CITY OF OCEANSIDE
DEVELOPMENT SERVICES

300 N COAST HIGHWAY, City of Oceanside CA 92054
BUILDING INSPECTIONS (760) 435-3925
Applied Date:  1/19/2021
Expiration Date: 
Permit No:  BLDG21-0217
Permit Type:  BLD COMMERCIAL NEW
Site Address:  4000 MISSION AVE OCEANSIDE, CA 92058 Site APN:  1580651100
Subdivision:  MISSION LANDS OF SAN LUIS REY Site Block: 
Site Lot:  Valuation:  $50,000,000.00
Site Tract:  Permit Status:  FINALED

Description of Work:
NEW CONSTRUCTION OF 3 STORY ASSISTED LIVING/MEMORY CARE 213,
 
Contractor: W E O'NEIL CONSTRUCTION CO OF SAN DIEGO
Address: 11633 SORRENTO VALLEY RD
SAN DIEGO CA 92121
Phone: (858) 926-4087
Technical Information:
CaptionValue
PLAN ID # 
PERMIT # 
BIN # 
FIRE SPRINKLER1
FLOOD ZONE 
REDEV AREA 
COASTAL ZONE 
OCC GROUPR2.1
SAND OIL INTRCPTR 
TYPE CONSTVA
OCC LOAD2311
UNITS213
EXISTING BLDG SF 
STATE CODE EDITION2019
GREASE INTRCPTR 
BLDG SF180280
NO STORIES0
ELECTRIC RELEASED BY 
NOTIFIED SDGE BY 
DATE ELECTRIC RELEASED12:00:00 AM
ELECTRIC RELEASE TYPE 
TYPE OF BUILDING 
GAS RELEASED BY 
NOTIFIED SDGE BY 
DATE GAS RELEASED12:00:00 AM
GAS RELEASE TYPE 
WDID # 
 
Owner:  OLD MISSION SAN LUIS REY
Address:  4050 MISSION AVE
SAN LUIS REY CA 92057
Phone:  
 
 
WORKERS COMPENSATION DECLARATION
WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES.
I hereby affirm under penalty of perjury one of the following declarations:
____ I have and will maintain a certificate of consent to self-insure for workers' compensation, issued by the Director of Industrial Relations as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued.
Policy No. 
____ I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are:
Carrier:       Policy Number:       Expiration Date: 
____ I certify that, in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that, if I should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those provisions.
LICENSED CONTRACTOR'S DECLARATION
I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and my license is in full force and effect.
License No:    Expiration Date:    Contractor:    Class: 
Inspections:
TypeResultDateInspector
340 SHEAR & DIAPRAGMNO INSPECTION5/17/2022BING COSBY
323 DIAPRAGM ROOFPASS5/17/2022BING COSBY
425 PLUMB ROUGHPASS5/20/2022MICHAEL TROSTRUD
525 ELECT ROUGHPASS5/20/2022MICHAEL TROSTRUD
705 WALL BOARDPASS5/20/2022MICHAEL TROSTRUD
322 DIAPRAGM SHEARPASS7/12/2022CHRIS BABCOCK
340 SHEAR & DIAPRAGMPASS7/12/2022CHRIS BABCOCK
900 FIRE FINALPASS8/9/2023RON OWENS
50 PRECONPASS3/14/2022CHRIS BABCOCK
120 FOOTINGS   
415 PLB UNDERGROUNDNO INSPECTION10/29/2021BING COSBY
505 ELEC UNDERGROUND   
415 PLB UNDERGROUND   
505 ELEC UNDERGROUNDPASS10/29/2021BING COSBY
330 SHEAR & DIAPRAGMPARTIAL4/6/2022ELGIN M. ROWLAND
455 MECH ROUGHNO INSPECTION5/26/2022CHRIS BABCOCK
525 ELECT ROUGHNO INSPECTION11/9/2021BING COSBY
620 INSULATION   
715 WALL BOARDCORRECTIONS3/15/2022CHRIS BABCOCK
740 LATH   
750 T BAR CEILING   
490 GAS TEST   
555 METER RELEASE   
900 FIRE FINALPARTIAL7/10/2023RANDY HILL
50 PRECON   
323 DIAPRAGM ROOFPASS5/26/2022CHRIS BABCOCK
425 PLUMB ROUGH   
991 LANDSCAPING   
992 STREET LIGHTING   
993 ENGINEERING   
996 WATER UTILITIES   
997 PLANNING   
**910 FINAL MULTI   
410 PLB UNDERGROUNDNOT READY11/2/2021CHRIS BABCOCK
505 ELEC UNDERGROUNDPASS11/2/2021CHRIS BABCOCK
505 ELEC UNDERGROUNDNOT READY11/3/2021CHRIS BABCOCK
410 PLB UNDERGROUNDNOT READY11/4/2021CHRIS BABCOCK
505 ELEC UNDERGROUNDNOT READY11/4/2021CHRIS BABCOCK
410 PLB UNDERGROUNDPASS11/8/2021BING COSBY
505 ELEC UNDERGROUNDNOT READY11/8/2021BING COSBY
505 ELEC UNDERGROUNDPASS11/9/2021BING COSBY
505 ELEC UNDERGROUNDPASS11/15/2021CHRIS BABCOCK
410 PLB UNDERGROUNDPARTIAL11/16/2021CHRIS BABCOCK
105 FOOTINGSPARTIAL11/16/2021CHRIS BABCOCK
250 CONCRETE SLABPASS11/16/2021CHRIS BABCOCK
505 ELEC UNDERGROUNDPASS11/17/2021CHRIS BABCOCK
105 FOOTINGSPASS11/17/2021CHRIS BABCOCK
505 ELEC UNDERGROUNDPASS11/19/2021CHRIS BABCOCK
410 PLB UNDERGROUNDPASS11/22/2021BING COSBY
410 PLB UNDERGROUNDPASS11/23/2021BING COSBY
410 PLB UNDERGROUNDPASS11/29/2021CHRIS BABCOCK
250 CONCRETE SLABPARTIAL11/30/2021CHRIS BABCOCK
105 FOOTINGSPARTIAL11/30/2021CHRIS BABCOCK
410 PLB UNDERGROUNDNOT READY12/2/2021CHRIS BABCOCK
410 PLB UNDERGROUNDPASS12/3/2021CHRIS BABCOCK
250 CONCRETE SLABPARTIAL12/6/2021CHRIS BABCOCK
105 FOOTINGSPASS12/7/2021CHRIS BABCOCK
250 CONCRETE SLABPASS12/8/2021BING COSBY
410 PLB UNDERGROUNDPASS12/8/2021BING COSBY
505 ELEC UNDERGROUNDPASS12/9/2021CHRIS BABCOCK
250 CONCRETE SLABCORRECTIONS12/9/2021CHRIS BABCOCK
505 ELEC UNDERGROUNDPASS12/10/2021BING COSBY
820 POOL PLUMBING 12/10/2021 
822 POOL ELECTRIC 12/10/2021 
250 CONCRETE SLABPASS12/13/2021CHRIS BABCOCK
505 ELEC UNDERGROUNDPASS12/13/2021CHRIS BABCOCK
250 CONCRETE SLABPARTIAL12/17/2021CHRIS BABCOCK
505 ELEC UNDERGROUNDPASS12/17/2021CHRIS BABCOCK
115 FOOTINGSPASS12/20/2021CHRIS BABCOCK
505 ELEC UNDERGROUNDPASS12/21/2021CHRIS BABCOCK
824 POOL STEEL 12/21/2021 
505 ELEC UNDERGROUNDNO INSPECTION12/22/2021CHRIS BABCOCK
250 CONCRETE SLABPASS1/5/2022MICHAEL TROSTRUD
505 ELEC UNDERGROUNDPASS1/5/2022MICHAEL TROSTRUD
505 ELEC UNDERGROUNDPASS1/6/2022CHRIS BABCOCK
105 FOOTINGSPASS1/11/2022CHRIS BABCOCK
250 CONCRETE SLABNOT READY1/13/2022CHRIS BABCOCK
505 ELEC UNDERGROUNDNOT READY1/13/2022CHRIS BABCOCK
250 CONCRETE SLABPARTIAL1/14/2022CHRIS BABCOCK
505 ELEC UNDERGROUNDPASS1/24/2022MARK WILLIAMS
250 CONCRETE SLABPASS1/24/2022MARK WILLIAMS
250 CONCRETE SLABPARTIAL1/31/2022CHRIS BABCOCK
250 CONCRETE SLABPASS2/1/2022CHRIS BABCOCK
250 CONCRETE SLABPASS2/2/2022CHRIS BABCOCK
505 ELEC UNDERGROUNDPASS2/4/2022CHRIS BABCOCK
250 CONCRETE SLAB   
322 DIAPRAGM SHEARNOT READY2/16/2022CHRIS BABCOCK
321 DIAPRAGM FLOORNO INSPECTION2/21/2022ELGIN M. ROWLAND
323 DIAPRAGM ROOFNO INSPECTION2/23/2022CHRIS BABCOCK
705 WALL BOARDPASS6/3/2022CHRIS BABCOCK
340 SHEAR & DIAPRAGMNOT READY6/3/2022CHRIS BABCOCK
321 DIAPRAGM FLOORPASS6/3/2022CHRIS BABCOCK
425 PLUMB ROUGHNOT READY6/3/2022CHRIS BABCOCK
323 DIAPRAGM ROOFPARTIAL6/3/2022CHRIS BABCOCK
425 PLUMB ROUGHPARTIAL6/8/2022CHRIS BABCOCK
323 DIAPRAGM ROOFNOT READY6/9/2022CHRIS BABCOCK
425 PLUMB ROUGHPASS6/9/2022CHRIS BABCOCK
322 DIAPRAGM SHEARPASS6/9/2022CHRIS BABCOCK
705 WALL BOARDPASS6/15/2022MICHAEL TROSTRUD
525 ELECT ROUGHPASS6/16/2022CHRIS BABCOCK
340 SHEAR & DIAPRAGMPARTIAL6/21/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS6/23/2022CHRIS BABCOCK
705 WALL BOARDPASS6/23/2022CHRIS BABCOCK
323 DIAPRAGM ROOFNOT READY7/1/2022CHRIS BABCOCK
322 DIAPRAGM SHEARNOT READY7/20/2022CHRIS BABCOCK
730 LATHPASS8/3/2022CHRIS BABCOCK
323 DIAPRAGM ROOFPASS8/5/2022CHRIS BABCOCK
322 DIAPRAGM SHEARFAILED8/8/2022CHRIS BABCOCK
321 DIAPRAGM FLOORNOT READY9/2/2022CHRIS BABCOCK
322 DIAPRAGM SHEARPASS9/19/2022CHRIS BABCOCK
105 FOOTINGSFAILED9/22/2022CHRIS BABCOCK
705 WALL BOARDFAILED9/29/2022CHRIS BABCOCK
321 DIAPRAGM FLOORNOT READY10/3/2022CHRIS BABCOCK
730 LATHPASS10/4/2022CHRIS BABCOCK
323 DIAPRAGM ROOFNOT READY10/5/2022CHRIS BABCOCK
323 DIAPRAGM ROOFPASS10/7/2022CHRIS BABCOCK
322 DIAPRAGM SHEARPASS10/10/2022CHRIS BABCOCK
705 WALL BOARDPASS10/11/2022CHRIS BABCOCK
**905 FINAL SFR 10/25/2022 
730 LATHFAILED10/25/2022CHRIS BABCOCK
505 ELEC UNDERGROUNDNOT READY1/23/2023CHRIS BABCOCK
**905 FINAL SFR 1/27/2023 
505 ELEC UNDERGROUNDPASS1/27/2023CHRIS BABCOCK
705 WALL BOARDPASS3/8/2023CHRIS BABCOCK
750 T BAR CEILINGPASS3/22/2023CHRIS BABCOCK
530 ELECT ROUGHPASS4/5/2023CHRIS BABCOCK
505 ELEC UNDERGROUNDPASS3/23/2022CHRIS BABCOCK
120 FOOTINGSPASS3/24/2022CHRIS BABCOCK
715 WALL BOARDFAILED3/24/2022CHRIS BABCOCK
705 WALL BOARDNOT READY3/25/2022CHRIS BABCOCK
105 FOOTINGSPASS3/28/2022CHRIS BABCOCK
321 DIAPRAGM FLOORNO INSPECTION3/28/2022CHRIS BABCOCK
330 SHEAR & DIAPRAGMPARTIAL4/5/2022ELGIN M. ROWLAND
210 CMU REBARNOT READY4/4/2022ELGIN M. ROWLAND
321 DIAPRAGM FLOORPASS4/8/2022CHRIS BABCOCK
PRECONPASS4/8/2022CHRIS BABCOCK
330 SHEAR & DIAPRAGMFAILED4/12/2022CHRIS BABCOCK
323 DIAPRAGM ROOFPASS4/13/2022CHRIS BABCOCK
323 DIAPRAGM ROOFPARTIAL4/15/2022CHRIS BABCOCK
330 SHEAR & DIAPRAGMPARTIAL4/18/2022CHRIS BABCOCK
505 ELEC UNDERGROUNDPASS11/29/2021CHRIS BABCOCK
505 ELEC UNDERGROUNDPASS12/3/2021CHRIS BABCOCK
250 CONCRETE SLABPASS12/21/2021CHRIS BABCOCK
250 CONCRETE SLABPASS1/6/2022CHRIS BABCOCK
505 ELEC UNDERGROUNDNO INSPECTION1/18/2022CHRIS BABCOCK
250 CONCRETE SLABPARTIAL1/19/2022MARK WILLIAMS
250 CONCRETE SLABPASS W/CONDITIONS1/20/2022MARK WILLIAMS
505 ELEC UNDERGROUNDFAILED1/20/2022MARK WILLIAMS
250 CONCRETE SLAB   
250 CONCRETE SLAB 6/1/2022 
250 CONCRETE SLAB 2/1/2022 
250 CONCRETE SLABPASS2/1/2022CHRIS BABCOCK
250 CONCRETE SLABCORRECTIONS2/1/2022CHRIS BABCOCK
505 ELEC UNDERGROUNDPASS2/1/2022CHRIS BABCOCK
250 CONCRETE SLAB 2/3/2022 
505 ELEC UNDERGROUNDNOT READY2/2/2022CHRIS BABCOCK
250 CONCRETE SLABPARTIAL2/3/2022CHRIS BABCOCK
505 ELEC UNDERGROUNDPASS2/3/2022CHRIS BABCOCK
250 CONCRETE SLABPARTIAL2/8/2022CHRIS BABCOCK
250 CONCRETE SLABPASS2/10/2022CHRIS BABCOCK
250 CONCRETE SLABCORRECTIONS2/9/2022CHRIS BABCOCK
315 FRAMEPARTIAL2/15/2022CHRIS BABCOCK
315 FRAMEPASS2/17/2022CHRIS BABCOCK
321 DIAPRAGM FLOORPASS3/8/2022CHRIS BABCOCK
321 DIAPRAGM FLOORPASS2/24/2022CHRIS BABCOCK
322 DIAPRAGM SHEARPASS5/27/2022CHRIS BABCOCK
321 DIAPRAGM FLOORNOT READY5/27/2022CHRIS BABCOCK
322 DIAPRAGM SHEARPASS6/1/2022CHRIS BABCOCK
323 DIAPRAGM ROOFNOT READY6/1/2022CHRIS BABCOCK
705 WALL BOARDPASS6/1/2022CHRIS BABCOCK
425 PLUMB ROUGHPASS6/1/2022CHRIS BABCOCK
605 INSULATIONNOT READY6/1/2022CHRIS BABCOCK
250 CONCRETE SLABPASS6/1/2022CHRIS BABCOCK
425 PLUMB ROUGHPASS6/7/2022CHRIS BABCOCK
323 DIAPRAGM ROOFCORRECTIONS6/7/2022CHRIS BABCOCK
322 DIAPRAGM SHEARNOT READY6/7/2022CHRIS BABCOCK
705 WALL BOARDPASS6/7/2022CHRIS BABCOCK
323 DIAPRAGM ROOFPASS6/8/2022CHRIS BABCOCK
322 DIAPRAGM SHEARNOT READY6/8/2022CHRIS BABCOCK
705 WALL BOARDPASS6/8/2022CHRIS BABCOCK
455 MECHANICAL ROUGHPARTIAL6/8/2022CHRIS BABCOCK
525 ELECT ROUGHPARTIAL6/8/2022CHRIS BABCOCK
425 PLUMB ROUGH 6/9/2022 
323 DIAPRAGM ROOF6/10/2022CHRIS BABCOCK
605 INSULATIONPASS6/10/2022CHRIS BABCOCK
705 WALL BOARDPASS6/10/2022CHRIS BABCOCK
425 PLUMB ROUGHPASS6/13/2022CHRIS BABCOCK
322 DIAPRAGM SHEARPASS6/13/2022CHRIS BABCOCK
322 DIAPRAGM SHEARPASS6/15/2022MICHAEL TROSTRUD
730 LATHPASS6/16/2022CHRIS BABCOCK
710 WALL BOARDPASS6/16/2022CHRIS BABCOCK
425 PLUMB ROUGHPASS6/16/2022CHRIS BABCOCK
322 DIAPRAGM SHEARFAILED6/17/2022CHRIS BABCOCK
425 PLUMB ROUGHPASS6/17/2022CHRIS BABCOCK
605 INSULATIONPASS6/17/2022CHRIS BABCOCK
705 WALL BOARDPASS6/21/2022CHRIS BABCOCK
425 PLUMB ROUGHNOT READY6/21/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)NOT READY6/21/2022CHRIS BABCOCK
525 ELECT ROUGHNOT READY6/21/2022CHRIS BABCOCK
425 PLUMB ROUGHNOT READY6/22/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS6/22/2022CHRIS BABCOCK
323 DIAPRAGM ROOFPASS6/22/2022CHRIS BABCOCK
425 PLUMB ROUGHNO INSPECTION6/23/2022CHRIS BABCOCK
605 INSULATIONPASS6/24/2022CHRIS BABCOCK
705 WALL BOARDPASS6/24/2022CHRIS BABCOCK
323 DIAPRAGM ROOFNO INSPECTION6/24/2022CHRIS BABCOCK
425 PLUMB ROUGHPASS6/24/2022CHRIS BABCOCK
710 WALL BOARD 6/24/2022 
323 DIAPRAGM ROOFNOT READY6/27/2022CHRIS BABCOCK
425 PLUMB ROUGHPASS6/27/2022CHRIS BABCOCK
605 INSULATIONPASS6/27/2022CHRIS BABCOCK
322 DIAPRAGM SHEARPASS6/29/2022CHRIS BABCOCK
730 LATHPASS6/29/2022CHRIS BABCOCK
605 INSULATIONPASS6/29/2022CHRIS BABCOCK
323 DIAPRAGM ROOFNOT READY6/29/2022CHRIS BABCOCK
705 WALL BOARDPASS6/29/2022CHRIS BABCOCK
322 DIAPRAGM SHEARPASS6/30/2022CHRIS BABCOCK
425 PLUMB ROUGHPASS7/1/2022CHRIS BABCOCK
485 GAS TESTNOT READY7/1/2022CHRIS BABCOCK
605 INSULATIONPASS7/1/2022CHRIS BABCOCK
705 WALL BOARDPASS7/1/2022CHRIS BABCOCK
340 SHEAR & DIAPRAGMPASS7/5/2022BING COSBY
310 FRAME (W/M.P.E)PASS7/5/2022BING COSBY
322 DIAPRAGM SHEARPASS7/6/2022BING COSBY
425 PLUMB ROUGHNO INSPECTION7/7/2022BING COSBY
322 DIAPRAGM SHEARNO INSPECTION7/7/2022BING COSBY
605 INSULATIONPASS7/7/2022BING COSBY
705 WALL BOARDPASS7/7/2022BING COSBY
322 DIAPRAGM SHEARPASS7/8/2022BING COSBY
705 WALL BOARDPASS7/8/2022BING COSBY
425 PLUMB ROUGHPASS7/8/2022BING COSBY
425 PLUMB ROUGHNOT READY7/11/2022CHRIS BABCOCK
705 WALL BOARDNOT READY7/11/2022CHRIS BABCOCK
322 DIAPRAGM SHEARPASS7/11/2022CHRIS BABCOCK
350 FRAMINGPASS7/11/2022CHRIS BABCOCK
323 DIAPRAGM ROOFPASS7/13/2022CHRIS BABCOCK
425 PLUMB ROUGHPASS7/13/2022CHRIS BABCOCK
605 INSULATIONPASS7/13/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS7/13/2022CHRIS BABCOCK
705 WALL BOARDPASS7/13/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS7/14/2022CHRIS BABCOCK
322 DIAPRAGM SHEARPASS7/14/2022CHRIS BABCOCK
425 PLUMB ROUGHPASS7/15/2022CHRIS BABCOCK
705 WALL BOARDPASS7/15/2022CHRIS BABCOCK
620 INSULATIONPASS7/15/2022CHRIS BABCOCK
**905 FINAL SFR 7/18/2022 
605 INSULATIONPASS7/18/2022CHRIS BABCOCK
705 WALL BOARDPASS7/18/2022CHRIS BABCOCK
340 SHEAR & DIAPRAGMPASS7/18/2022CHRIS BABCOCK
425 PLUMB ROUGHPASS7/18/2022CHRIS BABCOCK
322 DIAPRAGM SHEARNOT READY7/19/2022CHRIS BABCOCK
340 SHEAR & DIAPRAGMPASS7/19/2022CHRIS BABCOCK
**905 FINAL SFR 7/19/2022 
605 INSULATION 7/19/2022 
605 INSULATIONPASS7/19/2022CHRIS BABCOCK
525 ELECT ROUGHPASS7/21/2022CHRIS BABCOCK
425 PLUMB ROUGHPASS7/21/2022CHRIS BABCOCK
340 SHEAR & DIAPRAGMPASS7/21/2022CHRIS BABCOCK
605 INSULATIONPASS7/21/2022CHRIS BABCOCK
705 WALL BOARDPASS7/21/2022CHRIS BABCOCK
322 DIAPRAGM SHEARPASS7/25/2022BING COSBY
730 LATHPASS7/25/2022BING COSBY
425 PLUMB ROUGHPASS7/25/2022BING COSBY
455 MECHANICAL ROUGHPASS7/25/2022BING COSBY
525 ELECT ROUGHPASS7/25/2022BING COSBY
605 INSULATIONPASS7/25/2022BING COSBY
705 WALL BOARDPASS7/25/2022BING COSBY
705 WALL BOARDPASS7/25/2022BING COSBY
425 PLUMB ROUGHPASS7/28/2022MICHAEL TROSTRUD
705 WALL BOARDPASS7/28/2022MICHAEL TROSTRUD
605 INSULATIONPASS7/28/2022MICHAEL TROSTRUD
455 MECHANICAL ROUGHPASS7/28/2022MICHAEL TROSTRUD
730 LATHNOT READY7/29/2022CHRIS BABCOCK
340 SHEAR & DIAPRAGMPASS8/1/2022BING COSBY
730 LATHNOT READY8/1/2022BING COSBY
455 MECHANICAL ROUGHNOT READY8/1/2022BING COSBY
425 PLUMB ROUGHNOT READY8/1/2022BING COSBY
605 INSULATIONPASS8/1/2022BING COSBY
705 WALL BOARDPASS8/1/2022BING COSBY
730 LATHPASS8/2/2022CHRIS BABCOCK
620 INSULATIONPASS8/3/2022CHRIS BABCOCK
425 PLUMB ROUGHPASS8/3/2022CHRIS BABCOCK
705 WALL BOARDPASS8/3/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS8/4/2022CHRIS BABCOCK
605 INSULATIONPASS8/4/2022CHRIS BABCOCK
705 WALL BOARD 8/4/2022 
705 WALL BOARD 8/4/2022 
715 WALL BOARDPASS8/4/2022CHRIS BABCOCK
730 LATHNOT READY8/4/2022CHRIS BABCOCK
525 ELECT ROUGHPASS8/8/2022CHRIS BABCOCK
730 LATHPASS8/8/2022CHRIS BABCOCK
605 INSULATIONPASS8/8/2022CHRIS BABCOCK
705 WALL BOARDPASS8/8/2022CHRIS BABCOCK
323 DIAPRAGM ROOFFAILED8/8/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)NOT READY8/9/2022CHRIS BABCOCK
425 PLUMB ROUGHPASS8/9/2022CHRIS BABCOCK
323 DIAPRAGM ROOFFAILED8/9/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS8/10/2022BING COSBY
705 WALL BOARDNOT READY8/10/2022BING COSBY
322 DIAPRAGM SHEARPASS8/10/2022BING COSBY
605 INSULATIONNOT READY8/10/2022BING COSBY
310 FRAME (W/M.P.E)NO INSPECTION8/11/2022BING COSBY
605 INSULATIONPASS8/11/2022BING COSBY
705 WALL BOARDPASS8/11/2022BING COSBY
485 GAS TESTPASS8/11/2022BING COSBY
705 WALL BOARDPASS8/12/2022CHRIS BABCOCK
323 DIAPRAGM ROOFPASS8/12/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)NOT READY8/15/2022CHRIS BABCOCK
425 PLUMB ROUGHPASS8/15/2022CHRIS BABCOCK
350 FRAMINGPASS8/16/2022CHRIS BABCOCK
705 WALL BOARDPASS8/17/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS8/17/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS8/18/2022CHRIS BABCOCK
322 DIAPRAGM SHEARPASS8/18/2022CHRIS BABCOCK
525 ELECT ROUGHNO INSPECTION8/18/2022CHRIS BABCOCK
605 INSULATIONPASS8/18/2022CHRIS BABCOCK
425 PLUMB ROUGHNOT READY8/19/2022CHRIS BABCOCK
**905 FINAL SFRPARTIAL7/11/2023CHRIS BABCOCK
310 FRAME (W/M.P.E)NOT READY8/19/2022CHRIS BABCOCK
705 WALL BOARDPASS8/19/2022CHRIS BABCOCK
705 WALL BOARDPASS8/19/2022CHRIS BABCOCK
322 DIAPRAGM SHEARPARTIAL8/22/2022CHRIS BABCOCK
323 DIAPRAGM ROOFFAILED8/22/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS8/22/2022CHRIS BABCOCK
425 PLUMB ROUGHPASS8/22/2022CHRIS BABCOCK
605 INSULATIONPASS8/22/2022CHRIS BABCOCK
715 WALL BOARDPASS8/22/2022CHRIS BABCOCK
323 DIAPRAGM ROOFNOT READY8/23/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS8/23/2022CHRIS BABCOCK
605 INSULATIONPASS8/23/2022CHRIS BABCOCK
705 WALL BOARDPASS8/23/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS8/24/2022CHRIS BABCOCK
323 DIAPRAGM ROOFFAILED8/24/2022CHRIS BABCOCK
705 WALL BOARDPASS8/24/2022CHRIS BABCOCK
605 INSULATIONPASS8/24/2022CHRIS BABCOCK
425 PLUMB ROUGHNOT READY8/24/2022CHRIS BABCOCK
340 SHEAR & DIAPRAGMNOT READY8/25/2022CHRIS BABCOCK
315 FRAMEPASS8/25/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)NOT READY8/25/2022CHRIS BABCOCK
605 INSULATIONPASS8/25/2022CHRIS BABCOCK
705 WALL BOARDPASS8/25/2022CHRIS BABCOCK
323 DIAPRAGM ROOFNOT READY8/25/2022CHRIS BABCOCK
315 FRAMEPASS8/26/2022CHRIS BABCOCK
455 MECHANICAL ROUGHNOT READY8/26/2022CHRIS BABCOCK
605 INSULATIONPASS8/26/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)NOT READY8/29/2022CHRIS BABCOCK
322 DIAPRAGM SHEARPASS8/29/2022CHRIS BABCOCK
705 WALL BOARDPASS8/29/2022CHRIS BABCOCK
605 INSULATIONPASS8/29/2022CHRIS BABCOCK
322 DIAPRAGM SHEARFAILED8/30/2022CHRIS BABCOCK
525 ELECT ROUGHPASS8/30/2022CHRIS BABCOCK
705 WALL BOARDPASS8/30/2022CHRIS BABCOCK
605 INSULATIONPASS8/30/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)NOT READY8/30/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS8/31/2022CHRIS BABCOCK
425 PLUMB ROUGHPASS8/31/2022CHRIS BABCOCK
605 INSULATIONPASS8/31/2022CHRIS BABCOCK
705 WALL BOARDPASS8/31/2022CHRIS BABCOCK
210 CMU REBARPASS8/31/2022CHRIS BABCOCK
730 LATHPASS9/1/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)NO INSPECTION9/1/2022CHRIS BABCOCK
425 PLUMB ROUGHNOT READY9/1/2022CHRIS BABCOCK
705 WALL BOARDPASS9/1/2022CHRIS BABCOCK
322 DIAPRAGM SHEARPASS9/1/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS9/2/2022CHRIS BABCOCK
425 PLUMB ROUGHPASS9/2/2022CHRIS BABCOCK
705 WALL BOARDPASS9/2/2022CHRIS BABCOCK
455 MECHANICAL ROUGHPASS9/2/2022CHRIS BABCOCK
455 MECHANICAL ROUGHPASS9/7/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)NOT READY9/7/2022CHRIS BABCOCK
605 INSULATIONPASS9/7/2022CHRIS BABCOCK
705 WALL BOARDPASS9/7/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS9/9/2022CHRIS BABCOCK
**905 FINAL SFR   
705 WALL BOARDPASS9/9/2022CHRIS BABCOCK
605 INSULATIONPASS9/9/2022CHRIS BABCOCK
340 SHEAR & DIAPRAGMPASS9/9/2022CHRIS BABCOCK
425 PLUMB ROUGHNO INSPECTION9/9/2022CHRIS BABCOCK
730 LATHPASS9/12/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)NO INSPECTION9/12/2022CHRIS BABCOCK
605 INSULATIONPASS9/12/2022CHRIS BABCOCK
705 WALL BOARDPASS9/12/2022CHRIS BABCOCK
425 PLUMB ROUGHNO INSPECTION9/12/2022CHRIS BABCOCK
321 DIAPRAGM FLOORFAILED9/14/2022CHRIS BABCOCK
730 LATHPASS9/13/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS9/13/2022CHRIS BABCOCK
705 WALL BOARDNO INSPECTION9/13/2022CHRIS BABCOCK
425 PLUMB ROUGHPASS9/13/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)NOT READY9/14/2022CHRIS BABCOCK
605 INSULATIONPASS9/14/2022CHRIS BABCOCK
705 WALL BOARDPASS9/14/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS9/15/2022CHRIS BABCOCK
605 INSULATIONPASS9/15/2022CHRIS BABCOCK
705 WALL BOARDPASS9/15/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)NOT READY9/16/2022CHRIS BABCOCK
340 SHEAR & DIAPRAGMNOT READY9/16/2022CHRIS BABCOCK
605 INSULATIONNOT READY9/16/2022CHRIS BABCOCK
705 WALL BOARDPASS9/16/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS9/19/2022CHRIS BABCOCK
605 INSULATIONPASS9/19/2022CHRIS BABCOCK
705 WALL BOARDNOT READY9/19/2022CHRIS BABCOCK
705 WALL BOARDPASS9/20/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS9/20/2022CHRIS BABCOCK
323 DIAPRAGM ROOFPASS9/20/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS9/21/2022CHRIS BABCOCK
605 INSULATIONPASS9/21/2022CHRIS BABCOCK
705 WALL BOARDNO INSPECTION9/21/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS9/22/2022CHRIS BABCOCK
605 INSULATIONPASS9/22/2022CHRIS BABCOCK
705 WALL BOARDPASS9/22/2022CHRIS BABCOCK
605 INSULATIONPASS9/23/2022CHRIS BABCOCK
705 WALL BOARDNOT READY9/23/2022CHRIS BABCOCK
210 CMU REBARNOT READY9/23/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS9/23/2022CHRIS BABCOCK
425 PLUMB ROUGHPASS9/23/2022CHRIS BABCOCK
321 DIAPRAGM FLOORSAME DAY CANCEL9/26/2022CHRIS BABCOCK
210 CMU REBARSAME DAY CANCEL9/26/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)SAME DAY CANCEL9/26/2022CHRIS BABCOCK
605 INSULATIONSAME DAY CANCEL9/26/2022CHRIS BABCOCK
705 WALL BOARDSAME DAY CANCEL9/26/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS9/27/2022CHRIS BABCOCK
605 INSULATIONPASS9/27/2022CHRIS BABCOCK
705 WALL BOARDNOT READY9/27/2022CHRIS BABCOCK
322 DIAPHRAGM SHEARPASS9/28/2022CHRIS BABCOCK
730 LATHPASS9/28/2022CHRIS BABCOCK
705 WALL BOARDPASS9/28/2022CHRIS BABCOCK
620 INSULATIONPASS9/28/2022CHRIS BABCOCK
425 PLUMB ROUGHPASS9/28/2022CHRIS BABCOCK
340 SHEAR & DIAPRAGMPASS9/28/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)NO INSPECTION9/28/2022CHRIS BABCOCK
321 DIAPRAGM FLOORNOT READY9/29/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)NOT READY9/29/2022CHRIS BABCOCK
322 DIAPRAGM SHEARPASS9/29/2022CHRIS BABCOCK
455 MECHANICAL ROUGHNOT READY9/30/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PARTIAL9/30/2022CHRIS BABCOCK
322 DIAPRAGM SHEARNO INSPECTION9/30/2022CHRIS BABCOCK
605 INSULATIONPASS9/30/2022CHRIS BABCOCK
705 WALL BOARDPASS9/30/2022CHRIS BABCOCK
730 LATHFAILED10/3/2022CHRIS BABCOCK
323 DIAPRAGM ROOFNOT READY10/3/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PARTIAL10/3/2022CHRIS BABCOCK
455 MECHANICAL ROUGHNO INSPECTION10/6/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS10/5/2022CHRIS BABCOCK
505 ELEC UNDERGROUNDPASS10/5/2022CHRIS BABCOCK
705 WALL BOARDNOT READY10/5/2022CHRIS BABCOCK
605 INSULATIONPASS10/5/2022CHRIS BABCOCK
321 DIAPRAGM FLOORPASS10/5/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)FAILED10/6/2022CHRIS BABCOCK
322 DIAPRAGM SHEARPASS10/6/2022CHRIS BABCOCK
705 WALL BOARDPASS10/6/2022CHRIS BABCOCK
605 INSULATIONPASS10/6/2022CHRIS BABCOCK
505 ELEC UNDERGROUNDNO INSPECTION10/6/2022CHRIS BABCOCK
505 ELEC UNDERGROUNDPASS10/7/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)   
605 INSULATIONPASS10/7/2022CHRIS BABCOCK
705 WALL BOARDPASS10/7/2022CHRIS BABCOCK
425 PLUMB ROUGHNO INSPECTION10/10/2022CHRIS BABCOCK
425 PLUMB ROUGHPASS10/11/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS10/11/2022CHRIS BABCOCK
322 DIAPRAGM SHEARPASS10/11/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)   
505 ELEC UNDERGROUND   
705 WALL BOARD   
605 INSULATION   
310 FRAME (W/M.P.E)PASS10/13/2022CHRIS BABCOCK
322 DIAPRAGM SHEARNO INSPECTION10/13/2022CHRIS BABCOCK
455 MECHANICAL ROUGHPASS10/13/2022CHRIS BABCOCK
505 ELEC UNDERGROUNDPASS10/13/2022CHRIS BABCOCK
605 INSULATIONPASS10/13/2022CHRIS BABCOCK
105 FOOTINGSPASS10/18/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS10/14/2022CHRIS BABCOCK
505 ELEC UNDERGROUNDPASS10/18/2022CHRIS BABCOCK
322 DIAPRAGM SHEARNO INSPECTION10/14/2022CHRIS BABCOCK
605 INSULATIONPASS10/14/2022CHRIS BABCOCK
425 PLUMB ROUGHPASS10/14/2022CHRIS BABCOCK
505 ELEC UNDERGROUNDNOT READY10/17/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)FAILED10/17/2022CHRIS BABCOCK
605 INSULATIONPASS10/17/2022CHRIS BABCOCK
705 WALL BOARDPASS10/17/2022CHRIS BABCOCK
315 FRAMEFAILED10/18/2022CHRIS BABCOCK
605 INSULATIONNOT READY10/18/2022CHRIS BABCOCK
315 FRAMEFAILED10/19/2022CHRIS BABCOCK
605 INSULATIONPASS10/19/2022CHRIS BABCOCK
705 WALL BOARDPASS10/19/2022CHRIS BABCOCK
310 FRAME (W/M.P.E) 10/21/2022 
495 PLB UNDERGROUNDNOT READY10/21/2022CHRIS BABCOCK
315 FRAMEPASS10/21/2022CHRIS BABCOCK
455 MECHANICAL ROUGHPASS10/21/2022CHRIS BABCOCK
605 INSULATIONPASS10/21/2022CHRIS BABCOCK
705 WALL BOARDPASS10/21/2022CHRIS BABCOCK
705 WALL BOARDPASS10/24/2022CHRIS BABCOCK
605 INSULATIONPASS10/24/2022CHRIS BABCOCK
455 MECHANICAL ROUGHNOT READY10/24/2022CHRIS BABCOCK
455 MECHANICAL ROUGHNO INSPECTION10/25/2022CHRIS BABCOCK
505 ELEC UNDERGROUNDNO INSPECTION10/25/2022CHRIS BABCOCK
605 INSULATIONPASS10/25/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)NOT READY10/25/2022CHRIS BABCOCK
705 WALL BOARDPASS10/25/2022CHRIS BABCOCK
315 FRAMEPASS10/26/2022CHRIS BABCOCK
505 ELEC UNDERGROUNDNO INSPECTION10/26/2022CHRIS BABCOCK
310 FRAME (W/M.P.E) 10/26/2022 
705 WALL BOARDPASS10/26/2022CHRIS BABCOCK
605 INSULATIONPASS10/26/2022CHRIS BABCOCK
730 LATHNOT READY10/26/2022CHRIS BABCOCK
505 ELEC UNDERGROUNDPASS10/27/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS10/27/2022CHRIS BABCOCK
705 WALL BOARDNOT READY10/27/2022CHRIS BABCOCK
455 MECHANICAL ROUGHPASS10/27/2022CHRIS BABCOCK
605 INSULATIONPASS10/27/2022CHRIS BABCOCK
735 LATHPASS10/27/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)FAILED10/28/2022CHRIS BABCOCK
605 INSULATIONPASS10/28/2022CHRIS BABCOCK
705 WALL BOARDPASS10/28/2022CHRIS BABCOCK
322 DIAPRAGM SHEARNO INSPECTION10/28/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)NOT READY10/31/2022CHRIS BABCOCK
605 INSULATIONPASS10/31/2022CHRIS BABCOCK
705 WALL BOARDPASS10/31/2022CHRIS BABCOCK
705 WALL BOARDNOT READY11/1/2022CHRIS BABCOCK
605 INSULATIONPASS11/1/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS11/1/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS11/3/2022CHRIS BABCOCK
605 INSULATIONPASS11/3/2022CHRIS BABCOCK
705 WALL BOARDNOT READY11/3/2022CHRIS BABCOCK
705 WALL BOARDPASS11/7/2022BING COSBY
605 INSULATIONPASS11/7/2022BING COSBY
730 LATHPASS11/7/2022BING COSBY
705 WALL BOARDPASS11/10/2022BING COSBY
605 INSULATIONPASS11/10/2022BING COSBY
705 WALL BOARDPASS11/15/2022CHRIS BABCOCK
605 INSULATIONPASS11/15/2022CHRIS BABCOCK
425 PLUMB ROUGHNO INSPECTION11/15/2022CHRIS BABCOCK
323 DIAPRAGM ROOFPASS11/15/2022CHRIS BABCOCK
705 WALL BOARDPASS11/16/2022CHRIS BABCOCK
605 INSULATIONNOT READY11/16/2022CHRIS BABCOCK
115 FOOTINGSPASS11/16/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS11/16/2022CHRIS BABCOCK
425 PLUMB ROUGHPASS11/17/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS11/17/2022CHRIS BABCOCK
455 MECHANICAL ROUGHPASS11/17/2022CHRIS BABCOCK
605 INSULATIONPASS11/21/2022CHRIS BABCOCK
705 WALL BOARDPASS11/21/2022CHRIS BABCOCK
505 ELEC UNDERGROUNDPASS11/21/2022CHRIS BABCOCK
105 FOOTINGSPASS11/22/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)NOT READY11/22/2022CHRIS BABCOCK
605 INSULATIONNOT READY11/22/2022CHRIS BABCOCK
705 WALL BOARDNOT READY11/22/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)NOT READY11/23/2022CHRIS BABCOCK
105 FOOTINGSPASS11/23/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS11/28/2022CHRIS BABCOCK
605 INSULATIONPASS11/28/2022CHRIS BABCOCK
705 WALL BOARDPASS11/28/2022CHRIS BABCOCK
705 WALL BOARDPASS11/29/2022CHRIS BABCOCK
605 INSULATIONPASS11/29/2022CHRIS BABCOCK
705 WALL BOARDPASS11/30/2022CHRIS BABCOCK
605 INSULATIONPASS11/30/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS11/30/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)NO INSPECTION12/1/2022CHRIS BABCOCK
605 INSULATIONPASS12/1/2022CHRIS BABCOCK
705 WALL BOARDPASS12/1/2022CHRIS BABCOCK
105 FOOTINGSPASS12/2/2022CHRIS BABCOCK
605 INSULATIONPASS12/2/2022CHRIS BABCOCK
705 WALL BOARDPASS12/2/2022CHRIS BABCOCK
705 WALL BOARDNOT READY12/5/2022CHRIS BABCOCK
615 INSULATIONNOT READY12/5/2022CHRIS BABCOCK
210 CMU REBARPASS12/5/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)NO INSPECTION12/6/2022CHRIS BABCOCK
605 INSULATIONNO INSPECTION12/6/2022CHRIS BABCOCK
715 WALL BOARDNO INSPECTION12/6/2022CHRIS BABCOCK
105 FOOTINGSNOT READY12/7/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS12/7/2022CHRIS BABCOCK
605 INSULATIONPASS12/7/2022CHRIS BABCOCK
705 WALL BOARDPASS12/7/2022CHRIS BABCOCK
322 DIAPHRAGM SHEARFAILED12/8/2022CHRIS BABCOCK
505 ELEC UNDERGROUNDPASS12/8/2022CHRIS BABCOCK
620 INSULATIONPASS12/9/2022CHRIS BABCOCK
705 WALL BOARDPASS12/9/2022CHRIS BABCOCK
105 FOOTINGSPASS12/9/2022CHRIS BABCOCK
705 WALL BOARDNOT READY12/12/2022CHRIS BABCOCK
605 INSULATIONPASS12/12/2022CHRIS BABCOCK
705 WALL BOARDNOT READY12/13/2022CHRIS BABCOCK
620 INSULATIONNOT READY12/13/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS12/14/2022CHRIS BABCOCK
605 INSULATIONPASS12/14/2022CHRIS BABCOCK
710 WALL BOARDPASS12/14/2022CHRIS BABCOCK
605 INSULATIONPASS12/15/2022CHRIS BABCOCK
705 WALL BOARDPASS12/15/2022CHRIS BABCOCK
605 INSULATIONSAME DAY CANCEL12/16/2022CHRIS BABCOCK
705 WALL BOARDSAME DAY CANCEL12/16/2022CHRIS BABCOCK
605 INSULATIONPARTIAL12/19/2022DUSTIN STOTLER
705 WALL BOARDPASS12/19/2022DUSTIN STOTLER
705 WALL BOARDPARTIAL12/20/2022MICHAEL TROSTRUD
605 INSULATIONNOT READY12/20/2022MICHAEL TROSTRUD
605 INSULATIONPASS12/21/2022DUSTIN STOTLER
705 WALL BOARDPASS12/21/2022DUSTIN STOTLER
705 WALL BOARDPASS12/22/2022DUSTIN STOTLER
620 INSULATIONNO INSPECTION12/22/2022DUSTIN STOTLER
310 FRAME (W/M.P.E)PASS12/22/2022DUSTIN STOTLER
105 FOOTINGS   
105 FOOTINGSPASS12/27/2022CHRIS BABCOCK
210 CMU REBAR   
210 CMU REBARPASS12/27/2022CHRIS BABCOCK
705 WALL BOARDPASS12/27/2022CHRIS BABCOCK
605 INSULATIONPASS12/27/2022CHRIS BABCOCK
605 INSULATION   
310 FRAME (W/M.P.E)PASS1/3/2023DUSTIN STOTLER
605 INSULATIONPASS1/3/2023DUSTIN STOTLER
705 WALL BOARDPASS1/3/2023DUSTIN STOTLER
310 FRAME (W/M.P.E)PASS1/5/2023BING COSBY
605 INSULATIONPASS1/5/2023BING COSBY
705 WALL BOARDPASS1/5/2023BING COSBY
525 ELECT ROUGHPASS1/9/2023CHRIS BABCOCK
705 WALL BOARDPASS1/9/2023CHRIS BABCOCK
705 WALL BOARD   
605 INSULATIONPASS1/9/2023CHRIS BABCOCK
605 INSULATIONNO INSPECTION1/10/2023CHRIS BABCOCK
705 WALL BOARDNO INSPECTION1/10/2023CHRIS BABCOCK
605 INSULATIONPASS1/11/2023CHRIS BABCOCK
705 WALL BOARDPASS1/11/2023CHRIS BABCOCK
605 INSULATIONPASS1/12/2023CHRIS BABCOCK
705 WALL BOARDPASS1/12/2023CHRIS BABCOCK
425 PLUMB ROUGHPASS1/13/2023CHRIS BABCOCK
605 INSULATIONPASS1/13/2023CHRIS BABCOCK
705 WALL BOARDPASS1/13/2023CHRIS BABCOCK
705 WALL BOARDPASS1/17/2023CHRIS BABCOCK
605 INSULATIONPASS1/17/2023CHRIS BABCOCK
322 DIAPRAGM SHEARPASS1/19/2023CHRIS BABCOCK
605 INSULATIONNOT READY1/19/2023CHRIS BABCOCK
705 WALL BOARDNOT READY1/19/2023CHRIS BABCOCK
705 WALL BOARDNOT READY1/20/2023CHRIS BABCOCK
705 WALL BOARDPASS1/23/2023CHRIS BABCOCK
322 DIAPRAGM SHEARPASS1/25/2023CHRIS BABCOCK
750 T BAR CEILINGPARTIAL1/25/2023CHRIS BABCOCK
455 MECHANICAL ROUGHPARTIAL1/25/2023CHRIS BABCOCK
750 T BAR CEILING   
505 ELEC UNDERGROUND   
730 LATHPASS1/31/2023CHRIS BABCOCK
110 FOOTINGSPASS2/3/2023CHRIS BABCOCK
605 INSULATIONPASS2/3/2023CHRIS BABCOCK
705 WALL BOARDPASS2/3/2023CHRIS BABCOCK
505 ELEC UNDERGROUNDPASS2/3/2023CHRIS BABCOCK
750 T BAR CEILINGNOT READY2/3/2023CHRIS BABCOCK
455 MECHANICAL ROUGHPARTIAL2/7/2023CHRIS BABCOCK
210 CMU REBARNOT READY2/7/2023CHRIS BABCOCK
750 T BAR CEILINGPASS2/7/2023CHRIS BABCOCK
605 INSULATIONPASS2/7/2023CHRIS BABCOCK
705 WALL BOARDPASS2/7/2023CHRIS BABCOCK
505 ELEC UNDERGROUNDPASS2/8/2023CHRIS BABCOCK
605 INSULATIONPASS2/8/2023CHRIS BABCOCK
550 METER RELEASEPASS W/CONDITIONS2/9/2023CHRIS BABCOCK
605 INSULATIONPASS2/9/2023CHRIS BABCOCK
705 WALL BOARDPASS2/9/2023CHRIS BABCOCK
455 MECHANICAL ROUGHNO ENTRY2/13/2023DUSTIN STOTLER
310 FRAME (W/M.P.E)NO ENTRY2/13/2023DUSTIN STOTLER
705 WALL BOARDPASS2/13/2023DUSTIN STOTLER
550 METER RELEASEPARTIAL2/15/2023CHRIS BABCOCK
605 INSULATIONPASS2/14/2023DUSTIN STOTLER
310 FRAME (W/M.P.E)PASS2/14/2023DUSTIN STOTLER
110 FOOTINGSPASS2/15/2023CHRIS BABCOCK
310 FRAME (W/M.P.E)NOT READY2/15/2023CHRIS BABCOCK
705 WALL BOARDNO INSPECTION2/15/2023CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS2/16/2023CHRIS BABCOCK
550 METER RELEASEPARTIAL2/16/2023CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS2/17/2023CHRIS BABCOCK
505 ELEC UNDERGROUNDPASS2/17/2023CHRIS BABCOCK
550 METER RELEASEPARTIAL2/17/2023CHRIS BABCOCK
550 METER RELEASEPASS2/20/2023CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS2/20/2023CHRIS BABCOCK
525 ELECT ROUGHPASS2/21/2023CHRIS BABCOCK
550 METER RELEASEPASS2/21/2023CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS2/21/2023CHRIS BABCOCK
505 ELEC UNDERGROUNDPASS2/21/2023CHRIS BABCOCK
705 WALL BOARDPASS2/21/2023CHRIS BABCOCK
550 METER RELEASEPASS2/22/2023CHRIS BABCOCK
105 FOOTINGSNO INSPECTION2/22/2023CHRIS BABCOCK
605 INSULATIONPASS2/22/2023CHRIS BABCOCK
550 METER RELEASENOT READY2/23/2023CHRIS BABCOCK
750 T BAR CEILINGPARTIAL2/23/2023CHRIS BABCOCK
705 WALL BOARDPASS2/24/2023CHRIS BABCOCK
550 METER RELEASENOT READY2/24/2023CHRIS BABCOCK
705 WALL BOARDPASS2/24/2023CHRIS BABCOCK
705 WALL BOARDPASS2/27/2023DUSTIN STOTLER
705 WALL BOARD   
550 METER RELEASENO ENTRY2/27/2023DUSTIN STOTLER
455 MECHANICAL ROUGHPASS2/28/2023CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS2/28/2023CHRIS BABCOCK
550 METER RELEASENOT READY2/28/2023CHRIS BABCOCK
105 FOOTINGSCORRECTIONS3/2/2023DUSTIN STOTLER
455 MECHANICAL ROUGHPASS3/3/2023DUSTIN STOTLER
705 WALL BOARD 3/3/2023 
750 T BAR CEILINGNO INSPECTION3/6/2023CHRIS BABCOCK
455 MECHANICAL ROUGHPASS3/6/2023CHRIS BABCOCK
550 METER RELEASEPASS3/6/2023CHRIS BABCOCK
750 T BAR CEILING   
310 FRAME (W/M.P.E)FAILED3/7/2023CHRIS BABCOCK
550 METER RELEASENOT READY3/7/2023CHRIS BABCOCK
505 ELEC UNDERGROUNDPASS3/7/2023CHRIS BABCOCK
705 WALL BOARDPASS3/7/2023CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS3/8/2023CHRIS BABCOCK
824 POOL STEELPASS3/13/2023DUSTIN STOTLER
705 WALL BOARDPASS3/13/2023DUSTIN STOTLER
605 INSULATIONNO INSPECTION3/13/2023DUSTIN STOTLER
824 POOL STEELPASS3/13/2023DUSTIN STOTLER
705 WALL BOARDNO ENTRY3/15/2023DUSTIN STOTLER
455 MECHANICAL ROUGHPASS3/15/2023DUSTIN STOTLER
310 FRAME (W/M.P.E)PASS3/16/2023DUSTIN STOTLER
705 WALL BOARDPASS3/16/2023DUSTIN STOTLER
525 ELECT ROUGHPASS3/16/2023DUSTIN STOTLER
705 WALL BOARDPASS3/17/2023DUSTIN STOTLER
310 FRAME (W/M.P.E)PASS3/17/2023DUSTIN STOTLER
730 LATHNO INSPECTION3/20/2023CHRIS BABCOCK
705 WALL BOARDNO INSPECTION3/20/2023CHRIS BABCOCK
705 WALL BOARDPASS3/22/2023CHRIS BABCOCK
730 LATHPASS3/22/2023CHRIS BABCOCK
105 FOOTINGSNOT READY3/23/2023CHRIS BABCOCK
705 WALL BOARDPASS3/23/2023CHRIS BABCOCK
550 METER RELEASEPASS3/24/2023CHRIS BABCOCK
550 METER RELEASEPASS3/27/2023CHRIS BABCOCK
705 WALL BOARDPASS3/27/2023CHRIS BABCOCK
705 WALL BOARDSAME DAY CANCEL3/28/2023DUSTIN STOTLER
550 METER RELEASESAME DAY CANCEL3/28/2023DUSTIN STOTLER
730 LATHPASS3/30/2023CHRIS BABCOCK
550 METER RELEASEPASS3/30/2023CHRIS BABCOCK
705 WALL BOARDPASS4/4/2023CHRIS BABCOCK
530 ELECT ROUGHNOT READY4/4/2023CHRIS BABCOCK
525 ELECT ROUGHPASS4/6/2023CHRIS BABCOCK
710 WALL BOARDNOT READY4/6/2023CHRIS BABCOCK
525 ELECT ROUGHPASS4/7/2023CHRIS BABCOCK
705 WALL BOARDPASS4/7/2023CHRIS BABCOCK
525 ELECT ROUGHPASS4/10/2023DUSTIN STOTLER
310 FRAME (W/M.P.E)PASS4/10/2023DUSTIN STOTLER
705 WALL BOARDPASS4/10/2023DUSTIN STOTLER
750 T BAR CEILINGPASS4/11/2023CHRIS BABCOCK
310 FRAME (W/M.P.E)NOT READY4/11/2023CHRIS BABCOCK
705 WALL BOARDNOT READY4/11/2023CHRIS BABCOCK
105 FOOTINGSNO INSPECTION4/11/2023CHRIS BABCOCK
750 T BAR CEILINGPASS4/12/2023CHRIS BABCOCK
105 FOOTINGS   
705 WALL BOARDNOT READY4/13/2023CHRIS BABCOCK
315 FRAMEPASS4/14/2023CHRIS BABCOCK
705 WALL BOARDPASS4/14/2023CHRIS BABCOCK
750 T BAR CEILINGPASS4/14/2023CHRIS BABCOCK
705 WALL BOARDNOT READY4/18/2023CHRIS BABCOCK
**920E FINALPARTIAL4/18/2023CHRIS BABCOCK
**920E FINALPARTIAL4/19/2023CHRIS BABCOCK
**920E FINALPARTIAL4/20/2023CHRIS BABCOCK
**920E FINALPARTIAL4/21/2023CHRIS BABCOCK
750 T BAR CEILINGPASS4/21/2023CHRIS BABCOCK
**920E FINALNOT READY4/24/2023DUSTIN STOTLER
705 WALL BOARDPASS4/24/2023DUSTIN STOTLER
750 T BAR CEILINGPASS4/24/2023DUSTIN STOTLER
**920E FINALFAILED4/26/2023CHRIS BABCOCK
750 T BAR CEILINGPASS4/28/2023CHRIS BABCOCK
**905 FINAL SFR 5/1/2023 
**920E FINALPARTIAL5/1/2023CHRIS BABCOCK
750 T BAR CEILINGPASS5/2/2023CHRIS BABCOCK
**920E FINALPARTIAL5/3/2023CHRIS BABCOCK
525 ELECT ROUGHPASS5/3/2023CHRIS BABCOCK
750 T BAR CEILINGNOT READY5/3/2023CHRIS BABCOCK
**920E FINALPARTIAL5/4/2023CHRIS BABCOCK
705 WALL BOARDNO INSPECTION5/9/2023BING COSBY
**920E FINALNO INSPECTION5/9/2023BING COSBY
750 T BAR CEILINGPARTIAL5/10/2023BING COSBY
**920E FINALPARTIAL5/15/2023CHRIS BABCOCK
750 T BAR CEILINGPASS5/15/2023CHRIS BABCOCK
**920E FINALNOT READY5/16/2023CHRIS BABCOCK
505 ELEC UNDERGROUNDPASS5/19/2023CHRIS BABCOCK
750 T BAR CEILINGPASS5/19/2023CHRIS BABCOCK
**920E FINALPARTIAL5/19/2023CHRIS BABCOCK
**920E FINALPARTIAL5/26/2023CHRIS BABCOCK
750 T BAR CEILINGNOT READY5/26/2023CHRIS BABCOCK
**920E FINALNOT READY5/31/2023DUSTIN STOTLER
750 T BAR CEILINGPARTIAL5/31/2023DUSTIN STOTLER
**920E FINALNOT READY6/1/2023CHRIS BABCOCK
750 T BAR CEILINGFAILED6/1/2023CHRIS BABCOCK
**920E FINALPARTIAL6/2/2023CHRIS BABCOCK
**920E FINALPARTIAL6/6/2023CHRIS BABCOCK
**920E FINALPARTIAL6/7/2023CHRIS BABCOCK
750 T BAR CEILINGNOT READY6/15/2023CHRIS BABCOCK
750 T BAR CEILINGPASS6/19/2023DUSTIN STOTLER
**920E FINALNOT READY6/28/2023MICHAEL TROSTRUD
**920E FINALPARTIAL6/30/2023CHRIS BABCOCK
822 POOL ELECTRICPASS6/30/2023CHRIS BABCOCK
**920E FINALNO ENTRY7/3/2023DUSTIN STOTLER
**920E FINALPARTIAL7/5/2023CHRIS BABCOCK
**920E FINALCORRECTIONS7/6/2023CHRIS BABCOCK
322 DIAPRAGM SHEARFAILED5/6/2022CHRIS BABCOCK
323 DIAPRAGM ROOFNO INSPECTION5/12/2022CHRIS BABCOCK
323 DIAPRAGM ROOFPASS5/19/2022BING COSBY
425 PLUMB ROUGHPASS5/19/2022BING COSBY
322 DIAPRAGM SHEARPASS5/26/2022CHRIS BABCOCK
105 FOOTINGS 9/20/2021 
410 PLB UNDERGROUNDPARTIAL10/25/2021CHRIS BABCOCK
321 DIAPRAGM FLOORPASS4/19/2022CHRIS BABCOCK
322 DIAPRAGM SHEARPASS4/19/2022CHRIS BABCOCK
322 DIAPRAGM SHEARPASS4/27/2022CHRIS BABCOCK
323 DIAPRAGM ROOFNOT READY4/27/2022CHRIS BABCOCK
323 DIAPRAGM ROOFPASS4/28/2022CHRIS BABCOCK
322 DIAPRAGM SHEARPASS5/2/2022CHRIS BABCOCK
705 WALL BOARDPASS5/2/2022CHRIS BABCOCK
322 DIAPRAGM SHEARPARTIAL5/12/2022CHRIS BABCOCK
323 DIAPRAGM ROOFPASS5/25/2022CHRIS BABCOCK
310 FRAME (W/M.P.E)PASS8/2/2022CHRIS BABCOCK
305 FRAME (W/M,PPASS11/4/2022CHRIS BABCOCK
525 ELECT ROUGHPASS1/24/2023CHRIS BABCOCK
750 T BAR CEILINGPASS1/26/2023CHRIS BABCOCK
**905 FINAL SFRPARTIAL7/7/2023CHRIS BABCOCK
**915 FINAL COMMERPARTIAL7/12/2023CHRIS BABCOCK
505 ELEC UNDERGROUNDPASS10/12/2021CHRIS BABCOCK
505 ELEC UNDERGROUNDPARTIAL10/20/2021CHRIS BABCOCK
495 PLB UNDERGROUNDPASS11/2/2021CHRIS BABCOCK
505 ELEC UNDERGROUNDPASS11/2/2021CHRIS BABCOCK
505 ELEC UNDERGROUND   
321 DIAPRAGM FLOORPASS3/3/2022CHRIS BABCOCK
321 DIAPRAGM FLOORPASS3/10/2022CHRIS BABCOCK
410 PLB UNDERGROUNDPARTIAL10/18/2021CHRIS BABCOCK
120 FOOTINGSNO INSPECTION9/21/2021CHRIS BABCOCK
410 PLB UNDERGROUND   
50 PRECON   
315 FRAME   
60 SETBACKS   
455 MECH ROUGH   
525 ELECT ROUGH   
620 INSULATION   
715 WALL BOARD   
740 LATH   
750 T BAR CEILING   
490 GAS TEST   
555 METER RELEASE   
991 LANDSCAPING   
992 STREET LIGHTING   
993 ENGINEERING   
996 WATER UTILITIES   
997 PLANNING   
410 PLB UNDERGROUNDNOT READY10/13/2021CHRIS BABCOCK
505 ELEC UNDERGROUNDNOT READY10/13/2021CHRIS BABCOCK
**905 FINAL SFRPASS8/9/2023CHRIS BABCOCK
323 DIAPRAGM ROOFPASS5/18/2022BING COSBY
340 SHEAR & DIAPRAGMPASS5/18/2022BING COSBY
425 PLUMB ROUGHNO INSPECTION5/18/2022BING COSBY
50 PRECONPASS3/16/2022CHRIS BABCOCK
115 FOOTINGSNOT READY3/17/2022CHRIS BABCOCK
410 PLB UNDERGROUNDPASS3/21/2022ELGIN M. ROWLAND
321 DIAPRAGM FLOORPASS3/21/2022ELGIN M. ROWLAND
415 PLB UNDERGROUNDPARTIAL3/22/2022CHRIS BABCOCK
321 DIAPRAGM FLOORPASS3/30/2022CHRIS BABCOCK
321 DIAPRAGM FLOORNO INSPECTION4/1/2022ELGIN M. ROWLAND
323 DIAPRAGM ROOFPASS4/20/2022CHRIS BABCOCK
322 DIAPRAGM SHEARPASS4/21/2022CHRIS BABCOCK
321 DIAPRAGM FLOORPASS4/22/2022CHRIS BABCOCK
425 PLUMB ROUGHPARTIAL4/26/2022CHRIS BABCOCK
322 DIAPRAGM SHEARPARTIAL4/26/2022CHRIS BABCOCK
340 SHEAR & DIAPRAGMPASS4/28/2022CHRIS BABCOCK
321 DIAPRAGM FLOORPASS4/29/2022CHRIS BABCOCK
323 DIAPRAGM ROOFPASS5/2/2022CHRIS BABCOCK
425 PLUMB ROUGHPASS5/2/2022CHRIS BABCOCK
340 SHEAR & DIAPRAGMNOT READY5/3/2022CHRIS BABCOCK
340 SHEAR & DIAPRAGMPARTIAL5/4/2022CHRIS BABCOCK
705 WALL BOARDPASS5/5/2022CHRIS BABCOCK
323 DIAPRAGM ROOFPASS5/5/2022CHRIS BABCOCK
710 WALL BOARDPARTIAL5/10/2022CHRIS BABCOCK
340 SHEAR & DIAPRAGMPASS5/10/2022CHRIS BABCOCK
323 DIAPRAGM ROOFPASS5/10/2022CHRIS BABCOCK
340 SHEAR & DIAPRAGMPASS5/13/2022CHRIS BABCOCK
425 PLUMB ROUGHNO INSPECTION5/16/2022BING COSBY
323 DIAPRAGM ROOFPARTIAL5/23/2022MICHAEL TROSTRUD
425 PLUMB ROUGHPASS5/23/2022MICHAEL TROSTRUD
323 DIAPRAGM ROOFPASS5/23/2022MICHAEL TROSTRUD
323 DIAPRAGM ROOFFAILED5/24/2022CHRIS BABCOCK
425 PLUMB ROUGHPASS5/24/2022CHRIS BABCOCK
322 DIAPRAGM SHEARPASS5/24/2022CHRIS BABCOCK
322 DIAPRAGM SHEAR 5/26/2022 
425 PLUMB ROUGHPASS5/27/2022CHRIS BABCOCK
425 PLUMB ROUGHFAILED5/31/2022CHRIS BABCOCK
710 WALL BOARDPASS6/15/2022MICHAEL TROSTRUD
323 DIAPRAGM ROOFFAILED5/11/2022CHRIS BABCOCK
323 DIAPRAGM ROOFPASS5/11/2022CHRIS BABCOCK
995 FIRENOT READY10/28/2021TIMOTHY HUERTA
FIRE LUMBER DROPPASS1/31/2022TIMOTHY HUERTA
120 FOOTINGSNO INSPECTION9/22/2021CHRIS BABCOCK
505 ELEC UNDERGROUNDNO INSPECTION10/8/2021CHRIS BABCOCK
505 ELEC UNDERGROUNDPARTIAL10/14/2021CHRIS BABCOCK
505 ELEC UNDERGROUNDPARTIAL10/22/2021CHRIS BABCOCK
495 PLB UNDERGROUNDPASS10/28/2021BING COSBY
505 ELEC UNDERGROUNDPASS10/28/2021BING COSBY
505 ELEC UNDERGROUNDPASS1/21/2022MARK WILLIAMS
250 CONCRETE SLABFAILED1/31/2022CHRIS BABCOCK
250 CONCRETE SLAB 2/1/2022 
410 PLB UNDERGROUNDPASS2/2/2022CHRIS BABCOCK
321 DIAPRAGM FLOORNOT READY3/2/2022CHRIS BABCOCK
321 DIAPRAGM FLOORPARTIAL4/4/2022ELGIN M. ROWLAND
505 ELEC UNDERGROUNDPARTIAL10/11/2021CHRIS BABCOCK
505 ELEC UNDERGROUNDPARTIAL10/21/2021CHRIS BABCOCK
Fees:
DescriptionAmountReceipt #Paid Date
RE-INSPECTION$238.00216299607/11/2023
TEMP CERT OF OCCUPANCY- INSP$399.85216082107/07/2023
TEMP CERT OF OCCUPANCY-PLAN CHK$31.84216299607/11/2023
INSPECTION (JAB)$0.00  
TEMPORARY METER RELEASE INSPECTION$267.69207034802/10/2023
TEMP METER RELEASE PLAN REVIEW$31.84207034802/10/2023
TEMPORARY METER RELEASE INSPECTION$267.69209636303/24/2023
TEMP METER RELEASE PLAN REVIEW$31.84209636303/24/2023
HOURLY PLAN REVIEW FEE$213.79193545907/12/2022
HOURLY PLAN REVIEW FEE$213.79209878703/29/2023
RESUBMITTAL$251.00190077605/23/2022
RESUBMITTAL$251.00190077605/23/2022
TEMP CERT OF OCC INSP-EA ADD 30 DAYS$223.63217882108/07/2023
TEMP CERT OF OCC-EA ADD 30 DAYS PLAN CHK$31.84217882108/07/2023
BLD-CERTIFICATE OF OCCUPANCY$40.00218171408/10/2023
WTR- PLAN CHECK COMM W/INT$3,135.97157312201/25/2021
NEW COMMERCIAL BLDG PLAN CHECK$20,906.47157312201/25/2021
FIRE PLAN CHECK -COMM W/INT$4,181.29157312201/25/2021
PLN-REVIEW OF BUILDING PERMIT$158.00157312201/25/2021
RESUBMITTAL$222.00172994409/03/2021
RE-INSPECTION$206.00182336601/27/2022
RE-INSPECTION$238.00218029708/08/2023
COMMERCIAL SMIP$14,028.00172994409/03/2021
FIRE INSPECT- COMM W/INT$6,704.71172994409/03/2021
GENERAL PLAN SURCHARGE$3,352.36172994409/03/2021
NEW COMMERCIAL BLDG PERMIT$33,523.57172994409/03/2021
PERMIT IMAGING SURCHARGE$5.00172994409/03/2021
PERMIT TECHNOLOGY SURCHARGE$670.47172994409/03/2021
PLAN CHECK TECHNOLOGY SURCHARGE$302.31172994409/03/2021
PLANS IMAGING SURCHARGE$0.00172994409/03/2021
SB 1473 GREEN TAX$2,000.00172994409/03/2021
PUBLIC FACILITY RESIDENTIAL$269,963.00172994409/03/2021
PARK - RESIDENTIAL ONLY$456,393.00172994409/03/2021
PUBLIC FACILITY NON-RESIDENTIAL$130,152.29172994409/03/2021
HOURLY PLAN REVIEW FEE$427.58172410508/27/2021
HOURLY PLAN REVIEW FEE$213.79187493104/11/2022

TOTAL FEES: $949,277.61
TOTAL FEES PAID: $949,277.61
TOTAL FEES DUE: $0.00