Today's Inspections

 
PERMITADDRESSINSPECTIONINSPECTORTIMERESULTCOMPLETED
Data pager
Page size:
PageSizeComboBox
select
 67 items in 4 pages
116 ELLERY ST**920F FINALBING COSBYTBDPASS  
1457 SALEM CT**905 FINAL SFRBUILDING INSPECTORTBD   
4112 VIA DEL REY550 METER RELEASECHRISTOPHER MULLIGAN09:30PASS09/18/202609:30
4112 VIA DEL REY**905 FINAL SFRCHRISTOPHER MULLIGAN09:30PASS09/18/202609:30
247 DOUGLAS DR 188**920F FINALCHRISTOPHER MULLIGAN08:15PASS09/18/202608:15
247 DOUGLAS DR 188485 GAS TESTCHRISTOPHER MULLIGAN08:30PASS09/18/202608:30
247 DOUGLAS DR 188550 METER RELEASECHRISTOPHER MULLIGAN08:30PASS09/18/202608:30
246 RANCHO DEL ORO DR #39**920F FINALCHRISTOPHER MULLIGAN10:15PASS09/18/202610:15
246 RANCHO DEL ORO DR #39485 GAS TESTCHRISTOPHER MULLIGAN10:15PASS09/18/202610:15
246 RANCHO DEL ORO DR #39550 METER RELEASECHRISTOPHER MULLIGAN10:15PASS09/18/202610:15
705 LOS ARBOLITOS BLVD**905 FINAL SFRCHRISTOPHER MULLIGAN08:00PASS09/18/202608:00
4112 VIA DEL REY510 ENERGY STORAGECHRISTOPHER MULLIGAN09:30PASS09/18/202609:30
4112 VIA DEL REY525 ELECT ROUGHCHRISTOPHER MULLIGAN09:30PASS09/18/202609:30
1457 SALEM CT**920E FINALCHRISTOPHER MULLIGAN09:00CORRECTIONS09/18/202609:00
919 MASTERS DR**905 FINAL SFRCHRISTOPHER MULLIGAN09:45PASS09/18/202609:45
784 GREGORY LN425 PLUMB ROUGHCHRISTOPHER MULLIGAN08:45NOT READY09/18/202608:45
784 GREGORY LN525 ELECT ROUGHCHRISTOPHER MULLIGAN08:45NOT READY09/18/202608:45
5535 NANDAY CT730 LATHCHRISTOPHER MULLIGANTBDPASS09/18/2026 
784 GREGORY LN485 GAS TESTCHRISTOPHER MULLIGAN08:45NOT READY09/18/202608:45
784 GREGORY LN321 DIAPRAGM FLOORCHRISTOPHER MULLIGAN08:45NOT READY09/18/202608:45
 

These inspection times are approximate and based on a 2 hour window upon the inspectors anticipated schedule. Schedules are entered at 8 AM for the current workday.