Today's Inspections

 
PERMITADDRESSINSPECTIONINSPECTORTIMERESULTCOMPLETED
Data pager
123
Page size:
PageSizeComboBox
select
 42 items in 3 pages
2514 DUNSTAN ST PARCEL B455 MECHANICAL ROUGHBING COSBY10:15  10:15
426 S NEVADA ST525 ELECT ROUGHBING COSBY09:45  09:45
1701 S CLEMENTINE ST**920E FINALBING COSBY11:00  11:00
1760 KRAFT ST**905 FINAL SFRBING COSBY08:45  08:45
1420 MISSION AVE105 FOOTINGSBING COSBY09:15  09:15
1632 ALVARADO ST**920F FINALBING COSBY10:30  10:30
1405 DENISE CIR410 PLB UNDERGROUNDBING COSBY12:30  12:30
2008 STEWART ST410 PLB UNDERGROUNDBING COSBY11:30  11:30
2008 STEWART ST**920F FINALBING COSBY11:30  11:30
3712 VIA CABRILLO**920E FINALDUSTIN STOTLER11:30  11:30
3013 ARNIES ALLEY**905 FINAL SFRDUSTIN STOTLER10:45  10:45
4201 GALBAR ST**905 FINAL SFRDUSTIN STOTLER11:15  11:15
4721, 4723 4725 4727 4729 4731 MERIDA WY615 INSULATIONDUSTIN STOTLER13:00  13:00
561, 563, 565 567 569 571 TOLEDO WY323 DIAPHRAGM ROOFDUSTIN STOTLER12:00  12:00
3590 MIRA PACIFIC DR**920E FINALDUSTIN STOTLER11:00  11:00
1226 LAGUNA ST315 FRAMEDUSTIN STOTLER10:00  10:00
1226 LAGUNA ST425 PLUMB ROUGHDUSTIN STOTLER10:00  10:00
1226 LAGUNA ST525 ELECT ROUGHDUSTIN STOTLER10:00  10:00
2518 DUNSTAN ST PARCEL A705 WALL BOARDDUSTIN STOTLER10:30  10:30
2518 DUNSTAN ST PARCEL A730 LATHDUSTIN STOTLER10:30  10:30
 

These inspection times are approximate and based on a 2 hour window upon the inspectors anticipated schedule. Schedules are entered at 8 AM for the current workday.