 LANDSCAPING | | | |
992 STREET LIGHTING | | | |
993 ENGINEERING | | | |
996 WATER UTILITIES | | | |
997 PLANNING | | | |
410 PLB UNDERGROUND | NOT READY | 10/13/2021 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | NOT READY | 10/13/2021 | CHRIS BABCOCK |
**905 FINAL SFR | PASS | 8/9/2023 | CHRIS BABCOCK |
323 DIAPRAGM ROOF | PASS | 5/18/2022 | BING COSBY |
340 SHEAR & DIAPRAGM | PASS | 5/18/2022 | BING COSBY |
425 PLUMB ROUGH | NO INSPECTION | 5/18/2022 | BING COSBY |
50 PRECON | PASS | 3/16/2022 | CHRIS BABCOCK |
115 FOOTINGS | NOT READY | 3/17/2022 | CHRIS BABCOCK |
410 PLB UNDERGROUND | PASS | 3/21/2022 | ELGIN M. ROWLAND |
321 DIAPRAGM FLOOR | PASS | 3/21/2022 | ELGIN M. ROWLAND |
415 PLB UNDERGROUND | PARTIAL | 3/22/2022 | CHRIS BABCOCK |
321 DIAPRAGM FLOOR | PASS | 3/30/2022 | CHRIS BABCOCK |
321 DIAPRAGM FLOOR | NO INSPECTION | 4/1/2022 | ELGIN M. ROWLAND |
323 DIAPRAGM ROOF | PASS | 4/20/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | PASS | 4/21/2022 | CHRIS BABCOCK |
321 DIAPRAGM FLOOR | PASS | 4/22/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | PARTIAL | 4/26/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | PARTIAL | 4/26/2022 | CHRIS BABCOCK |
340 SHEAR & DIAPRAGM | PASS | 4/28/2022 | CHRIS BABCOCK |
321 DIAPRAGM FLOOR | PASS | 4/29/2022 | CHRIS BABCOCK |
323 DIAPRAGM ROOF | PASS | 5/2/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | PASS | 5/2/2022 | CHRIS BABCOCK |
340 SHEAR & DIAPRAGM | NOT READY | 5/3/2022 | CHRIS BABCOCK |
340 SHEAR & DIAPRAGM | PARTIAL | 5/4/2022 | CHRIS BABCOCK |
705 WALL BOARD | PASS | 5/5/2022 | CHRIS BABCOCK |
323 DIAPRAGM ROOF | PASS | 5/5/2022 | CHRIS BABCOCK |
710 WALL BOARD | PARTIAL | 5/10/2022 | CHRIS BABCOCK |
340 SHEAR & DIAPRAGM | PASS | 5/10/2022 | CHRIS BABCOCK |
323 DIAPRAGM ROOF | PASS | 5/10/2022 | CHRIS BABCOCK |
340 SHEAR & DIAPRAGM | PASS | 5/13/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | NO INSPECTION | 5/16/2022 | BING COSBY |
323 DIAPRAGM ROOF | PARTIAL | 5/23/2022 | MICHAEL TROSTRUD |
425 PLUMB ROUGH | PASS | 5/23/2022 | MICHAEL TROSTRUD |
323 DIAPRAGM ROOF | PASS | 5/23/2022 | MICHAEL TROSTRUD |
323 DIAPRAGM ROOF | FAILED | 5/24/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | PASS | 5/24/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | PASS | 5/24/2022 | CHRIS BABCOCK |
322 DIAPRAGM SHEAR | | 5/26/2022 | |
425 PLUMB ROUGH | PASS | 5/27/2022 | CHRIS BABCOCK |
425 PLUMB ROUGH | FAILED | 5/31/2022 | CHRIS BABCOCK |
710 WALL BOARD | PASS | 6/15/2022 | MICHAEL TROSTRUD |
323 DIAPRAGM ROOF | FAILED | 5/11/2022 | CHRIS BABCOCK |
323 DIAPRAGM ROOF | PASS | 5/11/2022 | CHRIS BABCOCK |
995 FIRE | NOT READY | 10/28/2021 | TIMOTHY HUERTA |
FIRE LUMBER DROP | PASS | 1/31/2022 | TIMOTHY HUERTA |
120 FOOTINGS | NO INSPECTION | 9/22/2021 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | NO INSPECTION | 10/8/2021 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | PARTIAL | 10/14/2021 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | PARTIAL | 10/22/2021 | CHRIS BABCOCK |
495 PLB UNDERGROUND | PASS | 10/28/2021 | BING COSBY |
505 ELEC UNDERGROUND | PASS | 10/28/2021 | BING COSBY |
505 ELEC UNDERGROUND | PASS | 1/21/2022 | MARK WILLIAMS |
250 CONCRETE SLAB | FAILED | 1/31/2022 | CHRIS BABCOCK |
250 CONCRETE SLAB | | 2/1/2022 | |
410 PLB UNDERGROUND | PASS | 2/2/2022 | CHRIS BABCOCK |
321 DIAPRAGM FLOOR | NOT READY | 3/2/2022 | CHRIS BABCOCK |
321 DIAPRAGM FLOOR | PARTIAL | 4/4/2022 | ELGIN M. ROWLAND |
505 ELEC UNDERGROUND | PARTIAL | 10/11/2021 | CHRIS BABCOCK |
505 ELEC UNDERGROUND | PARTIAL | 10/21/2021 | CHRIS BABCOCK |
|
|
Fees:
|
RE-INSPECTION | $238.00 | 2162996 | 07/11/2023 |
TEMP CERT OF OCCUPANCY- INSP | $399.85 | 2160821 | 07/07/2023 |
TEMP CERT OF OCCUPANCY-PLAN CHK | $31.84 | 2162996 | 07/11/2023 |
INSPECTION (JAB) | $0.00 | | |
TEMPORARY METER RELEASE INSPECTION | $267.69 | 2070348 | 02/10/2023 |
TEMP METER RELEASE PLAN REVIEW | $31.84 | 2070348 | 02/10/2023 |
TEMPORARY METER RELEASE INSPECTION | $267.69 | 2096363 | 03/24/2023 |
TEMP METER RELEASE PLAN REVIEW | $31.84 | 2096363 | 03/24/2023 |
HOURLY PLAN REVIEW FEE | $213.79 | 1935459 | 07/12/2022 |
HOURLY PLAN REVIEW FEE | $213.79 | 2098787 | 03/29/2023 |
RESUBMITTAL | $251.00 | 1900776 | 05/23/2022 |
RESUBMITTAL | $251.00 | 1900776 | 05/23/2022 |
TEMP CERT OF OCC INSP-EA ADD 30 DAYS | $223.63 | 2178821 | 08/07/2023 |
TEMP CERT OF OCC-EA ADD 30 DAYS PLAN CHK | $31.84 | 2178821 | 08/07/2023 |
BLD-CERTIFICATE OF OCCUPANCY | $40.00 | 2181714 | 08/10/2023 |
WTR- PLAN CHECK COMM W/INT | $3,135.97 | 1573122 | 01/25/2021 |
NEW COMMERCIAL BLDG PLAN CHECK | $20,906.47 | 1573122 | 01/25/2021 |
FIRE PLAN CHECK -COMM W/INT | $4,181.29 | 1573122 | 01/25/2021 |
PLN-REVIEW OF BUILDING PERMIT | $158.00 | 1573122 | 01/25/2021 |
RESUBMITTAL | $222.00 | 1729944 | 09/03/2021 |
RE-INSPECTION | $206.00 | 1823366 | 01/27/2022 |
RE-INSPECTION | $238.00 | 2180297 | 08/08/2023 |
COMMERCIAL SMIP | $14,028.00 | 1729944 | 09/03/2021 |
FIRE INSPECT- COMM W/INT | $6,704.71 | 1729944 | 09/03/2021 |
GENERAL PLAN SURCHARGE | $3,352.36 | 1729944 | 09/03/2021 |
NEW COMMERCIAL BLDG PERMIT | $33,523.57 | 1729944 | 09/03/2021 |
PERMIT IMAGING SURCHARGE | $5.00 | 1729944 | 09/03/2021 |
PERMIT TECHNOLOGY SURCHARGE | $670.47 | 1729944 | 09/03/2021 |
PLAN CHECK TECHNOLOGY SURCHARGE | $302.31 | 1729944 | 09/03/2021 |
PLANS IMAGING SURCHARGE | $0.00 | 1729944 | 09/03/2021 |
SB 1473 GREEN TAX | $2,000.00 | 1729944 | 09/03/2021 |
PUBLIC FACILITY RESIDENTIAL | $269,963.00 | 1729944 | 09/03/2021 |
PARK - RESIDENTIAL ONLY | $456,393.00 | 1729944 | 09/03/2021 |
PUBLIC FACILITY NON-RESIDENTIAL | $130,152.29 | 1729944 | 09/03/2021 |
HOURLY PLAN REVIEW FEE | $427.58 | 1724105 | 08/27/2021 |
HOURLY PLAN REVIEW FEE | $213.79 | 1874931 | 04/11/2022 |
|
|
|
TOTAL FEES:
|
$949,277.61
|
TOTAL FEES PAID:
|
$949,277.61
|
TOTAL FEES DUE:
|
$0.00
|
|
|
|